- a) Each Local Provider shall place a minimum of 80% of all newly constructed outside cable plant facilities (measured in sheath miles) underground.
- b) The telecommunications outside plant shall be designed, constructed, maintained and operated in accordance with the provisions of 83 Ill. Adm. Code 305 and 83 Ill. Adm. Code 265.
(Source: Amended at 39 Ill. Reg. 364, effective December 22, 2014)