Ind. Code § 8-1-2.4-4
(a) Subject to section 5 of this chapter, the commission shall require electric utilities and steam utilities to enter into long term contracts to:
(1) purchase or wheel electricity or useful thermal energy from alternate energy production facilities, cogeneration facilities, or small hydro facilities located in the utility's service territory, under the terms and conditions that the commission finds:
(c) The commission shall base the rates for new facilities or new capacity from existing facilities on the following factors:
(g) This section does not require an electric utility or steam utility to:
(2) distribute, transmit, deliver, or wheel electricity from a private generation project.
As added by Acts 1982, P.L.72, SEC.1. Amended by P.L.264-2017, SEC.3; P.L.156-2020, SEC.34.