69A-51.045 Existing and New Boiler Installations in Public Assembly Location; Exemptions.
- (1) The provisions of Rules 69A-51.045 and 69A-51.050, F.A.C., apply to existing and new installations of boilers in public assembly locations.
- (2) Existing installations are those boilers installed in public assembly locations before October 1, 1987.
(3) For existing installations:
- (a) The maximum allowable working pressure of a boiler carrying the ASME Code symbol stamp must be determined by the applicable sections of the ASME Code, which is incorporated by reference in Rule 69A-51.010, F.A.C., under which it was constructed and stamped.
- (b) The maximum allowable working pressure of a boiler that does not carry the ASME Code symbol must be computed in accordance with the National Board Inspection Code, which is incorporated by reference in Rule 69A-51.010, F.A.C.
- (4) New installations are those boilers installed in public assembly locations after September 30, 1987.
(5) No boiler shall be installed in a public assembly location in this state unless it has been constructed, inspected, and stamped in conformity with the ASME Code, which is incorporated by reference in Rule 69A-51.010, F.A.C., except:
- (a) Those exempted by the Act; or
- (b) Boilers which are federally owned and federally inspected; or
- (c) Coil type hot water boilers meet the requirements of Part PG-2.3, Section I of the ASME Code, which is incorporated by reference in Rule 69A-51.010, F.A.C.; or
- (d) Those potable water heaters exempted by Part HLW-101, Service Limits, Section IV of the ASME Code which is incorporated by reference in Rule 69A-51.010, F.A.C.
Rulemaking Authority 554.103, 554.108 FS. Law Implemented 554.103, 554.108, 554.109, 554.1101 FS. History–New 2-27-89, Formerly 4A-51.045, Amended 8-10-21.