Ind. Admin. Code tit. 675, r. 30-3-10
Authority: IC 22-13-2-8
Affected: IC 22-15-6
Sec. 10. The owner or user shall prepare each boiler or unfired pressure vessel for internal inspection and shall prepare for and apply a hydrostatic leak test whenever necessary, on the date specified by the inspector responsible for inspection of the equipment in question, which date shall be no less than fourteen (14) days after the date of notification.
(Fire Prevention and Building Safety Commission; 675 IAC 30-3-10; filed Jan 5, 1996, 10:15 a.m.: 19 IR 1115; readopted filed Jul 9, 2001, 1:33 p.m.: 24 IR 3822; readopted filed Sep 21, 2007, 9:16 a.m.: 20071010-IR-680070389RFA; readopted filed Oct 19, 2007, 1:08 p.m.: 20071114-IR-680070389RFA; readopted filed Sep 5, 2013, 10:09 a.m.: 20131009-IR-680130182RFA; readopted filed Sep 4, 2019, 2:20 p.m.: 20191002-IR-675190336RFA; filed Apr 28, 2021, 11:03 a.m.: 20210526-IR-675200627FRA, eff Jul 1, 2021; readopted filed Nov 18, 2025, 10:36 a.m.: 20251210-IR-675240566RFA) NOTE: Transferred from the Boiler and Pressure Vessel Rules Board (680 IAC 2-3-10) to the Fire Prevention and Building Safety Commission (675 IAC 30-3-10) by P.L.249-2019, SECTION 15, effective July 1, 2019.