Ind. Admin. Code tit. 326, r. 2-5.1-4
Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-15-4-9; IC 13-17
Sec. 4. (a) The commissioner shall include an approval to operate and operating conditions in an initial construction permit. The level of approval shall be as follows:
(3) A source must obtain approval to operate as a Part 70 source under 326 IAC 2-7 if:
(b) If all terms and conditions of 326 IAC 2-1.1-6 were satisfied in the processing of the construction permit, then the emission limitations may be included in the subsequent operating permit without repeating the public notice requirements in 326 IAC 2-1.1-6.
(Air Pollution Control Division; 326 IAC 2-5.1-4; filed Nov 25, 1998, 12:13 p.m.: 22 IR 1011; filed Aug 10, 2004, 3:35 p.m.: 27 IR 3947; readopted filed Oct 18, 2024, 2:09 p.m.: 20241113-IR-326230809RFA; errata filed Jun 3, 2025, 1:59 p.m.: 20250618-IR-326250285ACA)