Ind. Code § 36-9-27-48
(a) Whenever, in the construction or reconstruction of a regulated drain, the county surveyor determines that:
(2) the equipment will interfere with the proper operation of the drain;
the county surveyor shall include in the county surveyor's plans the relocation requirements of the equipment. The county surveyor shall, by registered mail or certified mail, send a copy of the requirements to the public utility owning the equipment.
(c) If the board finds that the relocation of a pipeline, cable, or similar equipment owned by a public utility is necessary in the construction or reconstruction of a regulated drain, the cost of relocation shall be paid by the public utility.
[Pre-Local Government Recodification Citation: 19-4-6-3 part.]
As added by Acts 1981, P.L.309, SEC.101. Amended by P.L.127-2017, SEC.339; P.L.174-2022, SEC.77.