Minn. Stat. § 18B.08
Subd. 1. Permit required.
Subd. 2. Pesticide.
A pesticide used under a chemigation permit must be suitable and labeled for application through an irrigation system.
Subd. 3. Equipment.
A chemigation system must be fitted with effective antisiphon devices or check valves that prevent the backflow of pesticides or pesticide-water mixtures into water supplies or other materials during times of irrigation system failure or equipment shutdown. The devices or valves must be installed between:
Subd. 4. Application fee.
A person applying for a chemigation permit must pay a nonrefundable application fee of $250. A person who holds a fertilizer chemigation permit under section 18C.205, is exempt from the fee in this subdivision.
Subd. 5.
[Repealed, 1996 c 310 s 1]