Ind. Code § 8-1-42-19
(a) If a CSE system installed in a unit does not generate electricity for eighteen (18) consecutive months:
(b) In the case of abandonment, as described in subsection (a), if the project owner fails to remove the CSE system project assets not later than one (1) year after the date of abandonment, as required by subsection (a)(2), the permit authority may engage qualified contractors to:
(4) remediate the site;
and may initiate proceedings to recover any costs incurred.
As added by P.L.90-2022, SEC.2.