Ind. Admin. Code tit. 312, r. 25-6-108
Authority: IC 14-34-2-1
Affected: IC 14-34
Sec. 108. (a) The design of each dam and embankment constructed of coal mine waste shall comply with the applicable requirements of sections 84 and 99 of this rule, modified as follows:
(b) Spillways and outlet works shall be designed to provide adequate protection against erosion and corrosion. Inlets shall be protected against blockage.
(c) Impounding structures constructed of or impounding coal mine waste shall be designed so that at least ninety percent (90%) of the water stored during the design precipitation event can be removed within a ten (10) day period.
(Natural Resources Commission; 312 IAC 25-6-108; filed Jun 21, 2001, 2:53 p.m.: 24 IR 3568, eff Dec 1, 2001; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFA; readopted filed Mar 26, 2019, 3:40 p.m.: 20190424-IR-312190011RFA; readopted filed Mar 25, 2025, 9:50 a.m.: 20250423-IR-312240574RFA)