Ind. Admin. Code tit. 312, r. 29-21-3
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 3. (a) Within one hundred twenty (120) days after the conclusion of well drilling operations or sixty (60) days after well completion activities, whichever occurs first, the owner or operator shall remove all pumpable liquids contained in well drilling pits or completion pits to the maximum extent practical, and manage or dispose of the liquids by any of the following methods:
(b) After removal of all pumpable liquids from a drilling or completion pit, an owner or operator may bury the remaining contents of a pit used in conjunction with fresh water drilling or completion activities as follows:
(1) The material shall be solidified or stabilized to ensure the physical characteristics of the solidified or stabilized solids closely resemble the stability of adjacent soil materials by combining the material with:
(2) The burial site shall be:
(c) After removal of all pumpable liquids from a drilling or completion pit used in conjunction with saltwater-based or oil-based drilling or completion activities, an owner or operator may transport the waste to a permitted landfill authorized to accept the waste or bury the remaining contents of a pit provided the following requirements are met:
(5) The material is solidified or stabilized to ensure the physical characteristics of the solidified or stabilized solids closely resemble adjacent soil materials by combining with:
(6) The burial site shall be:
(8) Within thirty (30) days after drilling or completion pit closure, the owner or operator shall submit a report of pit closure to the division of reclamation on a form prescribed by the division of reclamation showing the:
(d) Except as provided in subsection (c)(7), any synthetic liner used shall be removed to the fullest extent practicable and properly disposed of or recycled.
(e) Within one hundred twenty (120) days after conclusion of well drilling operations or sixty (60) days of well completion operations, whichever occurs first, the owner or operator shall close drilling and completion pits by:
(Natural Resources Commission; 312 IAC 29-21-3; filed Dec 1, 2017, 10:35 a.m.: 20171227-IR-312160230FRA; readopted filed Jan 17, 2023, 1:53 p.m.: 20230215-IR-312220328RFA; errata filed Mar 18, 2026, 9:59 a.m.: 20260325-IR-312260094ACA)