Ga. Comp. R. & Regs. r. 672-5-.07
Rule 672-5-.07. Determination of Maximum Capacity Rating for Contractors
(2) The Maximum Capacity Rating will be a flat sum determined by the following formula:
Q = F [C + 60% (DA)]
Q = Maximum Capacity Rating
F = Ability or Multiplying Factor
C = Current Assets less current liabilities; plus plant and equipment used for road and bridge construction only
DA = Net Deferred Assets [(Property and plant and equipment not used for road and bridge construction only plus all non-current assets) - any deferred liabilities or non-current liabilities (maturing beyond one year)]. Net Deferred Assets will equal zero (0), if the calculated value is less than or equal to zero (0).
Authority: O.C.G.A. §§ 32-2-2, 32-2-66, 50-13-4.
History. Original Rule entitled "Determination of Classification and Maximum Capacity Rating" adopted. F. Aug. 9, 1973; eff. Aug. 29, 1973.
Amended: ER 672-5-0.4-.07 entitled "Determination of Maximum Capacity Rating" adopted. F. and eff. May 30, 1978, the date of adoption.
Amended: Permanent Rule adopted. F. Sept. 6, 1978; eff. Sept. 26, 1978.
Repealed: New Rule, same title adopted. F. Oct. 23, 2000; eff. Nov. 12, 2000.
Amended: F. Nov. 20, 2006; eff. Dec. 10, 2006.
Amended: New title "Determination of Maximum Capacity Rating for Contractors." F. May 1, 2018; eff. May 21, 2018.