Ind. Admin. Code tit. 410, r. 6-10.1-92
Authority: IC 16-19-3-4
Affected: IC 16-19-3-4
Sec. 92. (a) Site preparation, tilling, construction, finish grading, and soil stabilization shall:
(b) Elevated sand mound soil absorption systems, as follows, shall not be constructed during periods of wet weather when the soil is sufficiently wet at the depth of installation to exceed its plastic limit:
(1) This applies to soils classified as the following:
(Indiana Department of Health; 410 IAC 6-10.1-92; filed Oct 19, 2012, 2:07 p.m.: 20121114-IR-410120157FRA; readopted filed Sep 26, 2018, 2:48 p.m.: 20181024-IR-410180328RFA; readopted filed Nov 14, 2024, 1:24 p.m.: 20241211-IR-410230798RFA)