Fla. Admin. Code R. 62B-33.024
(2) A 30-YEP shall be determined using one or more of the following procedures:
(a) The Department shall determine the 30-YEP for beaches where there is no beach nourishment or restoration project, and no coastal armoring, and the beaches that are not adjacent to an inlet, as follows: An average annual shoreline change rate (SCR) in the location of the MHWL at a Department reference survey monument shall be determined as set forth in subparagraphs 62B-33.024(2)(a)1. through 3., F.A.C., and multiplied by 30 years (Calculated Erosion Distance). The location of the 30-YEP is determined by projecting the location of the existing SHWL, as depicted on the application survey, landward by the Calculated Erosion Distance (SCR x 30 years). (see Figures 1 and 3):
1. The SCR shall be derived from historical shoreline data obtained from coastal topographic surveys and maps, controlled aerial photography, and similar sources approved by the Department. Data from periods of time that clearly do not represent current prevailing coastal processes acting on or likely to act on the site shall not be used.
2. The SCR shall include the zone spanned by three adjacent Department reference monuments on each side of the site. A lesser or greater number of reference monuments can be used as necessary to obtain a rate representative of the site, and a rationale for such use shall be provided.
3. In areas that the Department determines to be either stable or accreting, a minus one-foot per year SCR shall be applied as a conservative estimate.
(d) Beach nourishment or restoration projects shall be considered as follows:
1. Future beach nourishment or restoration projects shall be considered as existing if all funding arrangements have been made and all permits have been issued at the time the application is submitted.
2. Existing beach nourishment or restoration projects shall be considered to be either a one-time beach construction event or a long-term series of related sand placement events along a given length of shoreline provided such projects have resulted in and will continue to result in the presence of sand seaward of the ECL. The Department shall make a determination of remaining project life for such existing beach nourishment or restoration projects based on the project performance, the likelihood of continuing nourishments, the funding arrangements, and consistency with the Strategic Beach Management Plan adopted by the Department for managing the state’s critically eroded shoreline and the related coastal system.
3. The pre-project SCR shall be calculated as set forth in subparagraphs 62B-33.024(2)(a)1. through 3., F.A.C., derived from historical shoreline data for the time period before the first restoration occured. The Department will use the following stepwise procedure to determine the 30-YEP on a beach with a beach restoration or nourishment project. (see Figures 2 and 3):
a. The Department shall determine the distance between the MHWL and the SHWL, using either a pre-project survey or current locations of these lines, as appropriate. That distance will be added landward to the location of either an established ECL or pre-project surveyed MHWL, as appropriate, to establish the pre-project SHWL (PSHWL).
b. The difference between 30 years and the expected remaining life (in years) of the existing beach nourishment project will be multiplied by the pre-project SCR to determine the projected distance of erosion. The projected distance of erosion will be added landward to the location of the PSHWL calculated under subparagraphs 62B-33.024(2)(a)1. through 3., F.A.C., and will represent the 30-YEP.
4. If the Department is unable to scientifically determine a pre-project erosion rate due to a lack of pre-project data, the Department shall set the 30-YEP along an existing, reasonably continuous, and uniform line of construction that has been shown to be not unduly affected by erosion.
FIGURE 1: 30-YEP Calculation for a Non-restored Beach
30-YEP = (Historical Erosion Rate feet/year) X (30 years) landward of the existing SHWL
FIGURE 2: 30-YEP for a Restored/Nourished Beach
30-YEP = (30 Project Credit years) X (Historical Erosion Rate feet/year) landward of the Pre-Project SHWL
FIGURE 3: Cross-Section of Figures 1 and 2.
Rulemaking Authority 161.053(20) FS. Law Implemented 161.053(5) FS. History–New 11-10-85, Formerly 16B-33.24, 16B-33.024, Amended 1-26-98, 6-13-04, 5-31-07, 10-4-18.