D.C. Mun. Regs. tit. 21, § 112
112.1 Fees for installation, removal of water and sewer connection, water meter repair, removal, and resettings shall be as follows:
| Water Tap Removal | $310.00 |
|---|---|
| Water Connection Removal | $610.00 |
| Sewer Tap Removal | $235.00 |
| Pointing up sewer taps | $660.00 |
| Insertion of Y-branch | $235.00 |
| 1 inch | $325.00 |
|---|---|
| 1 1/2 inch | $380.00 |
| 2 inch | $415.00 |
| Water Connection | Reimbursable |
112.2 Fees for a fire hydrant flow test and for the installation and removal of water bubblers shall be as follows:
| Fire Hydrant Flow test (no recent record available) | $225.00 |
|---|---|
| Fire Hydrant Flow test (recent record available) | $25.00 |
| Fire Hydrant use per day | Usage-Based |
| 1 Water Bubbler | $262.00 |
|---|---|
| Each additional Water Bubbler after the first | $54.00 |
112.3 For the purposes of § 112.2, the phrase "in the same general location" means that the distance between the first and last bubbler of the group is eight thousand feet (8,000 ft.) or less. A distance greater than eight thousand feet (8,000 ft.) shall require a separate crew.
112.4 Retail and commercial customer fees and charges shall be as follows:
| Customer Bad Check Fee | $25.00 |
|---|---|
| Declined Credit Card Fee | $35.00 |
| Customer Penalty Late Fee | $10.00% |
| Additional Late Fee | 1% /month |
| Turn-On Fee | $50.00 |
| Turn-Off Charges for Non Payment | $50.00 |
| Unauthorized Turn-On | $245.00 |
| Broken Bypass Seal | $700.00 |
Second Water Audit within 24 months $125.00
112.5 Fees for engineering reviews, sale of documents, maps and manuals shall be as follows:
Engineering Reviews, Sale of Documents, Maps and Manuals
Engineering Review
Utility Design Review
Development is more than 10 residential units or commercial $2,500.00
Development is 10 residential units or less (2 to 10 houses) $250.00
Feasibility Review Fee (Water & Sewer Availability letter)
Existing or Proposed House $300.00
Fee for Sheeting & Shoring Review and Inspection of Site Work Potentially
Impacting WASA Pipelines (2 reviews)
Simple Review $500.00
Complex Review $1,000.00
Sale of Manuals
Design Manuals $60.00
Revisions/Updates $25.00
Construction Standard Details $35.00
Revisions/Updates $10.00
Construction General Conditions & Standard Specifications $25.00
Revisions/Updates $5.00
Fee for WASA Pipeline Design Manual $75.00
Revisions/Updates $30.00
Preparing As-Built Drawings $215.00
Reproduction of Maps and Technical Documents (Charge per Sheet)
Xerographic $2.50
Vellum $4.00
Mylar $5.50
Standard Photocopying (Charge Per Page) - For Legal and Letter Size Paper $0.25
Electronic Version of Water/Sewer Counter and As-Built Maps per project $100.00
Updates of Electronic Version of Water/Sewer Counter and As Built Maps per project $25.00
112.6 Pre-Treatment fees shall be as follows:
Pre-Treatment
Waste Hauling - Annual Fee per Vehicle
Vehicles 0 - 100 gallons $100.00
Vehicles 101 - 500 gallons $255.00
Vehicles 501 - 1,500 gallons $590.00
Vehicles greater than 1,500 gallons $1,650.00
112.7 Private Lead Service Line Replacement Fee
(a) The fee for replacing the customer's portion of the lead water service line outside the home shall be $100 per linear foot;
(b) The fee for replacing the customer's portion of the lead water service line from the point of entry outside the house to the first threaded connection inside the house shall be $500; and
(c) These fees shall be evaluated and revised as necessary within one year to continue to reflect the actual cost of replacing the customer's portion of the lead water service line.
112.8 RIGHT OF WAY OCCUPANCY FEE PASS THROUGH CHARGE / PILOT FEE - The Right of Way Occupancy Fee Pass Through Charge / Pilot Fee, assessed to recover the cost of fees charged by the District of Columbia to the Water and Sewer Authority for use of District of Columbia public space and rights of ways, shall be as follows:
(a) Effective October 1, 2009, the Right of Way Occupancy Fee Pass Through Charge / Pilot Fee shall be increased from Fifty-Two Cents ($0.52) to Fifty-Seven Cents ($0.57) for each One Hundred Cubic Feet ("Ccf") of water used, divided as follows:
(1) Payment in Lieu of Taxes, Forty-Three Cents ($0.43) per Ccf; and
(2) District of Columbia Right of Way Fee, Fourteen Cents ($0.14) per Ccf.
SOURCE: Final Rulemaking published at 31 DCR 1729 (April 13, 1984); as amended by Final Rulemaking published at 33 DCR 3109 (May 23, 1986); as amended by Final Rulemaking published at 46 DCR 5943 (July 16, 1999); as amended by Final Rulemaking published at 49 DCR 5977 (June 28, 2002); as amended by Final Rulemaking published at 50 DCR 6448 (August 8, 2003); as amended by Final Rulemaking published at 51 DCR 6836 (July 9, 2004); as amended by Final Rulemaking published at 52 DCR 8527 (September 16, 2005); as amended by Final Rulemaking published at 53 DCR 7654 (September 22, 2006); as amended by Final Rulemaking published at 54 DCR 9180 (September 21, 2007); as amended by Final Rulemaking published at 55 DCR 9844 (September 19, 2008); as amended by Final Rulemaking published at 56 DCR 7543 (September 18, 2009).