Learn More
Log In
Sign Up
401 Ky. Admin. Regs. 61 – Existing Source Standards | Midpage
Collections
Kentucky Administrative Regulations
Title 401
Chapter 61
401 Ky. Admin. Regs. 61
Existing Source Standards
Energy and Environment Cabinet - Department for Environmental Protection
001
Definitions for 401 KAR Chapter 61.
005
General provisions.
010
Existing incinerators.
011
Existing municipal solid waste incinerators.
013
Existing medical waste incinerators.
015
Existing indirect heat exchangers.
020
Existing process operations.
025
Existing kraft (sulfate) pulp mills.
030
Existing sulfuric acid plants.
035
Existing process gas streams.
036
Emission guidelines and compliance times for municipal solid waste (MSW) landfills.
040
Existing ethylene producing plants.
045
Existing oil-effluent water separators.
050
Existing storage vessels for petroleum liquids.
055
Existing loading facilities at bulk gasoline terminals.
056
Existing bulk gasoline plants.
060
Existing sources using organic solvents.
065
Existing nitric acid plants.
070
Existing ferroalloy production facilities.
075
Steel plants and foundries using existing electric arc furnaces.
080
Steel plants using existing basic oxygen process furnaces.
085
Existing service stations.
090
Existing automobile and light-duty truck surface coating operations.
095
Existing solvent metal cleaning equipment.
100
Existing insulation of magnet wire operations.
105
Existing metal furniture surface coating operations.
110
Existing large appliance surface coating operations.
120
Existing fabric, vinyl and paper surface coating operations.
122
Existing graphic arts facilities using rotogravure and flexography.
124
Existing factory surface coating operations of flat wood paneling.
125
Existing can surface coating operations.
130
Existing coil surface coating operations.
132
Existing miscellaneous metal parts and products surface coating operations.
135
Selected existing petroleum refining processes and equipment.
137
Leaks from existing petroleum refinery equipment.
140
Existing by-product coke manufacturing plants.
145
Existing petroleum refineries.
150
Existing synthesized pharmaceutical product manufacturing operations.
155
Existing pneumatic rubber tire manufacturing plants.
160
Existing perchloroethylene dry cleaning systems.
165
Existing primary aluminum reduction plants.
170
Existing blast furnace casthouses.
175
Leaks from existing synthetic organic chemical and polymer manufacturing equipment.
180
Not available.