Ind. Code § 13-14-8-9
(a) A variance from a water quality standard that is at least in part the basis of a National Pollutant Discharge Elimination System (NPDES) permit issued under this title must meet the conditions specified in:
(b) A variance from a water quality standard issued for waters within the Great Lakes system must meet the requirements of:
(2) 40 CFR 132;
as applicable. If two (2) or more inconsistent requirements could apply under 40 CFR 131.14 and 40 CFR 132 to a variance for waters within the Great Lakes system, the more stringent requirement applies to the variance.
(c) With respect to a variance relating to an NPDES permit for a combined sewer overflow discharge, this subsection is satisfied if the NPDES permit holder has prepared a long term control plan and is implementing the nine (9) minimum controls pursuant to:
(d) A variance may be granted under this section for a period as follows:
(2) For waters outside the Great Lakes system, any period that does not exceed a term authorized under 40 CFR 131.14.
However, a variance issued under this section for a period of more than five (5) years must be reevaluated in accordance with the requirements of 40 CFR 131.14.
(f) An application for a variance relating to an NPDES permit may be submitted under this section at any time before or after the issuance, renewal, or modification of the NPDES permit.
[Pre-1996 Recodification Citation: 13-7-7-6(b), (c) part, (f).]
As added by P.L.1-1996, SEC.4. Amended by P.L.231-2003, SEC.2; P.L.54-2005, SEC.1; P.L.147-2015, SEC.3; P.L.126-2020, SEC.2.