Ind. Code § 5-30-6-2

Design criteria developer; conflict of interest

As added by P.L.74-2005, SEC.1.
  1. (a) The design criteria developer shall prepare the design criteria package.
  2. (b) The design criteria developer may not submit a proposal or furnish design or construction services under the contract.
  3. (c) The design-builder may not delegate or subcontract design services or construction services under the design-build contract to the design criteria developer.

As added by P.L.74-2005, SEC.1.