5 CCR 1001-27
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT REGULATION NUMBER 23 REGIONAL HAZE LIMITS 5 CCR 1001-27 [Editor’s Notes follow the text of the rules at the end of this CCR Document.] _________________________________________________________________________ Outline of Regulation PART A Best Available Retrofit Technology (BART) and Reasonable Progress (RP)
Federal Regulations Adopted by Reference 40 CFR Part 60 and Appendices (July 1, 2020)
40 CFR Part 63, Subpart A - National Emission Standards for Hazardous Air Pollutants General Provisions (August 23, 2019) and Subpart LLL - National Emission Standards for Hazardous Air Pollutants from the Portland Cement Manufacturing Industry (August 3, 2018) 40 CFR Part 64 (October 22, 1997)
40 CFR Part 75 including Performance Specifications and Appendices (January 18, 2012) 40 CFR Part 51, Appendix Y (July 6, 2005)
PART A Regional Haze Limits – Best Available Retrofit Technology (BART) and Reasonable Progress (RP)
I. Applicability The provisions of this regulation apply to existing stationary facilities (BART eligible sources), as defined in Section II.M. of this regulation, as well as to reasonable progress (RP) sources. The provisions of Section IV. (Regional Haze Determinations) and V. (MRR) of Regulation Number 23 are incorporated into Colorado’s Regional Haze State Implementation Plan. All other sections of Regulation Number 23 are State-Only.
II. Definitions II.A. “Adverse Impact on Visibility” means visibility impairment that interferes with the management, protection, preservation, or enjoyment of the visitor’s visual experience of the Federal Class I area. This determination must be made on a case-by-case basis taking into account the geographic extent, intensity, duration, frequency and time of visibility impairments, and how these factors correlate with (1) times of visitor use of the Federal Class I area, and (2) the frequency and timing of natural conditions that reduce visibility. This term does not include effects on integral vistas.
II.B. “Area Classifications” mean II.B.1. Class I areas (may not be redesignated)
II.B.2.d. National Parks: Black Canyon of the Gunnison (those portions not included as National Wilderness Areas in Section II.B.1.b.)
II.B.3. The following areas may be redesignated only as Class I or II. II.B.3.a. An area that exceeds ten thousand acres in size and is a national monument, a national primitive area, a national preserve, a national recreational area, a national wild and scenic river, a national wildlife refuge, a national lakeshore; and II.B.3.b. A national park or national wilderness area established after August 7, 1977, that exceeds ten thousand acres in size.
II.B.4. The Commission recognizes out of state Class I areas that have been listed in the Federal Register (44 Fed. Reg. 69124). Emissions from sources in Colorado must not violate any standard in these areas.
II.C. “Available Technology” means that a technology is licensed and available through commercial sales.
II.D. “Applicable Technology” means a commercially available control option that has been or may soon be deployed on the same or a similar source type or a technology that has been used on a pollutant-bearing gas stream that is the same or similar to the gas stream characteristics of the source.
II.E. “Average Cost Effectiveness” means the total annualized costs of control divided by annual emissions reductions (the difference between baseline annual emissions and the estimate of emissions after controls). For the purposes of calculating average cost effectiveness, baseline annual emissions mean a realistic depiction of anticipated annual emissions for the source. The source or the Division may use state or federally enforceable permit limits or estimate the anticipated annual emissions based upon actual emissions from a representative baseline period. II.F. “BART Alternative” means an alternative measure to the installation, operation, and maintenance of BART that will achieve greater reasonable progress toward national visibility goals than would have resulted from the installation, operation, and maintenance of BART at BART-eligible sources within industry source categories subject to BART requirements. II.G. “BART Alternative Program Unit” means any unit subject to a Regional Haze emission limit contained in the Table in Regulation Number 23, Section IV.C. II.H. “BART-Eligible Source” means an existing stationary facility as defined in Section II.M. II.I. “BART Unit” means any unit subject to a Regional Haze emission limit contained in the Table in Regulation Number 23, Section IV.A.
II.J. “Best Available Retrofit Technology (BART)” means an emission limitation based on the degree of reduction achievable through the application of the best system of continuous emission reduction for each pollutant that is emitted by an existing stationary facility. The emission limitation must be established, on a case-by-case basis, taking into consideration the technology available, the costs of compliance, the energy and non-air quality environmental impacts of compliance, any pollution control equipment in use or in existence at the source or unit, the remaining useful life of the source or unit, and the degree of improvement in visibility which may reasonably be anticipated to result from the use of such technology. II.K. “Continuous Emission Monitoring System” or “CEMS” means the equipment required by Regulation Number 23, Section VII., to sample, analyze, measure, and provide (using an automated data acquisition and handling system (DAHS)), a permanent record of SO2 or NOx emissions, other pollutant emissions, diluents, or stack gas volumetric flow rate. II.L. “Deciview” means a measurement of visibility impairment. A deciview is a haze index derived from calculated light extinction, such that uniform changes in haziness correspond to uniform incremental changes in perception across the entire range of conditions, from pristine to highly impaired. The deciview haze index is calculated based on the following equation (for the purposes of calculating deciview, the atmospheric light extinction coefficient must be calculated from aerosol measurements)
II.M. “Existing Stationary Facility” means any of the following stationary sources of air pollutants, including any reconstructed source, which was not in operation prior to August 7, 1962, and was in existence on August 7, 1977, and has the potential to emit 250 tons per year or more of any visibility impairing air pollutant. In determining potential to emit, fugitive emissions, to the extent quantifiable, must be counted.
II.M.2. Coal cleaning plants (thermal dryers).
II.M.3. Kraft pulp mills.
II.M.4. Portland cement plants.
II.M.5. Primary zinc smelters.
II.M.6. Iron and steel mill plants.
II.M.7. Primary aluminum ore reduction plants.
II.M.8. Primary copper smelters.
II.M.9. Municipal incinerators capable of charging more than 250 tons of refuse per day. II.M.10. Hydrofluoric, sulfuric, and nitric acid plants. II.M.11. Petroleum refineries.
II.M.12. Lime plants.
II.M.13. Phosphate rock processing plants, including all types of phosphate rock processing facilities, including elemental phosphorous plants as well as fertilizer production plants. II.M.14. Coke oven batteries.
II.M.15. Sulfur recovery plants.
II.M.16. Carbon black plants (furnace process).
II.M.17. Primary lead smelters.
II.M.18. Fuel conversion plants.
II.M.19. Sintering plants.
II.M.20. Secondary metal production facilities, including nonferrous metal facilities included within Standard Industrial Classification code 3341, and secondary ferrous metal facilities in the category ‘‘iron and steel mill plants.’’ II.M.21. Chemical process plants, including those facilities within the 2-digit Standard Industrial Classification 28, including pharmaceutical manufacturing facilities. II.M.22. Fossil-fuel boilers of more than 250 million BTUs per hour heat input. II.M.22.a. Individual boilers greater than 250 million BTU/hr, considering federally enforceable operational limits.
II.M.25. Glass fiber processing plants.
II.M.26. Charcoal production facilities, including charcoal briquette manufacturing and activated carbon production.
II.N. “Incremental Cost Effectiveness” means the comparison of the costs and emissions performance level of a control option to those of the next most stringent option, as shown in the following formula Incremental Cost Effectiveness (dollars per incremental ton removed) = [(Total annualized costs of control option) - (Total annualized costs of next control option)] [(Next Control option annual emissions) - (control option annual emissions)] II.O. “In Existence” means that the owner or operator has obtained all necessary preconstruction approvals or permits required by Federal, State, or local air pollution emissions and air quality laws or regulations and either has (1) begun, or caused to begin, a continuous program of physical on-site construction of the facility or (2) entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the facility to be completed in a reasonable time.
II.P. “In Operation” means engaged in activity related to the primary design function of the source. II.Q. “Integral Vista” means a view perceived from within the mandatory Class I Federal area of a specific landmark or panorama located outside the boundary of the mandatory Class I Federal area.
II.R. “Natural Conditions” means naturally occurring phenomena that reduce visibility as measured in terms of light extinction, visual range, contrast, or coloration. II.S. “Operating Day” means any twenty-four-hour period between midnight and the following midnight during which any fuel is combusted at any time in a BART unit, BART alternative program unit, or reasonable progress unit.
II.T. “Plant” means all emissions units at a stationary source. II.U. “Reasonable Progress unit” or “RP unit” means any unit subject to a Regional Haze emission limit contained in the Table in Regulation Number 23, Section IV.B. II.V. “Regional Haze emission limit” means any of the emission limits specified in the tables contained in Regulation Number 23, Section IV.
II.W. “Visibility-Impairing Air Pollutant” includes the following II.W.1. Sulfur dioxide (SO2).
III. Challenge of Division BART Determinations and Enforceable Agreements III.A. Persons affected or aggrieved by a BART determination may challenge the decision of the Commission pursuant to Article 4 of Title 24, C.R.S.
IV. Regional Haze Determinations IV.A. BART Determinations IV.A.1. The provisions of this Section IV.A. of Regulation Number 23 will be incorporated into Colorado’s Regional Haze State Implementation Plan.
CENC Unit 5 0.19 lb/MMBtu (30-day rolling average) 1.0lb/MMBtu 0.07 lb/MMBtu or (30-day rolling average)
Craig Unit 1 * 0.11 lb/MMBtu 0.03 lb/MMBtu (30-day rolling average)
Craig Unit 2 0.08 lb/MMBtu 0.11 lb/MMBtu 0.03 lb/MMBtu (30-day rolling average) (30-day rolling average)
*Refer to Section IV.D. for requirements Particulate Unit NOx Emission Limit SO2 Emission Limit Emission Limit
Comanche Unit 1 (30-day rolling average) (individual unit 30-day rolling average)
(combined annual average for units 1 & 2)
Comanche Unit 2 (30-day rolling average) (individual unit 30-day rolling average)
(combined annual average for units 1 & 2)
0.08lb/MMBtu 0.13 lb/MMBtu 0.03 lb/MMBtu Hayden Unit 1 (30-day rolling average) (30-day rolling average)
Hayden Unit 2 (30-day rolling average) (30-day rolling average)
Martin Drake Unit 5 (30-day rolling average) (30-day rolling average) 0.31lb/MMBtu 0.13lb/MMBtu 0.03 lb/MMBtu Martin Drake Unit 6 (30-day rolling average) (30-day rolling average)
Martin Drake Unit 7 (30-day rolling average) (30-day rolling average)
CEMEX – dry feed 20% Lyons Kiln (30-day rolling average) (12-month rolling average) opacity
CEMEX – Lyons Dryer 10% opacity IV.A.3. Each source listed in the above tables must comply with the above limits and averaging times as expeditiously as practicable, but in no event later than five years after EPA approval of Colorado’s state implementation plan for regional haze, which was January 30, 2013, with the exception of Craig Unit 1, or relevant component thereof. Each source listed in the above tables must maintain control equipment or operational practices required to comply with the above limits and averaging times, and establish procedures to ensure that such equipment or operational practices are properly operated and maintained.
IV.B. Reasonable Progress Determinations IV.B.1. The provisions of this Section IV.B of Regulation Number 23 will be incorporated into Colorado’s Regional Haze State Implementation Plan.
Nixon 0.21 lb/MMBtu 0.11 lb/MMBtu 0.03 lb/MMBtu (30-day rolling average) (30-day rolling average)
Clark Shutdown 12/31/2013 Shutdown 12/31/2013 Shutdown 12/31/2013 Units 1 & 2 Shutdown 12/31/2013 Holcim - Florence 2.73 lbs/ton clinker 1.30 lbs/ton clinker 246.3 tons/year Kiln (30-day rolling average) (30-day rolling average)
*Refer to Section IV.E. for requirements RP Determinations for Colorado Sources Particulate Emission Emission Unit NOx Emission Limit SO2 Emission Limit Limit Craig 0.28 lb/MMBtu 0.15 lb/MMBtu 0.013 lb/MMBtu filterable PM Unit 3 (30-day rolling average) (30-day rolling average)
IV.C. Public Service Company of Colorado (PSCo) BART Alternative Program IV.C.1. The provisions of this Section IV.C. of Regulation Number 23 (with the exception of the SO2 cap of Section IV.C.4.) will be incorporated into Colorado’s Regional Haze State Implementation Plan.
Pawnee 0.07 lb/MMBTU 0.12 lbs/MMBtu 0.03 lbs/MMBtu (30-day rolling average) by (30-day rolling average)
IV.E. Nucla Compliance Requirements IV.E.1. Nucla Station will close on or before December 31, 2022. Nucla Station closed in September 2019.
IV.F. Regional Haze Second Implementation Period, Reasonable Progress Determinations IV.F.1. The following sources will close no later than the associated date. The sources must comply with the applicable emission limits in Section IV. and monitoring, recordkeeping, and reporting requirements in Section V. until the closure date. IV.F.1.a. Cherokee Unit 4 will close no later than December 31, 2028. IV.F.1.b. ColoWyo Coal Mine will cease coal production no later than December 31, 2031.
3,050 tpy 1,830 tpy (12-month rolling average) (12-month rolling average)
IV.F.1.e. Craig Unit 2 will close no later than September 30, 2028. IV.F.1.f. Craig Unit 3 will close no later than December 31, 2029. IV.F.1.g. Martin Drake Units 6 and 7 will close no later than December 31, 2022. IV.F.1.g.(i) 375 tpy NOx, 10 tpy SO2, and 29 tpy of PM/PM10 will be reserved for Drake Units 6 and 7 for netting or offsets. PM/PM10 includes condensable and filterable fractions from this coal-fired unit. Offsets are subject to requirements in Regulation Number 3, Part A, Section V.
IV.F.1.h. Nixon Unit 1 will close no later than December 31, 2029. IV.F.1.h.(i) 375 tpy NOx, 10 tpy SO2, and 29 tpy of PM/PM10 will be reserved for Nixon Unit 1 for netting or offsets. PM/PM10 includes condensable and filterable fractions from this coal-fired unit. Offsets are subject to requirements in Regulation Number 3, Part A, Section V. IV.F.1.i. Rawhide Unit 1 will close no later than December 31, 2029. IV.F.1.i.(i) 200 tpy NOx, 50 tpy SO2, and 50 tpy of PM/PM10 will be reserved for Rawhide Unit 1 for netting or offsets. PM/PM10 includes condensable and filterable fractions from this coal-fired unit. Offsets are subject to requirements in Regulation Number 3, Part A, Section V. IV.F.2. Emission reductions reserved for netting or offsets provide for reasonable progress toward national visibility goals.
V. Monitoring, Recordkeeping, and Reporting for Regional Haze Limits The provisions of this Section V. of Regulation Number 23 will be incorporated into Colorado’s Regional Haze State Implementation Plan.
V.A. Monitoring/Compliance Determination: SO2 and NOx Regional Haze Limits V.A.1. BART, RP, and BART alternative program units with SO2 and NOx CEMS. V.A.1.a. All Boilers, except CENC and Clark boilers.
V.A.1.a.(i)(A) Regional haze limits with a 3-hour averaging period: emissions must be calculated on a 3-hour rolling average basis. At the end of each operating hour, the owner/operator must calculate and record a new 3-hour average emission rate in lb/MMBtu from the arithmetic average of the valid hourly emission rates from the CEMS for the previous three operating hours. (An operating hour is any hour in which fuel is combusted for any time in the unit.)
V.A.1.a.(i)(B) Regional haze limits with a 30-day averaging period: before the end of each operating day, the owner/operator must calculate and record the 30-day rolling average emission rate in lb/MMBtu from all valid hourly emission values from the CEMS for the previous 30 operating days.
V.A.1.a.(i)(C) Regional haze limits with a 90-day averaging period: before the end of each operating day, the owner/operator must calculate and record the 90-day rolling average emission rate in lb/MMBtu from all valid hourly emission values from the CEMS for the previous 90 operating days.
V.A.1.a.(i)(D) Regional haze limits with a 12-month averaging period: before the end of each month, the owner/operator must calculate and record the 12-month rolling average emission rate in lb/MMBtu from all valid hourly emission values from the CEMS for the previous 12 months.
V.A.1.a.(i)(E) Regional haze limits with an annual calendar averaging period: emissions must be calculated on a calendar year basis. Within 30 days after the end of each calendar year, the owner/operator must calculate and record a new emission rate in lb/MMBtu from the arithmetic average of all valid hourly emission rates from the CEMS for the preceding year.
V.A.1.a.(i)(F) Comanche Units 1 and 2 regional haze combined annual average limits. The combined annual limitations for NOX and SO2 are on a 365-operating day rolling average. Before the end of each operating day, the owner/operator must calculate and record an annual rolling average using data from the previous 365 operating days in accordance with the following equation. Combined emission rate (lb/MMBtu) = [(ER1)(HI1) + (ER2)(HI2)]/(HI1 + HI2)
Where: ER1 = average emission rate over the 365 operating day period. This is an average of all valid hours within the 365 operating day period for Unit 1.
HI1 = total heat input over the 365 operating day period for Unit 1. ER2 = average emission rate over the 365 operating day period. This is an average of all valid hours within the 365 operating day period for Unit 2.
HI2 = total heat input over the 365 operating day period for Unit 2. V.A.1.b. Portland Cement Kilns and CENC and Clark Boilers: At all times after the compliance deadline specified in Regulation Number 23, Sections IV.A.3. or IV.B.3., the owner/operator of each BART or RP unit must maintain, calibrate, and operate a CEMS in full compliance with the requirements in 40 CFR Part 60, Section 60.13 and 40 CFR Part 60, Appendices A, B, and F to accurately measure SO2, NOX, and diluents, if diluent is required. The CEMS must be used to determine compliance with the SO2 and NOx regional haze emission limits for each such unit. For particular units, such limits are expressed in units of pounds per hour, tons per year, pounds per ton clinker, or pounds per million Btu. The owner/operator must calculate emissions in the applicable units. In determining compliance with the SO2 and NOx regional haze limits, all periods of emissions must be included, including startups, shutdowns, emergencies, and malfunctions. V.A.1.b.(i) Pounds per Hour and Tons per Year Regional Haze Limits and Pounds per Million Btu Regional Haze Limits.
For any hour in which fuel is combusted in the BART or RP unit, the owner/operator must calculate hourly NOx and SO2 emissions in the appropriate units (lbs/hr) or (lbs/MMbtu) in accordance with the provisions in 40 CFR Part 60. These hourly values must be used to determine compliance in accordance with the particular limits averaging time, as follows.
V.A.1.b.(i)(A) Pounds per Hour or Pounds per Million Btu Regional Haze Limits on a 30-day rolling average. Before the end of each operating day, the owner/operator must calculate and record the 30-day rolling average emission rate in lb/MMBtu or lb/hr from all valid hourly emission values from the CEMS for the previous 30 operating days.
V.A.1.b.(i)(B) Pounds per Hour on a 12-month rolling average. Before the end of each month, the owner/operator must calculate and record the 12-month rolling average emission rate in lb/hr from all valid hourly emission values from the CEMS for the previous 12 months.
V.A.1.b.(i)(C) Tons per year regional haze Limits on a 12-month rolling average. Before the end of each month, the owner/operator must calculate and record the total emissions in tons/yr from all valid hourly emission values from the CEMS for the previous 12 months.
V.A.1.b.(ii) 30-Day Rolling Average Pounds per Ton Clinker Regional Haze Limits. Hourly clinker production must be determined in accordance with the requirements in 40 CFR Part 60, Subpart F, Section 60.63(b). An operating day includes all valid data obtained in any daily 24-hour period during which the kiln operates and excludes any measurements made during the daily 24-hour period when the kiln was not operating. The 30- operating day rolling emission rate of NOx and SOx must be calculated and recorded as the total of all hourly emissions data for a cement kiln in the preceding 30 operating days, divided by the total tons of clinker produced in that kiln during the same 30-day operating period in accordance with the equation in 40 CFR Part 60, Subpart F, Section 60.64(c).
V.A.1.b.(iii) CENC Units 4 and 5 NOX Regional Haze limits For any hour in which fuel is combusted in CENC Unit 4 or Unit 5, the owner/operator must calculate hourly NOx emissions in the appropriate units (lbs/MMbtu) in accordance with the provisions in 40 CFR Part 60. These hourly values must be used to determine compliance with the Regional Haze limits, as follows.
V.A.1.b.(iii)(A) Individual unit pound per Million Btu on a 30-day rolling average regional haze limit: before the end of each operating day, the owner/operator must calculate and record the 30-day rolling average emission rate in lb/MMBtu from all valid hourly emission values from the CEMS for the previous 30 operating days, or V.A.1.b.(iii)(B) Combined units 4 and 5 lbs/MMbtu 30-day rolling average regional haze limit: before the end of each operating day, the owner/operator must calculate and record a 30-day rolling average using data from the previous 30 operating days in accordance with the following equation.
Average ER = [(ER4)(HI4)+(ER5)(HI5)] / [(HI4)+(HI5)] Where:
ER4 = average NOX emission rate, in pounds per MMbtu over the 30- day period. This is an average of all valid hours within the 30 operating day period for Unit 4.
ER5 = average NOX emission rate, in pounds per MMbtu over the 30- day period. This is an average of all valid hours within the 30 operating day period for Unit 5.
HI4 = Total heat input over the 30 operating day period for Unit 4. HI5 = Total heat input over the 30 operating day period for Unit 5. V.B.1.b.(iii)(C) The owner or operator must indicate in the excess emission reports required by Section V.E., which compliance demonstration method has been followed for the reporting period.
V.A.2. BART and RP Units without NOx and SO2 CEMS V.A.2.a. CENC Unit 3. Compliance with the SO2 limitations must be determined by sampling and analyzing each shipment of coal for the sulfur and heat content using the appropriate ASTM Methods. In lieu of sampling, vendor receipts may be used provided the sampling and analysis was conducted in accordance with the appropriate ASTM Method. Each sample or vendor receipt must indicate compliance with the SO2 limitation. Compliance with the annual NOx limits must be monitored by recording fuel consumption and calculating emissions monthly using the appropriate AP-42 emission factor. Monthly emissions must be calculated by the end of the subsequent month and must be used in a rolling twelve-month total to monitor compliance with the annual limitations. Each month a new twelve-month total must be calculated using the previous 12 months’ data. [*Note: CENC Unit 3 is not subject to annual SO2 limits.] V.A.2.b. CEMEX Dryer. Unless performance tests were completed within the previous 6 months, within 60 days of the compliance deadline specified in Regulation Number 23, Section IV.A.3., the owner/operator must conduct a stack test to measure NOx and SO2 emissions in accordance with the appropriate EPA test methods. Frequency of testing thereafter must be every five years. Each test must consist of three test runs, with each run at least 60 minutes in duration. In addition to the stack tests described above, compliance with the annual NOx and SO2 limits must be monitored by calculating emissions monthly using the emission factors (in lb/hr) determined from the most recent Division-approved stack test and hours of operation for the month. Monthly emissions must be calculated by the end of the subsequent month and used in a twelve-month rolling total to monitor compliance with the annual limitations. Each month a new twelve-month total must be calculated using the previous 12 months’ data.
V.B. Monitoring/Compliance Determination: Particulate Regional Haze Limits V.B.1. Particulate Regional Haze Limits for all boilers except CENC and Clark boilers Unless particulate compliance testing was completed within the previous 6 months, within 60 days of the compliance deadline specified in Regulation Number 23, Sections IV.A.3., IV.B.3., or IV.C.3., the owner/operator must conduct a stack test to measure particulate emissions in accordance with the requirements and procedures set forth in EPA Test Method 5 as set forth in 40 CFR Part 60, Appendix A. Stack testing for particulate matter must be performed annually, except that: (1) if any test results indicate emissions are less than or equal to 50% of the emission limit, another test is required within five years; (2) if any test results indicate emissions are more than 50%, but less than or equal to 75% of the emission limit, another test is required within three years; and (3) if any test results indicate emissions are greater than 75% of the emission limit, an annual test is required until the provisions of (1) or (2) are met. A test run must consist of three test runs, with each run at least 120 minutes in duration. Test results must be converted to the applicable units and compliance will the based on the average of the three test runs. In addition, to the stack tests described above, the owner/operator must monitor compliance with the particulate matter limits in accordance with the applicable compliance assurance monitoring plan developed and approved in accordance with 40 CFR Part 64. V.B.2. Portland Cement Plant Particulate Regional Haze Limits. V.B.2.a. Kilns. Compliance with the particulate matter limitations must be monitored using a PM CEMS that meets the requirements in 40 CFR Part 63, Subpart LLL. The owner or operator must calculate emissions in the applicable units. If a PM CEMS is used to monitor compliance with the PM limits, the opacity limits specified in this Regulation Number 23 do not apply.
V.C.2. Records of quality assurance and quality control activities for emissions measuring systems including, but not limited to, any records required by 40 CFR Parts 60, 63, or 75. V.C.3. Any other records required by 40 CFR Part 60, Subpart F, Sections 60.65 and 63, Subpart LLL, 64 or 75.
V.D. Reporting requirements The owner/operator of a BART, RP or BART alternative program unit must submit semi-annual excess emissions reports no later than the 30th day following the end of each semi-annual period unless more frequent reporting is required. Excess emissions means emissions that exceed the regional haze emissions limits. Excess emission reports must include the information specified in 40 CFR Part 60, Section 60.7(c).
The owner/operator of a BART, RP, or BART alternative program unit must submit reports of any required performance stack tests for particulate matter to the Division within 60 calendar days after completion of the test. The owner/operator must also submit semi-annual reports of any excursions under the approved compliance assurance monitoring plan in accordance with the schedule specified in the source’s Title V permit. The owners or operators of units in Sections IV.D. or IV.F. must submit APENs to the Division within 90 days of the applicable, or actual if sooner, closure date. PART B STATEMENTS OF BASIS, SPECIFIC STATUTORY AUTHORITY AND PURPOSE I.A. Adopted: November 20, 2020 Relocation of and revisions to Regulation Number 3, Part F into the new Regulation Number 23. This Statement of Basis, Specific Statutory Authority, and Purpose complies with the requirements of the State Administrative Procedure Act, § 24-4-103(4), C.R.S., the Colorado Air Pollution Prevention and Control Act, §§ 25-7-110 and 25-7-110.5., C.R.S., and the Air Quality Control Commission’s (“Commission”) Procedural Rules, 5 Code Colo. Reg. §1001-1. Basis In 1999, EPA promulgated the final Regional Haze Rule, which requires each state to submit a state implementation plan (SIP) to address regional haze (see 40 CFR Sections 51.300-51.309). Colorado submitted its regional haze SIP to EPA in 2008 and 2009. The Commission adopted revisions to the regional haze requirements in 2011, 2014, and 2016. The regional haze rule, Section 51.308(f), requires states to revise and submit its regional haze SIP to EPA by July 31, 2021 (i.e., second implementation period). States must continue to make progress toward their reasonable progress goals. In this rulemaking, the Commission moved the regional haze requirements from Regulation Number 3, Part F to a new Regulation Number 23, removed past provisions, and adopted closure dates for specific sources. Specific Statutory Authority The Colorado Air Pollution Prevention and Control Act, § 25-7-106, C.R.S. provides the Commission the maximum flexibility in establishing an air quality control program and authorizes the Commission to promulgate regulations as necessary or desirable to carry out that program. Section 25-7-105 directs the Commission to promulgate such rules and regulations as are consistent with the legislative declaration set forth in Section 25-7-102 and are necessary for the proper implementation and administration of Article 7, including a comprehensive state implementation plan which will prevent significant deterioration of air quality. Section 25-7-109 authorizes the Commission to adopt emission control regulations pertaining to air pollutants. Section 25-7-106(6) further authorizes the Commission to require owners and operators of any air pollution source to monitor, record, and report information. Purpose EPA’s regional haze rule requires states to reduce emissions of visibility impairing pollutants that negatively impact class I areas. The Commission has previously approved revisions to Regulation Number 3 that included emission reduction requirements for sources subject to Best Available Retrofit Technology (BART) and Reasonable Progress (RP) requirements during the first planning period of the regional haze program. Moving the revisions from Regulations Number 3 to Regulation Number 23 is intended to improve the readability of both Regulation Number 3 and the regional haze requirements. The Commission moved the provisions discussing applicability of the regional haze provisions, relevant definitions, the BART and RP determinations from the first 10-year planning period, and the monitoring and recordkeeping requirements to Regulation Number 23. Regulation Number 23 will also contain new emissions reductions requirements to meet or exceed the RP goals for the second 10-year planning period. The existing emission limits and new requirements placed on identified sources will eliminate significant emissions of nitrogen oxides (NOx), sulfur dioxide (SO2), and particulate matter (PM10) to improve visibility in Colorado’s twelve class I areas. These emission reductions, even accounting for emissions reserved for netting or offset purposes provide for reasonable progress toward national visibility goals, and therefore, meet the Clean Air Act requirements for the second 10-year Regional Haze planning period. For units using emission reservations for offsets, an application for Emission Reduction Credits (ERC) should be submitted to the division approximately 60 days prior to unit closure. Specifically, the Commission adopted closure dates for the following units: Cherokee Unit 4; ColoWyo Coal Mine; Comanche Units 1 and 2; Craig Units 2 and 3; Martin Drake Units 6 and 7; Nixon Unit 1; and Rawhide Unit 1. The Commission revised the requirements for Craig Unit 1 to remove the alternative compliance option to convert to natural gas. Craig Unit 1 will now only close on or before December 31, 2025. The Commission also updated the provisions for Valmont Station to include the date Valmont closed. Lastly, the Commission updated the provisions for Nucla Station to include the date Nucla Station closed, which was before the specified date, and remove requirements that were no longer necessary as they would have applied after the actual closure date. The Commission uses the terms “closure” and “retirement” of the electric units to mean that the burning of coal for electric generation and the resulting air emissions would cease by the closure dates. It is understood that the decommissioning period following cessation of electric generation is a multi-year process involving significant dedication of resource. These closures achieve reductions and co-benefits beyond RP recommendations that do not consider closure options.
The closure of these units will result in significant reductions of NOx, SO2, PM10, and GHG emissions. In addition to meeting the requirements for these units for the second 10-year Regional Haze planning period, closure of these units will have important co-benefits that will contribute to Colorado achieving other important air quality goals. Specifically, the emission reduction requirements from these unit closures will help achieve Colorado’s GHG emission reduction goals set forth in HB19-1261, reduce ground level ozone, reduce nitrogen deposition in Rocky Mountain National Park, and reduce GHG emissions pursuant to the requirements of the federal Affordable Clean Energy (ACE) rule. The Commission recognizes concerns regarding grid reliability and demand needs are substantiated. Utilities have noted publicly in Electric Resource Plans (ERPs) and Electric Integrated Resource Plans (EIRPs) filed with the PUC as required by 4 CCR 723-3 Rules 3600 and 3605 that these issues are key to the closure date announcements. The Commission considered an alternative proposal to advance the closure dates for the Nixon, Rawhide, and Craig 3 power plants to the end of 2028. While this proposal was not ultimately adopted, the Commission encourages the utilities and the PUC to further advance closure dates for these facilities in order to secure cost effective emissions reductions that are needed to address Colorado's GHG and Regional Haze goals.
The Commission did not move into Regulation Number 23 but deleted Regulation Number 3, Part F, Sections III. and IV. As discussed in the March 16, 2006, Regulation Number 3 Statement of Basis and Purpose, EPA’s regional haze regulations require states to define BART-eligible facilities and require sources subject to BART to complete a BART analysis. Regulation Number 3, Part F, Sections III. and IV. identified which sources were required to perform a BART analysis and specified the elements of the BART analysis. The federal rules also require states to submit a SIP identifying the BART-eligible sources and either the BART controls or the BART alternative. The Commission adopted BART controls and/or BART alternatives for the BART-eligible sources in December 19, 2008, January 7, 2011, November 20, 2014, and December 15, 2016. EPA last approved Colorado’s Regional Haze SIP on July 5, 2018 (83 Fed. Reg. 31332). Therefore, the provisions identifying which sources must perform a BART analysis and specifying the elements of a BART analysis are no longer necessary. The Commission also did not move but deleted Regulation Number 3, Part F, Sections VI.A.4. and VI.B.4. These provisions required sources to submit and the Division to publish compliance schedules for the sources in the above BART and RP determinations tables. As these requirements have passed, and were complied with, they are no longer necessary. Removing these provisions will improve and facilitate the readability and better allow the regulated community and other interested persons to identify and understand the provisions governing their activities.
The revisions also correct typographical, grammatical, and formatting errors found in the regional haze provisions.
Incorporation by Reference Section 24-4-103(12.5) of the State Administrative Procedure Act allows the Commission to incorporate by reference federal regulations. The criteria of Section 24-4-103(12.5) are met by including specific information and making the regulations available because repeating the full text of each of the federal regulations incorporated would be unduly cumbersome and inexpedient. To fully comply with these criteria, the Commission includes reference dates to rules and reference methods incorporated in Regulation Number 23.
The Commission also notes that other Air Quality Control Commission regulations reference the regional haze provisions, either as regional haze or Regulation Number 3 Part F. Specifically, regional haze requirements are referenced in Regulation Number 6, Part A, Section VIII.C.3.f.ii. and the SBAP Section XXV; Regulation Number 7, Part E, Sections I.D.3.a., II.A.2.f., and III.B.4.n and the SBAP Sections L., O., Q., R., and S., and Regulation Number 9, SBAP Section N. The Commission will update regulatory references as needed as opportunities arrive.
Additional Considerations These revisions do not exceed or differ from the federal act due to state flexibility in determining what strategies to implement to reduce impacts to visibility under the Regional Haze rule. However, where the proposal may differ from federal rules under the federal act, in accordance with Section 25-7-110.5(5)(b), C.R.S., the Commission determines:
(I) EPA’s regional haze requirements are performance based. The regional haze rule sets forth factors that the states must consider when determining Reasonable Progress (RP) for sources reasonably anticipated to cause or contribute to the impairment of visibility in federal Class I areas. States have the discretion to select the appropriate controls for such sources.
(II) EPA’s regional haze rule guides how states must determine RP for their RP-eligible sources. However, state discretion is a cornerstone of the regional haze rule (70 FR 39137). Colorado considered Colorado’s issues of concern when developing these revisions.
(III) EPA’s regional haze rule was not determined taking into account concerns unique to Colorado. The adopted revisions will improve Colorado’s ability to comply with the goals of the regional haze rule while preventing or reducing the need for costly retrofits potentially required in Colorado’s next reasonable progress planning period.
(IV) Concerning this revision, the Division must submit a SIP revision to EPA no later than July 31, 2021. The proposed shut-downs will reduce the need for costly retrofit to meet more stringent requirements later.
(V) EPA has established a SIP submittal due date of July 31, 2021. There is no timing issue that might justify changing the time frame for implementation of federal requirements.
(VI) The adopted rule will assist in establishing and maintaining a reasonable margin for accommodation of uncertainty and future growth.
(VII) The adopted rule establishes reasonable equity for sources because the Regional Haze Rule applies the same standards for determining RP to all RP-eligible sources. RP determinations are source specific and different controls and emission limits are to be expected.
(VIII) If the revisions were not adopted and EPA does not approve Colorado’s SIP, EPA may promulgate a Federal Implementation Plan; thus potentially determining requirements for Colorado’s sources. This outcome could subject others to increased costs.
(IX) These revisions do not modify the currently approved procedural, reporting, or monitoring requirements in Colorado’s Regional Haze SIP.
(X) Demonstrated technology is available to comply with the revisions.
(XI) The revisions will contribute to further reductions of NOx emissions and therefore contribute to the prevention of pollution.
(XII) A no action alternative would not address the required standard as these revisions; however, alternative rules could achieve the emission reductions to be achieved through these revisions, including setting specific RP control requirements instead of closure or specifying different closure dates.
As part of adopting the revisions to Regulation Number 3, Part F, the Commission has taken into consideration each of the factors set forth in C.R.S. § 25-7-109(1)(b). To the extent that C.R.S. § 25-7-110.8 requirements apply to this rulemaking, and after considering all the information in the record, the Commission hereby makes the determination that:
(I) These rules are based upon reasonably available, validated, reviewed, and sound scientific methodologies, and the Commission has considered all information submitted by interested parties.
(II) Evidence in the record supports the finding that the rules shall result in a demonstrable reduction of NOx emissions.
(III) Evidence in the record supports the finding that the rules shall bring about reductions in risks to human health and the environment that justify the costs to implement and comply with the rules.
(IV) The rules are the most cost-effective to achieve the necessary reduction in air pollution and provide the regulated entity flexibility.
(V) The selected regulatory alternative will maximize the air quality benefits of regulation in the most cost-effective manner.
_________________________________________________________________________ Editor’s Notes History New rule eff. 02/14/2021.