Ind. Admin. Code tit. 312, r. 29-11-1
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 1. (a) This section establishes additional requirements for the drilling of a well for oil and gas purposes in locations identified as karst prone areas. An owner or operator shall drill all wells drilled in an identified karst prone area in accordance with this rule.
(b) The owner or operator shall determine if the well for oil and gas will be drilled in an identified karst prone area from maps maintained by the division of reclamation.
(c) For wells drilled in karst prone areas an owner or operator shall do the following:
(2) Set surface casing in an impervious formation that:
(d) The driller shall note and record in the drillers log and the completion report the depth of any areas where voids or lost-circulation zones were encountered while drilling.
(e) Prior to cementing the surface casing, cement baskets shall be installed on the casing at the first joint above each area where voids or lost-circulation zones were encountered. Lost-circulation materials or commonly used cement additives shall also be used where practical to reduce cement loss into karst features.
(f) If voids or lost-circulation zones are encountered while drilling below the surface casing seat, the owner or operator shall take appropriate measures to minimize cement loss into karst features as follows:
(Natural Resources Commission; 312 IAC 29-11-1; filed Dec 1, 2017, 10:35 a.m.: 20171227-IR-312160230FRA; readopted filed Jan 17, 2023, 1:53 p.m.: 20230215-IR-312220328RFA; errata filed Mar 18, 2026, 9:59 a.m.: 20260325-IR-312260094ACA)