Deadlines for acting on applications; renewals
As added by P.L.1-1996, SEC.5. Amended by P.L.224-1999, SEC.4; P.L.138-2000, SEC.5; P.L.240-2003, SEC.9; P.L.78-2009, SEC.13; P.L.159-2011, SEC.20; P.L.223-2011, SEC.1; P.L.113-2014, SEC.64; P.L.135-2026, SEC.114.
(a) Except as provided in sections 2, 3, and 6 of this chapter, the commissioner shall approve or deny an application filed with the department after July 1, 1995, within the following number of days:
(1) Three hundred sixty-five (365) days for an application concerning the following waste permits:
- (A) A new hazardous waste or solid waste landfill.
- (B) A new hazardous waste or solid waste incinerator.
- (C) A major modification of a solid waste landfill.
- (D) A major modification of a solid waste incinerator.
- (E) A new hazardous waste treatment or storage facility.
- (F) A new Part B permit issued under 40 CFR 270 et seq. for an existing hazardous waste treatment or storage facility.
- (G) A Class 3 modification under 40 CFR 270.42 to a hazardous waste landfill.
- (H) A new solid waste processing facility other than a transfer station.
- (2) Except as provided in IC 13-18-3-2.1 , two hundred seventy
(270) days for an application concerning the following:
- (A) A Class 3 modification under 40 CFR 270.42 of a hazardous waste treatment or storage facility.
- (B) A major new National Pollutant Discharge Elimination System permit.
- (C) A major modification to a solid waste processing facility other than a transfer station.
- (3) Except as provided in IC 13-18-3-2.1 , one hundred eighty
(180) days for an application concerning the following:
- (A) A new transfer station or a major modification to a transfer station.
- (B) A minor new National Pollutant Discharge Elimination System individual permit.
- (C) A permit concerning the land application of a material.
- (D) A permit for marketing and distribution of a biosolid or an industrial waste product.
- (4) Except as provided in IC 13-18-3-2.1 , one hundred fifty (150) days for an application concerning a minor new National Pollutant Discharge Elimination System general permit.
- (5) One hundred twenty (120) days for an application concerning a Class 2 modification under 40 CFR 270.42 to a hazardous waste facility.
(6) Ninety (90) days for an application concerning the following:
(A) A minor modification to a waste permit for the following:
- (i) A solid waste landfill.
- (ii) A solid waste processing facility.
- (iii) An incinerator.
- (B) A wastewater facility or water facility construction permit.
- (7) The amount of time provided for in rules adopted by the board for an application for an air pollution permit.
(8) Sixty (60) days for an application concerning the following:
(A) A Class 1 modification under 40 CFR 270.42 requiring prior written approval, to a hazardous waste:
- (i) landfill;
- (ii) incinerator;
- (iii) treatment facility; or
- (iv) storage facility.
- (B) Any other permit not specifically described in this section for which the application fee exceeds forty-nine dollars ($49) and for which a time frame has not been established under section 3 of this chapter.
(b) When a person holding a valid permit concerning an activity of a continuing nature has made a timely and sufficient application for a renewal permit, the commissioner shall approve or deny the application on or before the expiration date stated in the permit for which renewal is sought.
[Pre-1996 Recodification Citation: 13-7-10.1-4(a).]
As added by P.L.1-1996, SEC.5. Amended by P.L.224-1999, SEC.4; P.L.138-2000, SEC.5; P.L.240-2003, SEC.9; P.L.78-2009, SEC.13; P.L.159-2011, SEC.20; P.L.223-2011, SEC.1; P.L.113-2014, SEC.64; P.L.135-2026, SEC.114.