Ind. Admin. Code tit. 312, r. 25-4-42
Authority: IC 14-34-2-1
Affected: IC 14-34
Sec. 42. (a) Each application shall contain a blasting plan for the proposed permit area. The blasting plan shall include the following:
(b) Each application shall contain a description of any system to be used to monitor compliance with the standards of 312 IAC 25-6-32. The description shall include the types, capabilities, sensitivities, and proposed locations of all blast monitoring equipment proposed to be used.
(c) Blasting operations proposed to be conducted within five hundred (500) feet measured horizontally of an active underground mine must be jointly approved by the director, the Indiana bureau of mines and mining, and the Mine Safety and Health Administration.
(Natural Resources Commission; 312 IAC 25-4-42; filed Jun 21, 2001, 2:53 p.m.: 24 IR 3453, eff Dec 1, 2001; readopted filed May 29, 2007, 9:51 a.m.: 20070613-IR-312070146RFA; readopted filed Sep 19, 2013, 10:12 a.m.: 20131016-IR-312130125RFA; readopted filed Mar 26, 2019, 3:40 p.m.: 20190424-IR-312190011RFA; readopted filed Mar 25, 2025, 9:50 a.m.: 20250423-IR-312240574RFA)