1 CCR 101-9
ARTICLE 101 GENERAL PROVISIONS PART 1 PURPOSES, CONSTRUCTION AND APPLICATION R-24-101-101 Short Title (See Statute)
R-24-101-102 Purposes - Rules of Construction (See Statute)
R-24-101-102-01 General These rules implement the provisions of the Colorado Procurement Code (§24-101-101 et seq. CRS) and the Construction Bidding for Public Projects Act (§24-92-101 et seq.). R-24-101-102-02 Expenditure of Funds.
These rules shall apply to every expenditure of public funds by the executive branch of this state, including federal assistance money, under any contract except supplies, services or construction as defined in Rule R-24-101-105-01.
R-24-101-103 Supplemental General Principles of Law Applicable. (See Statute)
R-24-101-104 Requirement of Good Faith.
(See Statute)
R-24-101-105 Application of This Code.
(See Statute)
R-24-101-105-01 Applicability.
The Colorado Procurement Code and these rules do not apply to the following procurements:
R-24-101-201-03 Supporting Information The person responsible for the execution of a written determination may require other state personnel, including technical personnel and appropriate personnel in the using agency, to furnish, in an accurate and adequate fashion, any information pertinent to the determination. R-24-101-201-04 Retention Each written determination shall be filed in the solicitation or contract file to which it applies, and shall be retained as part of such file for so long as the file is required to be maintained, as provided in Section ;24- 80-101 through 24-80-112.
PART 3 DEFINITIONS R-24-101-301 Terms Defined in Colorado Procurement Code (a) As used throughout these rules, words and terms defined in the Colorado Procurement Code shall have the same meaning as in the Code.
(b) “Commodity” as used in these Rules shall have the same meaning as “product”.
(c) “Product” means anything that is produced or manufactured and that may be obtained, or needs to be obtained, by the State, either in and of itself, or in conjunction with services. As used in these Rules, “Product,” “Supplies,” and “Commodity” shall have essentially the same meaning. PART 4 PROCUREMENT RECORDS AND INFORMATION (See Statute)
ARTICLE 102 PROCUREMENT ORGANIZATION PART 1 EXECUTIVE DIRECTOR. DEPARTMENT OF ADMINISTRATION (See Statute)
PART 2 DIVISION OF PURCHASING R-24-102-201 Creation of the Division of Purchasing (See Statute)
R-24-102-201 State Purchasing Director The State Purchasing Director referred to in these rules shall be appointed by the Executive Director of the Department of Personnel and shall have these powers and duties through delegation from the Executive Director. Any powers and duties not so delegated remain with the Executive Director. R-24-102-201 State Purchasing Director (See Statute)
R-24-102-202-01 Mandatory and Permissive Price Agreements (a) The State Purchasing Director may issue mandatory or permissive price agreements for supplies or services for use by all state agencies and institutions.
(b) Mandatory price agreements shall be used by all agencies and institutions if and when the supplies or services are needed. Any agency or institution desiring to purchase supplies or services of a similar nature other than those on a mandatory price agreement must request and receive written authorization to do so by the Division of Purchasing.
(c) Permissive price agreements may be used by all agencies and institutions if and when the supplies or services are needed. If supplies or services contained on permissive price agreements are not used by agencies or institutions, the needs must be submitted for competition as provided by these rules.
R-24-102-202.5-01 Bid Information and Distribution System (BIDS). Definitions
(a) BIDS shall be the only notification method required for competitive solicitations for goods and services made through Invitations for Bids (IFB), Requests for Proposals (RFP), and Documented Quotes (DQ).
(b) Except as provided in paragraph (c) below, bids, proposals, and quotes shall not be deemed responsive unless the responding vendor is registered for BIDS.
(c) When the director or head of a purchasing agency or delegate believes that BIDS is not likely to yield adequate competition, the following procedure can be used if the following paragraph appears in the solicitation document: “Because of the limited competition expected from registered BIDS vendors on this solicitation, the procuring agency intends to use both BIDS and additional methods of vendor notification and may make the specifications available to non-registered vendors through additional means. However, quotes, bids or offers submitted by non-registered vendors will not be opened or considered (except as necessary to determine BIDS registration status) unless, after examination of quotes/bids/offers submitted by BIDS registered vendors, it is determined that there is not adequate competition among BIDS registered vendors. If adequate competition exists among registered vendors, quotes, bids, or proposals from non- registered vendors will not be considered. A vendor is considered registered if its registration and payment is received in the State Purchasing Office prior to the bid opening time or the due date for receipt of quotes.”
R-24-102-202.5-03 BIDS Fees (a) The BIDS fee structure shall be set by the State Purchasing Director.
(b) Every vendor wishing to be listed on the BIDS vendor database shall pay an annual registration fee. Where a corporation has subsidiaries, each subsidiary requesting a listing in BIDS shall be deemed to be a separate entity and shall pay a separate fee.
(c) Additional fees may be set by the State Purchasing Director. R-24-102-202.5-04 Use of BIDS - Notice of Construction Projects and Professional Services For all construction projects and for all professional service procurements (as defined in §24-30-1402(6) CRS) for which competitive notification or solicitation procedures are required, a notification must be placed on BIDS, and the award must be posted on BIDS.
(a) Detailed specifications shall not be included in the notice, and all information must be open to public view, without password protection.
(b) Contractors/bidders need not be registered for BIDS in order to be deemed responsive.
(c) This requirement is in addition to, and does not supersede, any advertisement, notification, or solicitation procedures required by statute or rule.
R-24-102-204 Delegation of Authority by State Purchasing Director (See Statute)
R-24-102-204-01 Purchasing Delegation Limits.
Purchasing delegations will have limits as described in Rule R-24-103-204 and all associated subparagraphs. An agency that receives limited purchasing authority shall be referred to as a “Group I Agency”, and an agency that receives an unrestricted purchasing delegation shall be referred to as a “Group II Agency”.
R-24-102-204-02 Delegation Criteria.
Recognizing the importance of local control to meet local needs, delegation of purchasing authority is encouraged where efficient.
(a) Minimum criteria to receive a Group I purchasing delegation shall include:
(b) Minimum criteria to receive a Group II purchasing delegation shall include:
PART 3 ORGANIZATION OF PUBLIC PROCUREMENT (See Statute)
PART 4 STATE PROCUREMENT RULES (See Statute)
PART 5 COORDINATION (See Statute)
ARTICLE 103 SOURCE SELECTION AND CONTRACT FORMATION PART 1 DEFINITIONS (See Statute)
R-24-103-101-01 Terms Defined in This Chapter.
As used in this chapter, unless the context otherwise requires:
(See Statute for balance of definitions)
PART 2 METHODS OF SOURCE SELECTION R-24-103-201 Methods of Source Selection.
(See Statute)
R-24-103-202a Competitive Sealed Bidding (other than construction) R-24-103-202a-01 Invitation for Bids (a) Bidding Policy. It shall be the policy of the State of Colorado to purchase products, commodities, services, and construction in a manner that affords businesses a fair and equal opportunity to compete.
(b) Specifications. Purchasing agencies shall issue product, supply, service, or construction specifications which are not unduly restrictive. Brand name specifications, brand name or equal specifications, or qualified products lists shall only be used in accordance with the provisions of Rules R-24-104-202, -01, -02.
Purchasing agencies may utilize life cycle costing and/or value analysis in determining the lowest responsible bidder. In bids where life cycle costing or value analysis is to be used, the specifications shall indicate the procedure and valuative factors to be considered. When appropriate, specifications 'issued and/or used by the federal government, other public procurement units or professional organizations may be referenced by the State of Colorado. Bidders may be required to certify that these standardized specifications have been met.
(c) Solicitation Time. Except as provided under emergency procedures, the minimum time for the bid opening date shall be not less than 14 calendar days after posting the solicitation on BIDS. When special requirements or conditions exist, the head of a purchasing agency may lengthen or shorten the bid time, but in no case shall the time cycle be shortened to reduce competition. Solicitation periods of less than 14 calendar days shall be documented by the head of the purchasing agency as to why a reduced bid period was required. R-24-103-202a-02 Pre-Bid Conferences.
Pre-bid conferences may be conducted to explain the procurement requirements. They shall be announced to all prospective bidders known to have received an Invitation for Bid. The conference should be held long enough after the Invitation for Bid has been issued, to allow bidders to become familiar with it, but with adequate time before bid opening to allow bidders consideration of the conference results in preparing their bids. Nothing stated at the pre-bid conference shall change the Invitation for Bids unless a change is made by written amendment, posted on BIDS.
R-24-103-202a-03 Amendments to Invitations for Bids Amendments to Invitations for Bids shall be identified as such and may require that the bidder acknowledge receipt of all amendments issued. The amendment shall reference the portions of the Invitation for Bids it amends. Amendments shall be posted on BIDS with sufficient time to allow prospective bidders to consider them in preparing their bids. If the time set for bid opening will not permit such preparation prior to bid opening, such time shall be increased in the amendment. R-24-103-202a-04 Withdrawal of Bids (a) Withdrawal of Bids Prior to Bid Opening. Any bid may be withdrawn from the appropriate purchasing agency prior to the specified bid opening date and time.
(b) Withdrawal of Bids after Bid Opening but Prior to Award. The Director or head of a purchasing agency may allow a bid to be withdrawn after bid opening but prior to award provided:
(c) Procedure. Bids may be withdrawn by written notice received in the office designated in the Invitation for Bids prior to the time set for bid opening. A telegraphic withdrawal received by telephone from the telegraph company, prior to bid opening, will be effective if the telegraph company confirms the message by sending a copy of the telegram showing that the message was received at such office prior to bid opening.
R-24-103-202a-05 Telephone Bids.
Telephone bids from vendors will not be accepted, except as allowed in. Rule R-24-103-204-03 and unless the Director or head of a purchasing agency makes a written determination that market conditions are of such nature that it is in the best interest of the State to solicit telephone bids. Comment: An example of when the Director or head of a purchasing agency may approve telephone bids is in the procurement of petroleum fuels where the market price may change on a daily basis.
R-24-103-202a-06 Electronic Bids.
Bids may be submitted electronically when: The terms of the solicitation expressly permit electronic submission and the requirements of one of the following statutes or rules are met: R-24-103-101-01(h), §24-103-204 CRS, or §24-103-206 CRS.
R-24-103-202a-07 Timeliness of Bids.
Bids received after the bid opening time shall not be opened, but shall be rejected as a late bid. The following exceptions are permitted by the director or head of a purchasing agency:
R-24-103-202a-08 Bid Receipt, Opening, and Recording (a) Receipt. Upon receipt, each bid and modification shall be time- stamped by machine or by hand and shall be stored in a secure place until bid opening time. Bids and modifications shall not be opened upon receipt, except that unidentified bids and modifications may be opened for identification purposes. The purchasing employee will immediately reseal the bid or modification and attest in writing that the employee has not revealed the contents of the envelope.
(b) Opening and Recording. All bid openings shall be open to the public and/or interested parties. Bids and modifications shall be opened, in the presence of one or more witnesses, as soon as possible after the time, and at the place, designated in the Invitation for Bids. The name of each bidder, the bid price(s) (unless otherwise provided in the Invitation for Bids), and other information deemed appropriate by the Procurement Officer shall be read aloud at the time of bid opening. Reading of all bid item prices may not be reasonable or desired (e.g., in the case of lengthy or complex bids). The decision not to read all bid prices shall be made by the Procurement Officer and shall be stated in the Invitation for Bids.
(c) Confidential Data. The Procurement Officer shall determine the validity of any written requests for nondisclosure of trade secrets and other proprietary data. If the parties do not agree as to the disclosure of data, the Procurement Officer shall inform the bidder(s) in writing what portions of the bids will be disclosed, and that unless the bidder protests under Article 109, Part 1, of the Colorado Procurement Code, the bids will be so disclosed, After award, the bids shall be open to public inspection subject to any continued prohibition on the disclosure of confidential data.
R-24-103-202a-09 Mistakes in Bids (a) Confirmation of Bid. When it appears from a review of the bid that a mistake has been made, the bidder should be requested to confirm the bid. Situations in which confirmation should be requested include obvious, apparent errors on the face of the bid or a bid unreasonably lower than the other bids submitted. If the bidder alleges mistake, the bid may be withdrawn if the conditions set forth in this section are met, provided that no correction or withdrawal of bids shall be allowed after award.
(b) Minor Informalities. Minor informalities are matters of form rather than substance evident from the bid document, or insignificant mistakes that can be waived or corrected without prejudice to other bidders; that is, the effect on price, quantity, quality, delivery, or contractual conditions is negligible. The Procurement Officer may waive such informalities or allow the bidder to correct them depending on which is in the best interest of the state. Examples include the failure of a bidder to:
All products and services shall be evaluated against the specifications and/or brand names used as a reference and other evaluation .criteria in the Invitation for Bid. For example, the following factors may be considered in evaluating any bid response: delivery date after receipt of order; cash discounts; warranties (type and length); future availability; results of product testing; local service; cost of maintenance agreements; future trade-in value or availability of repurchase agreement; availability of training courses; financial terms if not a cash purchase; space limitations; esthetics; adaptability to environment; cost of operation (if any); safety and health features relating to codes, regulations, or policies, (a) Product Acceptability. The Invitation for Bids may require the submission of bid samples, descriptive literature, technical data, or other material necessary to determine product acceptability, If bid responses are received that do not contain the required submission data, they may be rejected as nonresponsive. The Invitation for Bids may also provide for accomplishing any of the following prior to award:
(b) Determination of Lowest Bidder. Following determination of product acceptability, bids shall be evaluated to determine which bidder offers the lowest cost to the State in accordance with specifications. They may be evaluated in accordance with value analysis or life cycle cost formulas. If such formulas are to be used, they shall be objectively measurable and shall be set forth in the Invitation for Bids. Such evaluation factors need not be precise predictors of actual future costs, but to the extent possible they shall:
(c) Restrictions. A contract may not be awarded to a bidder submitting a higher quality item than that designated in the Invitation for Bids unless such bidder is also the lowest bidder as determined by value analysis or life cycle cost formulas as permitted in this section. R-24-103-202a-11 Disposition of Bid Surely.
If a bid is withdrawn in accordance with this section, any bid surety shall be returned to the bidder in a timely manner.
R-24-103-202a-12 Multi-Step Sealed Bidding.
(a) Definition. Multi-step sealed bidding is a two-phase process consisting of a technical first phase composed of one or more steps in which bidders submit un-priced technical offers to be evaluated by the State. The second phase will consider only those bidders whose technical offers were determined to be acceptable during the first phase and, therefore, their price bids will be opened and considered. It is designed to obtain the benefits of competitive sealed bidding by award of a contract to the lowest responsive, responsible bidder, and at the same time obtain the benefits of the competitive sealed proposals procedure through the solicitation of technical offers and the conduct of discussions to evaluate and determine the acceptability of technical offers.
(b) Conditions for Use. The multi-step sealed bidding method may be used when it is not practical to prepare, initially, a definitive purchase description which would be suitable to permit an award based on price.
R-24-103-202a-13 Records.
All documents relating to the modification or withdrawal of bids shall be made a part of the appropriate procurement file.
R-24-103-202b Competitive Sealed Bidding - Construction R-24-103-202b-01 General Provisions.
(a) Extension of Time for Bid or Proposal Acceptance. After opening bids, the Procurement Officer may request low bidders to extend the time during which the State may accept their bids, provided that no other change is permitted. The reasons for requesting such extension shall be documented.
(b) One Bid Received. If only one responsive bid is received in response to an Invitation for Bid (including multi-step bidding), an award may be made to the single bidder if the Procurement Officer finds that the price submitted is fair and reasonable and that either other prospective bidders had reasonable opportunity to respond, or there is not adequate time for re-solicitation. Otherwise the bid may be rejected pursuant to the provisions of Rule R-24-103-301, (Cancellation of Solicitations; Rejection of Bids or Proposals) and
(c) Multiple or Alternate Bids. The solicitation shall prohibit multiple or alternate bids unless such bids are specifically provided. When prohibited the multiple or alternate bids shall be rejected although a clearly indicated base bid will be considered for award as though it were the only bid or offer submitted by the bidder, The provisions of this Section shall be set forth in the solicitation, and if multiple or alternate bids are allowed, it shall specify their treatment.
(d) Combining Bids or Offers Not Acceptable. Any bid or offer which is conditioned upon receiving award of both the particular contract being solicited and another State contract shall be deemed nonresponsive and not acceptable.
(e) Affiliates are prohibited from submitting bids for the same contract. Affiliates are defined as any individuals, partnerships, corporations, joint ventures, companies, firms, contractors or other legal entities, if directly or indirectly, either (i) one controls or can control the other, or (ii) a third controls or can control both.
(f) Purchase of Items Separately from Construction Contract. The Director or head of a purchasing agency is authorized to determine whether a supply item or group of supply items shall be included as a part of, or procured separately from, any contract for construction.
(g) Standard Forms. All construction bidding and contracting procedures shall utilize standard State of Colorado forms which are listed below or their revisions and are available from Central Stores, Division of Central Services, Department of Personnel:
(a) Content. The Invitation for Bids shall include the following:
(b) Incorporation by Reference. The Invitation for Bids may incorporate documents by reference provided that the Invitation for Bids specifies where such documents can be obtained.
(c) Acknowledgment of Addenda. The Invitation for Bids shall require the acknowledgment of the receipt of all addenda issued.
(d) Bidding Time. Bidding time is the period of time between the date of the Advertisement for Bids and the date set for opening of bids. In each case bidding time will be set up to provide bidders a reasonable time to prepare their bids, but in no event shall this time be less than fourteen days as provided in Section 24-103-202(3).
R-24-103-202b-03 Bidder Submissions.
(a) Bid Form. The Invitation for Bids shall provide a form which shall include space in which the bid price shall be inserted and which the bidder shall sign and submit along with all other necessary submissions.
(b) Telegraphic Bids. Telegraphic Bids and mailgrams will not be accepted or considered, but will be rejected.
R-24-103-202b-04 Public Notice.
(a) Distribution. Notice of the Invitation for Bids will be advertised according to the provisions of Section 24-70-101 through 107 and these Rules.
(b) Pre-Bid Conferences. Pre-bid conferences may be conducted to explain the procurement requirements. They shall be announced to all prospective bidders known to have received an Invitation for Bids. The conference should be held long enough after the Invitation for Bids has been issued to allow bidders to become familiar with it, but sufficiently before bid opening to allow consideration of the conference results in preparing their bids. Nothing stated at the pre-bid conference shall change the Invitation for Bids unless a change is made by written addendum as provided in Rule R-24-103-202b-05 (Addenda to Invitations for Bids) and the Invitation for Bids and the notice of the pre-bid conference shall so provide. R-24-103-202b-05 Addenda to Invitation for Bids.
(a) Form. Addenda to Invitations for Bids shall be identified as such and shall require that the bidder acknowledge receipt of all amendments issued. The addenda shall reference the portions of the Invitation for Bids it amends.
(b) Distribution. Addenda shall be sent to all prospective bidders known to have received an Invitation for Bids.
(c) Timeliness. Addenda shall be distributed within a reasonable time to allow prospective bidders to consider them in preparing their bids.
R-24-103-202b-06 Pre-Opening Modification or Withdrawal of Bids.
(a) Procedure. Bids may be modified or withdrawn by written notice received in the office designated in the Invitation for Bids prior to the time set for bid opening.
(b) Disposition of Bid Security. Bid security, if any, shall be returned to the bidder when withdrawal of the bid is permitted.
(c) Records. All documents relating to the modification or withdrawal of bids shall be made a part of the appropriate procurement file.
R-24-103-202b-07 Timeliness of Bids Bids received after the bid opening time shall not be opened, but shall be rejected as a late bid. The following exceptions are permitted by the director or head of a purchasing agency:
(a) If prior to a specified opening time and date, the mail, either directly by the post office or by internal distribution system, has not been delivered, any bid received by the next same-day delivery may be accepted if it is reasonable to believe the bid response was in the delivery process which was not completed prior to the opening time and date. All invitations for bids utilizing this exception must so state in the terms and conditions of the invitation for bids.
(b) In the event of a labor unrest (strike, work slow down, etc.) which may affect mail delivery, the director is authorized to develop and issue emergency procedures.
(c) In any other situation that is beyond the control of the state or the vendor, the director or the head of a purchasing agency shall rule on the acceptability of the bid. However, under no circumstances shall a late bid be accepted if the bid was still within the control of the vendor at the time the bid opening actually occurred.
In those situations where the late bid was not in the control of the vendor at the time of the bid opening, the director or head of a purchasing agency shall not accept the late bid unless he/she further finds that extraordinary circumstances exist. The responsibility for ensuring that the bid is received on time rests with the vendor, and the reasonably foreseeable problems inherent in the delivery of bids (e.g. slow messengers, slow mail service, weather, bad directions, mechanical failures, traffic, etc.) are not extraordinary circumstances permitting acceptance of late bids. R-24-103-202b-08 Receipt, Opening, and Recording of Bids.
(a) Receipt. Upon receipt, all bids and modifications will be date and time-stamped but not opened.
(b) Opening and Recording. Bids and modifications shall be opened publicly, in the presence of one or more witnesses, at the time and place designated in the Invitation for Bids. The names of the bidders, the bid price, attendees received, alternatives, bid security, time of completion, and such other information as is deemed appropriate by the Procurement Officer, shall be read aloud or otherwise made available. Such information also shall be recorded at the time of bid. opening; that is, the bids shall be tabulated or a bid abstract made. The names and addresses of required witnesses shall also be recorded at the opening. The opened bids shall be recorded at the opening. The opened bids shall be available for public inspection except to the extent the bidder designates trade secrets or other proprietary data to be confidential as set forth in Subsection R- 24-103-202b-08(c) of this Section. Material so designated shall accompany the bid and shall be readily separable from the bid in order to facilitate public inspection of the nonconfidential portion of the bid.
(c) Confidential Data. The Procurement Officer shall examine the bids to determine the validity of any requests for nondisclosure of trade secrets and other proprietary data identified in writing. Such requests shall be submitted by the bidder prior to the bid opening under separate cover. If the parties do not agree as to the disclosure of data, the Procurement Officer shall inform the bidders in writing what portions of the bids will be disclosed and that, unless the bidder protests under Article 109 (Remedies) of the State Procurement Code, the bids will be so disclosed. The bids shall be open to public inspection subject to any continuing prohibition on the disclosure of confidential data.
R-24-103-202b-09 Mistakes in Bids.
(a) General. Correction or withdrawal of a bid because of an inadvertent, non-judgmental mistake in the bid requires careful consideration to protect the integrity of the competitive bidding system, and to assure fairness. If the mistake is attributable to an error in judgment, the bid may not be corrected. Bid correction or withdrawal by reason of a non-judgmental mistake is permissible but only to the extent it is not contrary to the interest of the State or the fair treatment of other bidders.
(b) Mistakes Discovered Before Opening. A bidder may correct mistakes discovered before bid opening by withdrawing or correcting the bid as provided in Rule R-24-103-202b-06 (Pre- Opening Modification or Withdrawal of Bids).
(c) Confirmation of Bid. When it appears from a review of the bid that a mistake has been made, the bidder should be requested to confirm the bid. Situations in which confirmation should be requested include obvious, apparent errors on the face of the bid or a bid reasonably lower than the other bids submitted. If the bidder alleges mistake, the bid may be corrected or withdrawn if the conditions set forth in Sub-section R-24-103-202b-09 (d) (i) through R-24-103-202b-09 (d) (iii) of this Section are met.
(d) Mistakes Discovered After Opening But Before Award. This Sub-section sets forth procedures to be applied in three situations described in Sub-section R-24-103-202b-09(d)(i) through R-24-103- 202b-09(d)(iii) below in which mistakes in bids are discovered after opening but before award.
(e) Mistakes Discovered After Award. Mistakes shall not be corrected after award of the contract except where the Director or the head of a purchasing agency makes a written determination that it would be unconscionable not to allow the mistake to be corrected or the bid withdrawn.
(f) Determination Required. When a bid is corrected or withdrawn, or correction or withdrawal is denied under Sub-sections R-24-103-202b-09(d) or R-24-103-202b-09(e) of this Section, the Director or the head of a purchasing agency shall prepare a written determination showing that the relief was granted or denied in accordance with these regulations, except that the Procurement Officer shall prepare the determination required under Sub-section R-24-103-202b-09(i) of this Section. R-24-103-202b-10 Bid Evaluation and Award (a) General. The contract is to be awarded “to the lowest responsible and responsive bidder whose bid meets the requirements and criteria set forth in the Invitation for Bids.” See Sections 24-103-202
(b) Product Acceptability. The Invitation for Bids shall set forth the evaluation criteria to be used in determining product acceptability. It may require the submission of bid samples, descriptive literature, technical data, or other material. It may also provide for:
The acceptability evaluation is not conducted for the purpose of determining whether one bidder's item is superior to another, but only to determine that a bidder's offering is acceptable as set forth in the Invitation for Bids. Any bidder's offering which does not meet the acceptability requirements shall be rejected.
(c) Determination of Lowest Bidder. Following determination of product acceptability, if any is required, bids will be evaluated to determine which bidder offers “the lowest cost to the State in accordance with the evaluation criteria set forth in the Invitation for Bids. Only objectively measurable criteria which are set forth in the Invitation for Bids shall be applied in determining the lowest bidder. Examples of such criteria include, but are not limited to, transportation cost, and ownership or life- cycle cost formulae. Evaluation factors need not be precise predictors of actual future cost, but to the extent possible such evaluation factors shall:
(d) Restrictions. A contract may not be awarded to a bidder submitting a higher quality item than that designated in the Invitation for Bids, unless such bidder is also the lowest bidder as determined by value analysis or life-cycle cost formulas as permitted in this Section.
(e) Low Tie Bids. Tie bids are low responsive bids from responsible bidders that are identical in price and which meet all the requirements and criteria set forth in the Invitation for Bids. In the discretion of the Director or the head of a purchasing agency, award shall be made in any permissible manner that will discourage tie bids. The office of the Attorney General shall be notified of any tie bids in an amount greater than $1,000.
R-24-103-202b-11 Multi-Step Sealed Bidding.
(a) Definition. Multi-step sealed bidding is a two-phase process consisting of a technical first phase composed of one or more steps in which bidders submit un-priced technical offers to be evaluated by the State, and a second phase in which those bidders whose technical offers are determined to be acceptable during the first phase have their price bids considered. It is designed to obtain the benefits of competitive sealed bidding by award of a contract to the lowest responsive, responsible bidder, and at the same time obtain the benefits of the competitive sealed proposals procedure through the solicitation of technical offers and the conduct of discussions to evaluate and determine the acceptability of technical offers.
(b) Conditions for Use. The multi-step sealed bidding method will be used when it is not practical to prepare initially a definitive purchase description which will be suitable to permit an award based on price.
(c) Procedure for Phase One of Multi-Step Sealed Bidding.
(d) Procedure for Phase Two.
R-24-103-202.3 BEST VALUE BIDDING.
R-24-103-202.3-01 Definitions.
(a) Base bid means the minimum functional requirements set forth in the bid, as issued by the state.
(b) Enhancements means components, services, or products that exceed the minimum functional requirements and would improve the quality of the goods or services being procured by the state.
(c) Options means choices of additional components, services, or products that would serve to provide increased value to the state beyond the base bid.
(d) Alternatives means a choice of a different commodity or service that meets or exceeds the functional requirements of the base bid.
(e) Best value means the lowest overall cost to the state after taking into consideration costs, benefits, and savings.
R-24-103-202.3-02 Written Determination.
When best value bidding selection process is to be used, the State Purchasing Director or head of a purchasing agency shall make a written determination that the use of best value bidding is appropriate for the commodity or service being solicited.
R-24-103-202.3-03 Award When the best value bidding process is used, award shall be made to the responsible offeror whose bid results in the best value to the state, The bid, as awarded, must meet the minimum functional requirements in the base bid.
R-24-103-202.3-04 Evaluation.
Bids shall be evaluated against the minimum functional requirements in the base bid. All bids meeting these specifications shall be determined to be responsive. When a written determination has been made that best value bidding is appropriate for the commodity or service being solicited, the invitation for bids shall expressly allow for enhancements, options, and/or alternatives and shall set forth the objective criteria or formula to be used for evaluation, and the invitation for bid shall require that prices be stated for all options, enhancements, and/or alternatives. The criteria or formula for evaluation must include objective consideration of the costs and savings and/or benefits associated with the enhancements, options, or alternatives. Based on the evaluation of the cost of the base bid, the dollar value of enhancements, options, or alternatives, and the determination of which enhancements, options, or alternatives best meet the needs of the state, an award shall be made to the bidder providing the best value to the state.
R-24-103-202.5-01 (a) The requirements of §24-103-202.5 CRS regarding low tie bids shall be stated in all Invitations for Bids for commodities.
(b) When low tie bids are received in response to an Invitation for Bids for commodities and tie bidders are either both/all resident bidders or both/all non-resident bidders, the State Purchasing Director or the head of a purchasing agency shall follow the procedures set forth in §24-103-202.5 and shall flip a coin or draw straws to determine which bidder receives the award.
(c) Any tie bid for personal services procured through a competitive sealed bid shall be broken by awarding the contract to the bidder utilizing the greatest quantitative (numerical) preference for veterans in hiring offeror's employees.
R-24-103-203 Competitive Sealed Proposals.
Except as noted below, the competitive sealed proposal process shall be the same as the competitive Sealed Bid process.
R-24-103-203-01 Definitions.
(a) “Acceptable Proposal” means an offer submitted by any person in response to a Request for Proposals, issued by the State, that is in compliance with the solicitation terms and conditions, and within the requirements of the plans and specifications described and required therein.
(b) “Advantageous” means a judgmental assessment of what is in the State's best interests.
(c) “Practicable” means what may be accomplished or put into practical application; reasonably possible.
(d) “Proposal” means a response, from a vendor, to a Request for Proposals (RFP), also called a “response” or “offer”.
(e) “Request for Information (RFI)” is similar to an RFP, but is NOT a source selection method. An RFI is used to obtain preliminary information about a market, type of available service or a product when there is not enough information readily available to write an adequate specification or work statement. An RFI may ask for vendor input to assist the State in preparing a specification or work statement for a subsequent solicitation and may ask for pricing information only with the provision that such information would be submitted voluntarily. The RFI must clearly state that no award will result.
R-24-103-203-02 Written Determinations.
(a) The written determinations required by this section shall be made by the Director or head of a purchasing agency, or a designee of either.
(b) The Director or head of a purchasing agency may make determinations by category of supply, service, or construction item that it is either not practicable or not advantageous to the State to procure specified types of supplies, services, or construction by competitive sealed bidding. Procurements of the specified types of supplies, services or construction may then be made by competitive sealed proposals based upon such determination. The person who made such determination may modify or revoke it at any time, and such determination should be reviewed for current applicability from time to time.
R-24-103-203-03 When Competitive Sealed Bidding Is “Not Practicable” Competitive sealed bidding is not practicable unless the nature of the procurement permits award to a low bidder who agrees by his or her bid to perform without condition or reservation in accordance with the purchase description, delivery or performance schedule, and ail other terms and conditions of the Invitation for Bids. Factors to be considered in determining whether competitive sealed bidding is not practicable include, but are not limited to:
R-24-103-203-04 When Competitive Sealed Bidding Is “Not Advantageous”. A determination may be made to use competitive sealed proposals if it is determined that it is not advantageous to the State, even though practicable, to use competitive sealed bidding. Competitive sealed bidding may be practicable, that is reasonably possible, but not necessarily advantageous, that is, in the State's best interest. Factors to be considered in determining whether competitive sealed bidding is not advantageous include:
R-24-103-203-05 Dollar Thresholds for, and Content of, Requests for Proposals (RFP's).
(a) Requests for Proposals shall be issued (promulgated) by the Division of Purchasing, or agencies with delegated purchasing authority, for requirements that are estimated to exceed the small purchase threshold, utilizing guidelines established by the Division of Purchasing (b) Form of Proposal. The manner and format in which proposals are to be submitted, including any forms for that purpose, shall be as set forth in the Request for Proposals. R-24-103-203-06 Vendor Inquiries In cases where an RFP raises questions or concerns from vendors, or may require interpretation, all known participating vendors must be given an opportunity to ask questions and to receive answers or clarifications. This may be accomplished by use of a pre-proposal conference, via a formal inquiry period, or a combination of options. If any of these options is anticipated, the RFP shall so state and shall list appropriate dates, times and locations.
Pre-proposal conferences may be mandatory or optional. However, if such meetings result in any material changes to the scope of work or otherwise affect the manner or form of response, all known potential offerors must be notified in writing of any such change. Similarly, if responses to inquiries result in any material changes to the scope of work or otherwise affect the manner or form of response, all known potential offerors must be notified in writing of any such change.
When such written notice is given, offerors must be afforded a reasonable amount of time to review these materials, to contemplate any consequences and to consider the content for inclusion in their offers. R-24-103-203-07 Proposal Preparation Time.
Proposal preparation time for formal RFPs shall be set to provide offerors a minimum of 30 calendar days to prepare and submit their proposals. However, when special requirements or conditions exist, the State Purchasing Director or head of a purchasing agency may shorten this time, but in no case shall the time be shortened in order to reduce competition. The State Purchasing Director or head of a purchasing agency shall document why the reduced time period was necessary. R-24-103-203-08 Opening and Recording of Proposals.
Proposals shall be opened publicly and a register of proposals shall be prepared which shall include the name of each offeror.
R-24-103-203-09 Evaluation of Proposals.
Evaluation Factors in the Request for Proposals. The Request for Proposals shall state all of the evaluation factors, including price. The evaluation shall be based on the evaluation factors set forth in the Request for Proposals, Numerical rating systems may be used. Factors not specified in the Request for Proposals shall not be considered.
(a) Veterans' Preference. The relative weight assigned to a criterion, as to the extent and quality of any preference for veterans of military service given by offeror in the hiring of offeror's employees, shall not exceed 5%.
(b) Minority Business Enterprises.
(c) Women's Business Enterprises.
(d) Tie bids. In all solicitations for personal services, by competitive sealed proposal, any tie between offerors shall be broken by awarding the contract to the offeror utilizing the greatest quantitative (numerical) preference for veterans in hiring offeror's employees.
(e) Classifying Proposals, for the purpose of conducting discussion with offerors, proposals shall be initially classified as:
R-24-103-203-10 Proposal Discussion with Individual Offerors after Opening. Purpose of Discussion. Discussions may be held to:
Awards shall be made to the responsible offeror whose proposal is determined to be most advantageous to the State based on the evaluation factors set forth in the Request for Proposals. The evaluation committee established to evaluate offers shall make such determination subject to final approval by the Director or head of a purchasing agency.
R-24-103-204 Small Purchases.
Small purchases are goods and services purchases costing less than $50,000 and construction projects costing less than $150,000. Small purchases may be procured in accordance with the dollar limits and procedures established by this rule. Procurements shall not be artificially divided so as to constitute small purchases under this section. Small purchases are subject to the requirement that prices paid be fair and reasonable. (§24-30-202(2) CRS)
(a) Effective upon the State Purchasing Director's order, small purchases over $1000 must be reported to the Division of Purchasing according to a schedule and by one or more mechanisms acceptable to the State Purchasing Director.
(b) Procurements advertised and posted on BIDS need not be reported separately, if the full award information is properly reported on BIDS.
R-24-103-204-01 Purchase Orders.
The use of Purchase Orders is governed by the Fiscal Rules. R-24-103-204-02 Competition Not Required.
(a) Non-delegated Agencies. Agencies that have not been delegated purchasing authority may purchase supplies or services up to a limit of $1,000 without benefit of competition. Items on a mandatory price agreement issued by the Division of Purchasing must be secured from the appropriate vendor.
(b) Group I and Group II Agencies. Group I and Group II agencies may secure supplies up to a limit of $5,000 without benefit of competition. Items on a mandatory price agreement issued by the Division of Purchasing must be secured from the appropriate vendor.
(c) All agencies shall maximize the opportunity for minority-owned and women-owned business enterprises to receive orders that are issued when bids are not required.
(d) The person doing the acquisition shall use professional judgment to ensure that the State is receiving maximum value. This rule does not preclude the option to place the solicitation on BIDS.
(e) All agencies may procure construction up to $25,000 without benefit of competition. If abuses to this rule are discovered, the Director or head of a purchasing agency may revoke the purchasing authority.
R-24-103-204-03 Documented Quotes (a) Commodities costing between $5,000 and $50,000, services costing between $25,000 and $50,000, and construction projects between $25,000 and $150,000 may be purchased using a documented quote process.
(b) For goods and services procurements, neither the solicitation nor the vendor's response constitutes an “offer”; therefore, “responsiveness” at the time of receipt is not an absolute criterion. The purchasing authority may determine whether or not a response is acceptable and may compare the relative value of competing responses, not solely the price. “Acceptable,” for purposes of this paragraph and paragraphs four and six below, means that the product or service will meet the state's needs and that the price is fair and reasonable. The purchase order/commitment voucher constitutes an offer. The vendor may accept by performance, unless the purchase order/commitment voucher expressly requires acceptance by written acknowledgment.
(c) For construction projects, the contractor's response constitutes an “offer” and is binding if accepted by the state.
(d) The choice of vendor for goods and services must be based on which acceptable response is most advantageous to the state, price/cost being the primary consideration. The basis for the selection must be documented and will be final and conclusive unless determined to be arbitrary, capricious, or contrary to law. For construction projects, the award must be made to the low acceptable quote.
(e) Requests for documented quotes must be placed on BIDS in accordance with R24-102-202.5-02 and -04. Solicitations must remain posted for at least three working days unless the director or head of a purchasing agency determines in writing that a lesser time is required in order to meet an immediate state need.
(f) The purchasing official may negotiate with any vendor or contractor to clarify its quote or to effect modifications that will: make the quote acceptable (including curing a defective bid bond) or make the quote more advantageous to the state. However, in the negotiation process, the terms of one vendor's quote shall not be revealed to a competing vendor, and quotes may be kept confidential until a commitment voucher is issued.
(g) Procurement of services greater than $5000.must be reviewed by the delegated purchasing official for a determination that prices or rates are fair and reasonable.
(h) Agencies may, with the approval of the State Buildings Program, utilize a Standing Order Process for projects less than $150,000. An approved process must include open public solicitation (including advertising on BIDS) for eligible contractors at least once per year, a process for obtaining at least three quotes before awarding a contract to an eligible contractor, and an equitable process for determining which contractors will be given an opportunity to provide quotes.
(i) Bonding and retainage requirements set forth in §38-26-106, §24-105-201 et seq. and §24-91-103(1) and rules promulgated thereunder are not affected by this rule. Failure to provide a bid bond if required but not cured makes the quote unacceptable. Agencies should seek legal advice when bid bonds have been required and the terms of the quote are modified after receipt. R-24-103-205-01 Sole Source Procurements.
(a) Conditions for Use. A sole source procurement is justified when there is only one good or service that can reasonably meet the need and there is only one vendor who can provide the good or service. A requirement for a particular proprietary item (i.e., a brand name specification) does not justify a sole source procurement if there is more than one potential bidder or offeror for that item. The following are examples of circumstances which could justify a sole source procurement:
(b) Exemptions. Sole source determinations are not required under circumstances outlined in 24-101- 105, C.R.S., as amended, and related rules.
R-24-103-205-02 Negotiation.
When a sole source procurement is authorized, the Procurement Officer shall conduct negotiations, as appropriate, as to price, delivery, and terms.
R-24-103-206 EMERGENCY PROCUREMENTS.
R-24-103-206-01 Definition of Emergency Conditions.
An emergency condition is a situation which creates a threat to public health, welfare, or safety such as may arise by reason of floods, epidemics, riots, equipment failures, or such other reason as may be proclaimed by the using agency and approved by the director, head of a purchasing agency, or designee. The existence of such condition creates an immediate and serious need for supplies, services, or construction that cannot be met through normal procurement methods and the lack of which would seriously threaten:
(a) the functioning of state government, or its programs;
(b) the preservation or protection of property; or (c) the health or safety of any person or persons.
R-24-103-206-02 Scope of Emergency Procurements.
Emergency procurements shall be limited only to a quantity of those supplies, services, or construction items necessary to meet the emergency.
R-24-103-206-03 Authority to Make Emergency Procurements. Any state agency may make emergency procurements when an emergency condition arises and the need cannot be met through normal procurement methods, provided that whenever practical, approval by the Director, or head of a purchasing agency, shall be obtained prior to the procurement. In the event an emergency arises after normal working hours, the state agency shall notify the Director, or head of a purchasing agency, on the next working day.
R-24-103-206-04 Source Selection Methods.
(a) General. The procedure used shall be selected to assure that the required supplies, services, or construction items are procured in time to meet the emergency. Given this constraint, such competition as is practicable shall be obtained.
(a) Determination Required. The Procurement Officer or the agency official responsible for procurement shall make a written determination stating the basis for an emergency procurement and for the selection of the particular contractor. Such determination shall be sent promptly to the director. R-24-103-208-01 Competitive Reverse Auctions Contracts for goods and services may be awarded by competitive reverse auctions if the director or head of a purchasing agency determines that adequate competition can be achieved and that the process is likely to result in better pricing.
Competitive reverse auction means a computer aided bidding process through which a pre-established group of vendors may post bids for a defined period of time and may change their bids as desired during the bidding period.
(a) The intent to conduct a competitive reverse auction shall be published on the BIDS system for a period of not less than 14 days. The BIDS notice shall include all terms, conditions, and specifications and shall tell interested vendors how to participate in the process. If the director or head of a purchasing agency believes that BIDS is not likely to yield adequate competition, the agency may notify potential vendors through additional methods; however, vendors must register for BIDS prior to the auction process to be eligible to participate.
(b) All responsible vendors willing to accept the terms and conditions of the procurement and to meet the specifications of the bid shall be eligible to participate. The purchasing agency may conduct a preliminary process to determine vendor responsibility and to ensure the vendor's responsiveness to terms and specifications.
(c) During the bidding process, the participating vendors shall be identified only by a letter, number, or other symbol to protect their identities; each bid price and the letter, number, or symbol designation of the vendor shall be posted for all bidding vendors immediately upon receipt.
(d) The contract shall be awarded to the low responsible bidder whose bid meets the requirements and specifications.
R-24-103-208-02 Competitive Negotiation Contracts may be awarded by competitive negotiation.
(a) If the director or head of a purchasing agency determines that time does not permit resolicitation, a contract may be awarded by competitive negotiation after an unsuccessful competitive seated bid or competitive sealed proposal process.
(b) A competitive sealed bid or competitive sealed proposal process is unsuccessful if (1) all offers received are unreasonable or uncompetitive, (2) the low bid exceeds available funds, as certified in writing by the appropriate fiscal officer, (3) the solicitation has been properly cancelled in accordance with the provisions of §24-103-301 or §24-109-401 and -402 CRS, or (4) the number of responsive offers is not adequate to ensure adequate price competition.
(c) The competitive negotiation process shall include all vendors who responded to the solicitation or any rebid and may include other vendors capable of fulfilling the state's needs.
(d) The purchasing agency may set reasonable times and locations for participation in the competitive negotiation, reflecting the fact that time constraints are the basis for the competitive negotiation process.
(e) Each vendor with whom the purchasing agency negotiates shall be given a fair and equal chance to compete. Negotiations shall be conducted separately and independently with each vendor, and in no case shall the terms of any vendor's offer be communicated to any other vendor until an intent to award notice has been issued. Any change in requirements shall be communicated to all vendors.
(f) A vendor may be eliminated from the process upon a determination that its offer is not reasonably susceptible of being selected for award.
(g) The award shall be made to the vendor whose offer is most advantageous to the state. The director or head of a purchasing agency shall make a written determination that identifies the nature of the discussions with each vendor and that states why the selected offer is the most advantageous to the state.
PART 3 CANCELLATION OF SOLICITATIONS: REJECTION OF BIDS OR PROPOSALS R-24-103-301 Cancellation of Invitations for Bids or Requests for Proposals. R-24-103-301-01 Scope of This Rule The provisions of this rule shall govern the cancellation of any solicitations whether issued by the state under competitive sealed bidding, competitive sealed proposals, small purchases, or any other source selection method, and rejection of bids or proposals in whole or in part, whether rejected for being non- responsive or non-responsible.
R-24-103-301-02 Policy Solicitations should only be issued when there is a valid procurement need. Solicitations should not be issued to obtain estimates or to “test the water.” A solicitation is to be cancelled only when there are cogent and compelling reasons to believe that the cancellation of the solicitation is in the state's best interest.
R-24-103-301-03 Cancellation of Solicitation; Notice Each solicitation issued by the State shall contain language stating that the solicitations may be cancelled as provided in this rule.
R-24-103-301-04 Cancellation of Solicitation: Rejection of all Bids or Proposals (a) Prior to Opening. Prior to opening of bids, a solicitation may be cancelled in whole or in part when the Director, or the head of a purchasing agency, determines in writing that such action is in the state's best interest for reasons including but not limited to:
(b) Notice. When a solicitation is cancelled prior to opening, notice of cancellation shall be sent to all businesses solicited. The notice of cancellation shall:
(c) After Opening. After opening but prior to award, any or all bids or proposals may be rejected in whole or in part when the Director or the head of a purchasing agency, determines in writing that such action is in the state's best interest for reasons including but not limited to:
A notice of rejection should be sent to all businesses that submitted bids or proposals.
(d) Documentation. The reasons for cancellation or rejection shall be made a part of the procurement file and shall be available for public inspection.
(e) Disposition of Bids or Proposals. When bids or proposals are rejected, or a solicitation cancelled after bids or proposals are received, the bids or proposals which have been opened shall be retained in the procurement file, or if unopened, returned to the bidders or offerors upon request, or otherwise disposed of.
PART 4 QUALIFICATIONS AND DUTIES R-24-103-401 Responsibility of Bidders and Offerors R-24-103-401-01 Application A determination of responsibility or non-responsibility shall be governed by this Rule. R-24-103-401-02 Standards of Responsibility (a) Standards. Factors to be considered in determining whether the standard of responsibility has been met include whether a prospective contractor or vendor has:
(b) Information Pertaining to Responsibility. The prospective contractor shall supply information requested by the Procurement Officer concerning the responsibility of such contractor. If such contractor fails to supply the requested information, the Procurement Officer shall base the determination of responsibility upon any available information or may find the prospective contractor non-responsible if such failure is unreasonable. R-24-103-401-03 Ability to Meet Standards The prospective contractor or vendor may demonstrate the availability of necessary financing, equipment, facilities, expertise, and personnel by submitting upon request:
(a) evidence that such contractor possesses such necessary items;
(b) acceptable plans to subcontract for such necessary items; or (c) a documented commitment from, or explicit arrangement with, a satisfactory source to provide the necessary items.
R-24-103-401-04 Written Determination of Non-responsibility Required If a bidder or offeror who otherwise would have been awarded a contract is found non-responsible, a written determination of non-responsibility setting forth the basis of the finding shall be prepared by the Director or head of a purchasing agency. A copy of the determination shall be sent promptly to the non- responsible bidder or offeror. The final determination shall be made part of the procurement file. R-24-103-402 Prequalification R-24-103-402-01 Requirements.
State construction projects of $150,000 or more, and under the supervision of the State Buildings Section, Department of Personnel, require the Contractor to be qualified with that Section. Projects under $150,000 do not normally require pre-qualification. A contractor, to be qualified with the Colorado State Buildings Section, must annually file State Form SC-9.1, “Contractor's Statement of Experience,” and be qualified at least two (2) calendar days prior to the date fixed for publicly opening sealed bids. This form can be obtained by writing the Director, State Buildings Section. Filing instructions are detailed in the form under INSTRUCTIONS. THE STATE BUILDINGS SECTION WILL PRE-QUALIFY ONLY ONE ENTITY OWNED BY OR CONTROLLED BY A CORPORATION, AN INDIVIDUAL, A JOINT VENTURE OR PARTNERSHIP. UNDER NO CIRCUMSTANCES WILL TWO OR MORE ENTITIES OWNED OR CONTROLLED BY A SINGLE CORPORATION, INDIVIDUAL, PARTNERSHIP OR JOINT VENTURE SUBMIT BIDS FOR THE SAME CONTRACT. The fact that a prospective contractor has been pre- qualified does not necessarily represent a finding of responsibility. The Director, or head of a purchasing agency, may develop additional pre-qualification procedures for specific solicitations.
R-24-103-403 Cost or Pricing Data.
R-24-103-403-01 Definitions.
(a) Cost Data is factual information concerning the cost of labor, material, overhead, and other cost elements which are expected to be incurred or which have been actually incurred by the contractor in performing the contract.
(b) Price Data is factual information concerning prices for supplies, services, or construction substantially identical to those being procured. Prices in this definition refer to offered or proposed selling prices, historical selling prices, and current selling prices of such items. The definition refers to data relevant to both prime and subcontract prices.
R-24-103-403-02 Requirement for Cost or Pricing Data.
Cost or pricing data is required to be submitted in support of a proposal when:
(a) adjusting the price of any contract, including a contract awarded by competitive sealed bidding, whether or not cost or pricing data were required in connection with the initial pricing of the contract, if the adjustment involves aggregate increases and/or decreases in costs plus applicable profits expected to exceed $500. However, this requirement shall not apply when unrelated and separately priced adjustments for which cost or pricing data would not be required if considered separately are consolidated for administrative convenience;
(b) an emergency procurement is made in excess of $25,000, but such data may be submitted after contract award; or (c) the procurement officer makes a written determination that the circumstances warrant requiring submission of cost or pricing data provided, however, cost or pricing data shall not be required where the contract award is made pursuant to competitive sealed bidding. R-24-103-403-03 Submission of Cost or Pricing Data and Certification.
(a) Time and Manner. When cost or pricing data are required, they shall be submitted to the procurement officer prior to beginning price negotiations at any reasonable time and in any reasonable manner prescribed by the procurement officer. When the procurement officer requires the offeror or contractor to submit cost or pricing data in support of any proposal, such data shall be either actually submitted or specifically identified in writing.
(b) Obligation to Keep Data Current. The offeror or contractor is required to keep such submission current until the negotiations are concluded.
(c) Time for Certification. The offeror or contractor shall certify as soon as practicable after agreement is reached on price that the cost or pricing data submitted are accurate, complete, and current as of a mutually determined date prior to reaching agreement.
(d) Refusal to Submit Data. A refusal by the offeror to supply the required data shall be referred to the Director or the head of a purchasing agency, whose duty shall be to determine, in writing, whether to disqualify the non-complying offeror, to defer award pending further investigation, or to enter into the contract. A refusal by a contractor to submit the required data to support a price adjustment shall be referred to the Director or the head of a purchasing agency who shall determine, in writing, whether to further investigate the price adjustment, not to allow any price adjustment, or to set the amount of the adjustment, subject to the contractor's rights under Article 109 (Remedies) of the Colorado Procurement Code.
(e) Exceptions. Cost and pricing data need not be submitted and certified:
R-24-103-403-04 Meaning of Terms “Adequate Price Competition,” “Established Catalogue Prices or Market Prices,” and “Prices Set by Law or Regulation”.
(a) Application. As used in the exceptions set forth in Rule R-24-103-403-03(e) (Cost or Price Data, Exceptions) the terms “adequate price competition,” “established catalogue prices or market prices,” and “prices set by law or regulations” shall be construed in accordance with the following definitions.
(b) Adequate Price Competition. Price competition exists if competitive sealed proposals are solicited and at least two responsible offerors independently compete for a contract to be awarded to the responsible offeror submitting the lowest evaluated price by submitting priced offers (or best and final offers) meeting the requirements of the solicitation. If the foregoing conditions are met, price competition shall be presumed to be “adequate” unless the procurement officer determines in writing that such competition is not adequate.
(c) Established Catalogue Prices or Market Prices.
R-24-103-403-05 Defective Cost or Pricing Data.
(a) Overstated Cost or Pricing Data. If certified cost or pricing data are subsequently found to have been inaccurate, incomplete, or non-current as of the date stated in the certificate, the State is entitled to an adjustment of the contract price, including profit or fee, to exclude any significant sum by which the price, including profit or fee was increased because of the defective data. Judgmental errors made in good faith concerning the estimated portions of future costs or projections do not constitute defective data. It is presumed that overstated cost or pricing data increased the contract price in the amount of the defect plus related overhead and profit or fee. Therefore, unless there is a clear indication that the defective data were not used or relied upon, the price should be reduced in such amount. In establishing that the defective data caused an increase in the contract price, the procurement officer is not expected to reconstruct the negotiation by speculating as to what would have been the mental attitudes of the negotiating parties if the correct data had been submitted at the time of agreement on price.
(b) Offsetting Understated Cost or Pricing Data. In determining the amount of a downward adjustment, the contractor shall be entitled to an offsetting adjustment for any understated cost or pricing data submitted in support of price negotiations for the same pricing action up to the amount of the State's claim for overstated cost or pricing data arising out of the same pricing action.
(c) Dispute as to Amount. If the contractor and the procurement officer cannot agree as to the amount of adjustment due to defective cost or pricing data, the procurement officer shall set an amount in accordance with Sub-sections (a) and (b) of this Section and the contractor may appeal this decision under Article 109 (Remedies) of the State of Colorado Procurement Code. PART 5 TYPES OF CONTRACTS R-24-103-501 Types of Contracts.
(See Statute)
The minimum requirements for contract formation and content are contained in Chapter 3 of the Colorado Fiscal Rules.
R-24-103-502 Approval of Accounting System.
(See Statute)
R-24-103-503 Multi-Year Contracts The Division of Purchasing or agencies with delegated purchasing authority may enter into multi-year contracts for supplies or services subject to funding availability. Contracts for periods in excess of five years shall not be executed without written permission of the State Purchasing Director. Specifications for multi-year contracts shall contain conditions of renewal or extension, if any. Methods used to determine any price escalation/de-escalation shall be part of the original specifications and made a part of the contract. Contracts shall only be renewed or extended if funds are available for the new contract period.
PART 6 AUDIT OF RECORDS (See Statute)
PART 7 DETERMINATIONS AND REPORTS (See Statute)
ARTICLE 104 SPECIFICATIONS PART 1 DEFINITIONS R-24-104-101 DEFINITIONS.
R-24-104-101-01 Terms Defined in this Chapter.
(a) Brand Name Specification: Means a specification limited to one or more items by manufacturer's names or catalogue numbers.
(b) Brand Name or Equal Specification: Means a specification which uses one or more manufacturer's names or catalogue numbers to describe the standard of quality, performance, and other characteristics needed to meet state requirements, and which provides for the submission of equivalent products.
(c) Qualified Products List: Means an approved list of supplies, services or construction items described by model or catalogue numbers, which prior to competitive solicitation, the state has determined will meet the applicable specification requirements.
(d) Specifications: See Statute; includes performance characteristics. PART 2 SPECIFICATIONS R-24-104-201 Duties of the Executive Director R-24-104-201-01 General Purpose and Policies (a) Purpose. The purpose of a specification is to serve as a basis for obtaining a supply, service, or construction item adequate and suitable for the State's needs in a cost effective manner, taking into account, to the extent practicable, the costs of ownership and operation as well as initial acquisition costs, i.e., value analysis. It is the policy of the State that specifications permit maximum practicable competition consistent with this purpose. Specifications shall be drafted with the objective of clearly describing the State's requirements.
(b) Use of Functional or Performance Descriptions. Specifications shall, to the extent practicable, emphasize functional or performance criteria while limiting design or other detailed physical descriptions to those necessary to meet the needs of the State. To facilitate the use of such criteria, using agencies shall endeavor to include as part of their purchase requisitions the principal functional or performance needs to be met. It is recognized, however, that the preference for use of functional or performance specifications is primarily applicable to the procurement of supplies and services. Such preference is often not practicable in construction, apart from the procurement of supply type items for a construction project.
(c) Preference for Commercially Available Products. It is the general policy of this State to procure standard commercial products whenever practicable. In developing specifications, accepted commercial standards shall be used and unique requirements shall be avoided, to the extent practicable.
R-24-104-202 Brand Name or Equal Specification: Conditions for Use Brand name or equal specifications may be used when it is in the best interest of the State and when the item to be procured is best described by use of such a specification. Brand name or equal specifications shall seek to designate three or as many different brands as are practicable as “or equal” references and shall further state that substantially equivalent products to those designated will be considered for award. Where a brand name or equal specification is used in a solicitation, the solicitation shall contain explanatory language that the use of a brand name is for the purpose of describing the standard of quality, performance, and characteristics desired and is not to limit or restrict competition. R-24-104-202-01 Brand Name Specifications: Conditions for Use Since use of a brand name specification is restrictive, it may be used when only the brand name or items will satisfy the State's needs. The procurement officer shall seek to identify sources from which the designated brand name or item can be obtained and shall solicit such sources to achieve whatever degree of competition is practicable. If only one source can supply the requirement, the procurement shall be made under Rule R-24-103-205 (Sole Source Procurement). R-24-104-202-02 Qualified Products List: Conditions for Use A qualified products list may be developed with the approval of the Director or the head of a purchasing agency when testing or examination of the supplies or construction items prior to issuance of the solicitation is desirable or necessary in order to best satisfy the State's requirements. When developing a qualified products list, a representative group of potential suppliers may be solicited in writing to submit products for testing and examination to determine acceptability for inclusion on a qualified products list. Any potential supplier, even though not solicited, may offer its products for consideration on subsequent solicitations.
R-24-104-203 Exempted Items (See Statute)
R-24-104-204 Relationship With Using Agencies.
(See Statute)
R-24-104-205 Maximum Practicable Competition.
(See Statute)
R-24-104-206 Ownership Considerations.
(See Statute)
ARTICLE 105 CONSTRUCTION CONTRACTS PART 1 MANAGEMENT OF CONSTRUCTION CONTRACTING R-24-105-101 Responsibility for Selection of Methods of Construction Contracting Management. R-24-105-101-01 Definitions (a) Prime Contractor, as used in this article means a person who has a contract with the state to build, alter, repair, improve, or demolish any public structure or building, or other public improvements of any kind to any public real property.
R-24-105-101-02 General Definitions (a) Use of Definitions. The following definitions are to provide a common vocabulary for use in the context of this Rule and for general discussion concerning the construction contracting activities of the state. The methods described are not all mutually exclusive and often may be combined on one project. These definitions are not intended to be fixed in respect to all construction projects of the state. In each project these definitions may be adapted to fit the circumstances of that project. However, the procurement officer should endeavor to ensure that these terms are defined adequately in the appropriate contracts, are not used in a misleading manner, and are understood by all relevant parties. Significant deviations from the definitions provided in this Rule should be explicitly noted.
(b) Single Prime Contractor. The single prime contractor method of contracting is typified by one business (general contractor) contracting with the state to timely complete an entire construction project in accordance with plans and specifications provided by the state. Often these plans and specifications are prepared by a private architectural firm under contract to the state. Further, while the general contractor may take responsibility for successful completion of the project, much of the work may be performed by specialty contractors with whom the prime contractor has entered into subcontracts.
(c) Multiple Prime Contractors. Under the multiple prime contractor method, the state or the state's agent contracts directly with a number of specialty contractors to complete portions of the project in accordance with state plans and specifications. The state or its agent may have primary responsibility for successful completion of the entire project, or the contracts may provide that one of the multiple prime contractors has this responsibility.
(d) Design-Build or Turnkey. In design-build or turnkey project, a business contracts directly with the state to meet the state's requirements as described in a set of performance specifications by constructing a facility to its own plans and specifications. Design responsibility and construction responsibility both rest with the design-build contractor. This method can include instances where the design-build contractor supplies the site as part of the package.
(e) Construction Manager. Construction management is a team approach to construction. A construction manager is a firm or individual experienced in construction that has the ability to evaluate and to implement plans and specifications as they affect time, cost, and quality of construction and the ability to coordinate the design (consisting of architect/engineers and other consultants as may be required as team members) and construction of the project, including the administration of change orders. The state contracts with a qualified construction manager to act for the state in the construction project as specified in the construction management contract.
(f) Sequential Design and Construction. Sequential design and construction denotes a method in which design of substantially the entire structure is completed prior to beginning the construction process.
(g) Phased Design and Construction. Phased design and construction denotes a method in which construction is begun when appropriate portions have been designed, but before substantial design of the entire structure has been completed. This method is also known as fast-track construction.
R-24-105-201-02 Acceptable Bid Security.
Acceptable bid security shall be limited to:
R-24-105-202 Contract Performance and Payment Bonds.
R-24-105-202-01 Performance Bonds (See Statute)
R-24-105-202-02 Payment Bonds (See Statute)
R-24-105-202-03 Exceptions If it is deemed to be in the State's best interest, the procurement officer may require, as provided in 24- 105-202(2), CRS, a performance bond or other security in addition to those bonds or in circumstances other than those specified in Section 24-105-202(a), (b), CRS, as amended. R-24-105-203 Bond Forms and Copies.
R-24-105-203-01 Forms Performance bonds, labor and material payment bonds, and bid bonds shall be executed on forms as prescribed by the Department of Personnel, State Buildings Section. PART 3 CONSTRUCTION CONTRACT CLAUSES AND FISCAL RESPONSIBILITY R-24-105-301 Contract Clauses and Their Administration. The clauses required by §24-105-301 CRS are hereby promulgated and set forth in the General Conditions of the Contract as Articles 35 General, 35A, 35B, 37, 38, 46, 48B, 49, and 50, as shown in Appendix A of these Procurement Rules. The entire text of the General Conditions of the Contract is included in Appendix A for the reader's convenience; however, only these articles are regulatory. All other provisions of the General Conditions of the Contract are subject to revision without rulemaking. R-24-105-301-01 General Conditions of the Contract.
All construction contracts shall have incorporated as a part of the contract documents, “The General Conditions of the Contract,” State.
R-24-105-302 Fiscal Responsibility.
(See Statute)
ARTICLE 106 MODIFICATION AND TERMINATION OF CONTRACTS (FOR OTHER THAN CONSTRUCTION)
R-24-106-101 Contract Clauses - Price Adjustments - Additional Clauses - Modification. (See Statute)
R-24-106-101-01 Revisions to Contract Clauses These clauses may be varied for use in a particular contract at the discretion of the procurement officer. R-24-106-102-02 Changes Clause (a) Changes Clause in Fixed-Price Contracts. In fixed-price contracts, the following clause may be inserted:
(a) Use of Clause. This clause is authorized for use in any fixed- price contract under which work stoppage may be required for reasons such as advancements in the state of the art, production modification, engineering changes or realignment of programs.
(b) Use of Orders
(c) Clause
R-24-106-101-04 Variations in Estimated Quantities Clause (a) Define Quantity Contracts. The following clause may be used in definite quantity supply or service contracts:
(b) Indefinite Quantity Contracts. No clause is provided here. However, the solicitation and contract should include:
R-24-106-101-05 Price Adjustment Clause The following clause may be used when price adjustments are anticipated:
(a) Price Adjustment Method. Any adjustment in contract price pursuant to the application of a clause in this contract shall be made in one or more of the following ways:
(b) Submission of Cost or Pricing Data. The contractor shall provide cost or pricing data for any price adjustment subject to the provisions of the Cost or Pricing Data section of the Colorado State Procurement Rules.
R-24-106-101-06 Termination for Default Clause (a) Default. If the contractor refuses or fails to timely perform any of the provisions of this contract, with such diligence as will ensure its completion within the time specified in this contract, the procurement officer may notify the contractor in writing of the non-performance, and if not promptly corrected, such officer may terminate the contractor's right to proceed with the contract or such part of the contract as to which there has been delay or a failure to properly perform. The contractor shall continue performance of the contract to the extent it is not terminated and shall be liable for excess costs incurred in procuring similar goods or services elsewhere.
(b) Contractor's Duties. Notwithstanding termination of the contract and subject to any directions from the procurement officer, the contractor shall take timely reasonable, and necessary action to protect and preserve property in the possession of the contractor in which the purchasing agency has an interest.
(c) Compensation. Payment for completed supplies delivered and accepted by the purchasing agency shall be at the contract price. The purchasing agency may withhold amounts due to the contractor as the procurement officer deems to be necessary to protect the purchasing agency against loss because of outstanding liens or claims of former lien holders and to reimburse the purchasing agency for the excess costs incurred in procuring similar goods and services.
(d) Excuse for Nonperformance or Delayed Performance. The contractor shall not be in default by reason of any failure in performance of this contract in accordance with its terms if such failure arises out of acts of God; acts of the public enemy; acts of the state and any governmental entity in its sovereign or contractual capacity; fires; floods; epidemics; quarantine restrictions; strikes or other labor disputes; freight embargoes; or unusually severe weather. Upon request of the contractor, the procurement officer shall ascertain the facts and extent of such failure, and, if such officer determines that any failure to perform was occasioned by any one or more of the excusable causes, and that, but for the excusable cause, the contractor's progress and performance would have met the terms of the contract, the delivery schedule shall be revised accordingly, subject to the rights of the purchasing agency.
(e) Erroneous Termination for Default. If after notice of termination of the contractor's right to proceed under the provisions of this clause, it is determined for any reason that the contractor was not in default under the provisions of this clause, or that the delay was excusable, the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to the termination for convenience clause.
R-24-106-101-07 Liquidated Damages Clause The State may insert the following clause in construction contracts: “When the contractor is given notice of delay or nonperformance and fails to cure in the time specified, in addition to any other damages that are applicable, the contractor shall be liable for a $_______ (amount to be filled in for each contract) per calendar day from date set for cure until either the purchasing agency reasonably obtains similar supplies or services if the contractor is terminated for default, or until the contractor provides the supplies or services if the contractor is not terminated for default. To the extent that the contractor's delay or nonperformance is excused under the Excuse for Nonperformance or Delayed Performance paragraph of the Termination for Default Clause of this contract, liquidated damages shall not be due the purchasing agency:”
R-24-106-101-08 Termination for Convenience Clause (a) Termination. The procurement officer may, when the interests of the purchasing agency so require, terminate this contract in whole or in part, for the convenience of the agency. The procurement officer shall give written notice of the termination to the contractor specifying the part of the contract terminated and when termination becomes effective. This in no way implies that the purchasing agency has breached the contract by exercise of the Termination for Convenience Clause.
(b) Contractor's Obligations. The contractor shall incur no further obligations in connection with the terminated work and on the date set in the notice of termination the contractor will stop work to the extent specified. The contractor shall also terminate outstanding orders and subcontracts as they relate to the terminated work. The contractor shall settle the liabilities and claims arising out of the termination of subcontracts and orders connected with the terminated work. The procurement officer may direct the contractor to assign the contractor's right, title, and interest under terminated orders or subcontracts to the purchasing agency. The contractor must still complete and deliver to the purchasing agency the work not terminated by the Notice of Termination and may incur obligations as are necessary to do so.
(c) Compensation.
R-24-106-101-09 Novation, Assignment or Change of Name (a) Assignment. No contract is transferable, or otherwise assignable, without the written consent of the procurement officer, provided, however, that a contractor may assign monies receivable under a contract after due notice to the purchasing agency.
(b) Recognition of a Successor in Interest Novation. When in the best interest of the purchasing agency, a successor in interest may be recognized in a novation agreement in which the transferor and the transferee shall agree that:
(c) Change of Name. When a contractor requests to change the name in which it holds a contract with a purchasing agency, the procurement officer responsible for the contract shall, upon receipt of a document indicating such change of name (for example, an amendment to the articles of incorporation of the corporation), enter into an agreement with the requesting contractor to effect such a change of name. The agreement changing the name should specifically indicate that no other terms and conditions of the contract are thereby changed. ARTICLE 107 COST PRINCIPLES R-24-107-101 Administrative Rules - Cost Reimbursement. R-24-107-101-01 Applicability of Cost Principles (a) Application. This subpart contains cost principles and procedures to be used as guidance in:
(b) Limitation. Cost principles in this subpart are not applicable to:
R-24-107-101-02 Allowable Costs (a) General. Any contract cost proposed for estimating purposes or invoiced for cost-reimbursement purposes shall be allowable as provided in the contract. The contract shall provide that the total allowable cost of a contract is the sum of the allowable direct costs actually incurred (or, in the case of forward pricing, the amount estimated to be incurred) in the performance of the contract in accordance with its terms, plus the properly allocable portion of the allowable indirect costs, less any applicable credits (such as discounts, rebates, refunds, and property disposal income).
(b) Accounting Consistency. All costs shall be accounted for in accordance with generally accepted accounting principles and in a manner that is consistent with the contractor's usual accounting practices in charging costs to other activities. In pricing a proposal, a contractor shall estimate costs consistently with cost accounting practices used in accumulating and reporting costs, (c) When Allowable. The contract shall provide that costs shall be allowed to the extent they are:
Any cost is reasonable if, in its nature or amount, it does not exceed that which would be incurred by an ordinarily prudent person in the conduct of competitive business. In determining the reasonableness of a given cost, consideration shall be given to:
R-24-107-101-04 Allocable Costs (a) General. A cost is allocable if it is assignable or chargeable to one or more cost objectives in accordance with relative benefits received and if it:
(b) Allocation Consistency. Costs are allocable as direct or indirect costs. Similar costs (those incurred for the same purpose, in like circumstances) shall be treated consistently either as direct costs or indirect costs except as provided by these regulations. When a cost is treated as a direct cost in respect to one cost objective, it and all similar costs shall be treated as a direct cost for all cost objectives.
Further, all costs similar to those included in any indirect cost pool shall be treated as indirect costs. All distributions to cost objectives from a cost pool shall be on the same basis.
(c) Direct Cost. A direct cost is any cost which can be identified specifically with a particular cost objective. A direct cost shall be allocated only to its specific cost objective. To be allowable, a direct cost must be incurred in accordance with the terms of the contract.
(d) Indirect Costs
(a) Advertising. The only allowable advertising costs are those for:
(b) Bad Debts. Bad debts include losses arising from uncollectible accounts and other claims, such as dishonored checks, employee advances, and related collection and legal costs. All bad debt costs are unallowable.
(c) Contingencies
(d) Depreciation and Use Allowances
(e) Entertainment
(f) Fines and Penalties. Fines and penalties include all costs incurred as the result of violations of or failure to comply with federal, state and local laws and regulations. Fines and penalties are unallowable costs unless incurred as a direct result of compliance with specific provisions of the contract or written instructions of the procurement officer. To the extent that workmen's compensation is considered by state law to constitute a fine or penalty, it shall not be an allowable cost under this subsection.
(g) Gifts, Contributions and Donations. A gift is property transferred to another person without the other person providing return consideration of equivalent value. Reasonable costs for employee morale, health, welfare, food services, or lodging are not gifts and are allowable. Contributions and donations are property transferred to a nonprofit institution which are transferred in exchange for supplies or services of equivalent fair market value rendered by a nonprofit institution. Gifts, contributions and donations are unallowable.
(h) Interest Costs
(i) Material Costs
(j) Taxes
(a) General. The costs described in subsections (b), (c), (d), and (e) of this section are allowable as direct costs to cost- reimbursement type contracts to the extent that they have been approved in advance by the procurement officer. In other situations those costs are negotiable in accordance with general standards set out herein.
(b) Pre-Contract Costs. Pre-contract costs are those incurred prior to the effective date of the contract directly pursuant to, and in anticipation of, the award of the contract. Such costs are allowable to the extent that they would have been allowable if incurred after the date of the contract; provided that, in the case of a cost-reimbursement type contract, a special provision must be inserted in the contract setting forth the period of time and maximum amount of cost which will be covered as allowable pre-contract costs.
(c) Bid and Proposal Costs, Bid and proposal costs are the costs incurred in preparing, submitting and supporting bids and proposals. Reasonable ordinary bid and proposal costs are allowable as direct costs only to the extent that they are specifically permitted by a provision of the contract or solicitation document. Where bid and proposal costs are allowable as direct costs, to avoid double accounting, the same bid and proposal costs shall not be charged as indirect costs.
(d) Insurance
(e) Litigation Costs. Litigation costs include all filing fees, legal fees, expert witness fees, and all other costs involved in litigating claims in court or before an administrative board. Litigation costs are allowable as indirect costs in accordance with these regulations, except that costs incurred in litigation against the purchasing agency are unallowable. R-24-107-101-07 Applicable Credits (a) Definitions and Examples. Applicable credits are receipts or price reductions which offset or reduce expenditures allocable to contracts as direct or indirect costs. Examples include purchase discounts, rebates, allowance, recoveries or indemnification for losses, sale of scraps and surplus equipment and materials, adjustments for overpayments or erroneous charges, and income from employee recreational, incidental, or services and food sales.
(b) Reducing Costs. Credits shall be applied to reduce related direct or indirect costs.
(c) Refund. The purchasing agency shall be entitled to a cash refund if the related expenditures have been paid to the contractor under a cost-reimbursement type contract. R-24-107-101-08 Advance Agreements (a) Purpose. Both the purchasing agency and the contractor should seek to avoid disputes and litigation arising from potential problems by providing in the terms of the contract the treatment to be accorded special or unusual costs.
(b) Procedure Required. Advance agreements may be negotiated either before or after contract award, but shall be negotiated before a significant portion of the cost covered by the agreement has been incurred. Advance agreements shall be in writing, executed by both contracting parties and incorporated in the contract.
(c) Limitation on Costs Covered. An advance agreement shall not provide for any treatment of costs inconsistent with these regulations unless a determination has been made pursuant to Section R- 24-107-101-10 (Authority to Deviate from Cost Principles). R-24-107-101-09 Use of Federal Cost Principles.
(a) Cost Negotiations. In dealing with contractors operating according to federal cost principles, such as Defense Acquisition Regulation, Section 15, or Federal Procurement Regulations, Part 1-15, the procurement officer, after notifying the contractor, may use the federal cost principles as guidance in contract negotiations, subject to subsection (b) of this section.
(b) Incorporation of Federal Cost Principles: Conflicts Between Federal Principles and This Part
R-24-107-101-10 Authority to Deviate from Cost Principles If a procurement officer desires to deviate from the cost principles set forth in these regulations, a written determination shall be made by such officer specifying the reasons for the deviation. ARTICLE 108 SUPPLY MANAGEMENT (Deleted. See Statute)
ARTICLE 109 REMEDIES PART 1 PRELITIGATION RESOLUTION OF CONTROVERSIES R-24-109-101 Resolution of Controversies.
(See Statute)
R-24-109-102-01 Filing of Protest (a) Subject of Protest. Protestors may file a protest on any phase of solicitation or award, including but not limited to specifications, award, or disclosure of information marked confidential in the bid offer.
(b) Form. The written protest shall include, as a minimum, the following:
Any additional information regarding the protest should be submitted within the time period requested in order to expedite resolution of the protest. If any party fails to comply expeditiously with any request for information by the Director or head of a purchasing agency, the protest may be resolved without such information.
R-24-109-102-03 Decision If an action concerning the protest has been commenced in court, the Director or head of a purchasing agency shall not act on the protest but shall refer it to the Attorney General. The decision shall inform the protester of his or her right to appeal administratively or judicially in accordance with Article 109 (Remedies) of the Colorado Procurement Code.
R-24-109-103 Stay of Procurement During Protest CRS 24-109-103 was repealed by the General Assembly effective June 6, 1985. This only affects Competitive Sealed Bids or awards of any type other than Competitive Sealed Proposals. A stay of a contract for Competitive Sealed Proposals is in effect until any protest is resolved pursuant to CRS 24- 109-102. (See CRS 24-103-203(7) effective April 8,1996). R-24-109-104 Entitlement to Costs.
(See Statute)
R-24-109-105 Debarment And Suspension.
R-24-109-105-01 Suspension.
(a) Initiation. After consultation with the affected using agency, the Attorney General, and where practicable, the contractor or potential contractor who is to be suspended, the director may issue a written determination to suspend a person from consideration of contracts pending an investigation to determine whether cause exists for debarment. A notice of suspension, including a copy of the determination, shall be sent to the suspended contractor or prospective contractor. Such notice shall:
(b) Effect of Decision. A contractor or prospective contractor is suspended upon issuance of the notice of suspension; the suspension shall remain in effect during any appeals. R-24-109-105-02 Debarment (a) Initiation. Following completion of the investigation to determine whether a contractor or prospective contractor has engaged in activities which are a cause for debarment, and after consultation with the affected using agencies and 'Attorney General, the Director may debar a contractor or prospective contractor. A written notice of debarment shall be sent by certified mail, return receipt requested. The notice shall inform the debarred person of his or her right to appeal the decision administratively or judicially in accordance with Article 109 (Remedies) of the Colorado Procurement Code.
(b) Effect of Debarment Decision. A debarment decision will take effect 30 days after the contractor or prospective contractor receives notice of the decision unless an appeal is filed during that time. After the debarment decision takes effect, the person shall remain debarred unless a court, the Executive Director, or the person who issued the debarment decision orders otherwise or until the debarment period specified in the decision expires. A debarment may be for a specific purchasing agency or may apply to all agencies.
(c) Lists of Debarred and Suspended Persons. The Director shall maintain a current list of all debarred and suspended persons and shall send such lists and updates of it to heads of all purchasing agencies.
R-24-109-106 Resolution of Contract and Breach of Contract Controversies - Applicability - Authority.
R-24-109-106-01 Statement of Policy The Colorado Procurement Code establishes procedures and remedies to resolve contract and breach of contract controversies between the state and a contractor. It is the state's policy to try to resolve all controversies by mutual agreement through informal discussions without litigation. As used in these rules, the word “controversy” is meant to be broad and all- encompassing, including the full spectrum of disagreements from pricing of routine contract changes to claims of breach of contract. R-24-109-106-02 Decision.
(a) Procurement Prior to Issuing Decisions. When a controversy cannot be resolved by mutual agreement, the Director or head of a purchasing agency shall, within 20 working days after receiving a written request by the contractor for a final decision, issue a written decision. Before issuing a final decision, the Director or head of a purchasing agency shall review the facts pertinent to the controversy and secure any necessary assistance from legal, fiscal, and other advisers.
(b) Final Decision. The Director or head of a purchasing agency shall immediately furnish a copy of the decision to the contractor by certified mail, return receipt requested. The decision shall include:
(c) Payments of Amounts Found Due. The amount and interest on the amount determined payable pursuant to the decision, less any portion already paid, normally should be paid without awaiting contractor action concerning appeal. Such payment shall be without prejudice to the rights of either party. If, on appeal, such payments are required to be returned, interest shall be paid from the date of payment.
PART 2 APPEALS R-24-109-201 Appeal to the Executive Director.
(See Statute)
R-24-109-202 Rules Of Procedure.
(See Statute)
R-24-109-202-01 Filing of Appeals.
(a) When to file. Appeals of decisions of the Director or head of a purchasing agency shall be submitted in writing to the Executive Director within ten (10) working days of the date a decision is mailed or within twenty (20) working days of a decision regarding a suspension, debarment, or contract controversy. Appeals received after the prescribed time periods shall not be considered. (See CRS 24-109-203.)
(b) Form. The written appeal shall include copies of all documents and evidence previously submitted to the Director or head of a purchasing agency, any additional relevant information, and the decision rendered by the Director or head of a purchasing agency.
(c) Content. The appeal shall be limited to the issues raised in the original protest. However, the appeal may include new evidence or additional information related to those issues or issues related to the conduct of the protest process.
R-24-109-202-02 Additional Information The Executive Director may request that the parties submit any additional information necessary to make a decision on the appeal. If any party fails to submit requested information within the time period set by the Executive Director, the appeal may be considered without such information. R-24-109-202-03 Hearing by the Executive Director (a) Request for Hearing. A contractor or prospective contractor bringing an appeal may request in writing that the Executive Director conduct a hearing on the appeal..
(b) Notice of Hearing. If a hearing is requested, the Executive Director, or his designee, shall send a written notice of the time and place of the hearing to all parties and the Attorney General. Such notice shall be sent by certified mail, return receipt requested.
(c) Hearing Procedures. Hearings shall be as informal as possible under the circumstances. The weight to be attached to any evidence presented shall be within the discretion of the Executive Director or his designee. Stipulations of fact agreed upon by the parties may be used as evidence at the hearing. The Executive Director, or his designee, may request evidence in addition to that presented by the parties. A hearing may be recorded but need not be transcribed except at the request and expense of the contractor or prospective contractor. A record of those present, identification of any written evidence presented, copies of all written statements, and a summary of the hearing shall be sufficient record. The Executive Director or his designee may:
R-24-109-203 Time Limitation for Appeals.
(See Statute)
R-24-109-204 Decision by the Executive Director.
The Executive Director, or his designee, shall issue a final decision on the issue. Copies of the decision shall inform the contractor or prospective contractor of his or her rights to judicial appeals under Article 109 (Remedies) of the Colorado Procurement Code. However, if an action concerning the protest, suspension, debarment, or contract controversy has been commenced in court, the Executive Director shall not act on the matter, but shall refer it to the Attorney General. R-24-109-205 Appeals to District Court.
(See Statute)
R-24-109-206 Time Limitations on Appeals to the District Court. (See Statute)
PART 3 INTEREST (See Statute)
PART 4 SOLICITATIONS AND AWARDS IN VIOLATION OF THE LAW R-24-109-401 Applicability This Rule addresses only requirements of procurement law. Any other violations of law or rule are not considered in this review process.
R-24-109-401-01 Definitions.
(a) An “unauthorized purchase” is any situation where a purchase has occurred or a purchase commitment has been made to a vendor to obtain goods or services, and:
(b) “Ratification” is the act of the using agency's purchasing director, after review of all facts involved in an unauthorized purchase, sanctioning the unauthorized purchase.
(c) “Responsible individual(s)” is the person(s) who has made an unauthorized purchase. R-24-109-402 Remedies Prior to an Award.
(See Statute)
R-24-109-403 Remedies After an Award.
(See Statute)
R-24-109-404 Liability of Public Employees.
R-24-109-404-01 Authority of the Director or Head of a Purchasing Agency. The director or head of a purchasing agency is authorized, after review and consideration of all facts involved in an unauthorized purchase, to decide whether to ratify an unauthorized purchase. R-24-109-404-02 Factors to be Considered in Ratification of an Unauthorized Purchase.
(a) The director or head of a purchasing agency, or their designee, shall consider all factors related to the procurement including, but not limited to, the following in making a decision whether or not to ratify an unauthorized purchase:
(b) A decision to ratify an unauthorized purchase shall weigh the above noted factors as they apply to the express goals of State Procurement Code, CRS 24-101-102, and in particular fairness to any vendor who has acted fairly and in good faith.
R-24-109-404-03 Purchasing Agency Actions - Authorized Ratification.
(a) After consideration of the above factors, the state purchasing director or head of a purchasing agency may take one of the following actions:
(b) When ratification is denied pursuant to (a)(ii) or (a)(iii) of this subsection 04 above, a purchase order shall not be issued except in cases where it is necessary to effect payment and the purchase order shall so indicate.
(c) If during the review process, it is determined that:
R-24-109-404-04 Purchasing Agency Actions - In the Event of Denial.
(a) In the event the director or head of a purchasing agency refuses to ratify the unauthorized procurement, the following actions shall occur:
(b) In the event a court action is started involving a procurement that is undergoing a ratification review, the ratification process shall cease and be referred to the Attorney General. R-24-109-404-05 Written Determination.
A written determination setting forth the basis for the decision shall be made and included in the procurement record.
ARTICLE 110 INTERGOVERNMENTAL RELATIONS PART 1 DEFINITIONS (See Statute)
PART 2 COOPERATIVE PURCHASING R-24-110-201-01 Cooperative Purchasing The Executive Director or his designee may approve the purchase of goods or services in accordance with §24-110-201(2) CRS if he finds that such purchase is in the best interests of the state, after considering: (1) The interests of Colorado vendors and vendors registered with the BIDS system; (2) the competitiveness of pricing under the contract; (3) the efficiencies and cost savings of using the contract, beyond the savings and administrative convenience achieved from not having to comply with Article 103 of the Procurement Code; and (4) the purposes of the Procurement Code, as set forth in §24-101-102 CRS.
(a) The head of a purchasing agency shall make the request through the State Purchasing Director, addressing the considerations set forth above.
(b) The Executive Director or his designee may approve a single purchase, make a conditional approval, or approve participation in an on-going program with the external procurement activity or the local public procurement unit. Participation in an on-going program must be for a specific period of time, not to exceed two years.
PART 3 CONTRACT CONTROVERSIES (See Statute)
ARTICLE 111 PREFERENCES IN AWARDING CONTRACTS - FEDERAL ASSISTANCE REQUIREMENTS R-24-111-101 Exemptions for Prescribed Methods of Source Selection. (See Statute)
R-24-111-102 Priorities Among Preferences.
(See Statute)
R-24-111-102-01 Minority-owned and Women-owned Business Enterprises It is the policy of this State that all procurement offices shall make a special effort to solicit and encourage minority-owned and women- owned business participation for state contracts and awards. All state procurement offices are mandated to implement the spirit and direction offered by present or future executive orders relating to this subject. Agencies and institutions are encouraged, to the greatest extent possible without sacrificing adequate competition, to ensure active participation by minority-owned and women-owned business enterprises.
R-24-111-102-02 Preferences (a) No provision is made in this Code for preferences or set asides for minority-owned or women-owned businesses, (c) In the event tie low bids are received in response to solicitations for bids for commodities, pursuant to §24-103-202 CRS, preference is given to the resident bidder, pursuant to §§24-103-202.5 and 8-18-101 CRS.
ARTICLE 112 EFFECTIVE DATE - APPLICABILITY R-24-112-101-01 Effective Date Rules implementing the Colorado Procurement Law, SB-130, Title 24, shall become effective January 1, 1982. All contracts solicited or entered into after January 1, 1982, shall be in accordance to Title 24, and enacted rules implementing that Title.
COLORADO PROCUREMENT RULES Appendix A : General Conditions of the Contract The construction contract clauses required by § 24-105-301 CRS are set forth in the General Conditions of the Contract as Articles 35 General, Article 35A, Article 35B, Article 37, Article 38, Article 46, Article 48B,Article 49, and Article 50. The entire text of the General Conditions of the Contract is included in this Appendix A for the reader's convenience; however, only these articles are regulatory. All other provisions of the General Conditions of the Contract are subject to revision without rulemaking. ARTICLE 1. DEFINITIONS A. CONTRACT DOCUMENTS The Contract Documents consist of:
B. PROCEDURAL DOCUMENTS The Procedural Documents used in the administration and performance of the Agreement consist of:
C. DEFINITIONS OF WORDS AND TERMS USED 1. AGREEMENT. The term “Agreement” shall mean the written agreement entered into by the State of Colorado acting by and through the Principal Representative and the Contractor for the performance of the Work and payment therefore, on State Form SC-6.21. The term Agreement when used without reference to State Form SC-6.21 may also refer to the entirety of the parties' agreement to perform the Work described in the Contract Documents or reasonably inferable there from. The term “Contract” shall be interchangeable with this latter meaning of the term Agreement 2. ARCHITECT/ENGINEER. The term “Architect/Engineer” shall mean either the architect of record or the engineer of record under contract to the State of Colorado for the Project identified in the Contract Documents.
3. BENEFICIAL OCCUPANCY. The term “Beneficial Occupancy” means occupancy taken by the State as Owner prior to the Date of Substantial Completion at a time when a building or other discrete physical portion of the Project is used for the purpose intended. The Date of Beneficial Occupancy shall be the date of such first use, but shall not be prior to the date of execution of the Notice of Approval of Beneficial Occupancy. Prior to the date of execution of a Notice of Approval of Beneficial Occupancy the State shall have no right to occupy and the project may not be considered safe for occupancy for the intended use.
4. CHANGE ORDER. The term “Change Order” means a written order, signed by a Procurement Officer, directing the Contractor to make changes in the Work, in accordance with Article 35A, The Value Of Changed Work.
5. COLORADO LABOR. The term “Colorado labor” shall be defined, as provided in § 8-17-101, C.R.S., as any person who is a resident of the state of Colorado, at the time of employment, without discrimination as to race, color, creed, sex, age, or religion except when sex or age is a bona fide occupational qualification, or shall have such other meaning as the term may otherwise be given in § 8-17-101, C.R.S., as amended.
6. CONTRACTOR. The word “Contractor” shall mean the person, company, firm, corporation or other legal entity entering into a contract with the State of Colorado acting by and through the Principal Representative 7. DAYS. The term “days” whether singular or plural shall mean calendar days unless expressly stated otherwise. Where the term “business days” is used it shall mean business days of the State of Colorado.
8. DRAWINGS. The term “Drawings” shall mean all drawings approved by appropriate State officials which have been prepared by the Architect/Engineer showing the work to be done, except that where a list of drawings is specifically enumerated in the Supplementary General Conditions or division 1 of the Specifications, the term shall mean the drawings so enumerated, including all addenda drawings.
9. EMERGENCY FIELD CHANGE ORDER. The term “Emergency Field Change Order” shall mean a written change order for extra work or a change in the work necessitated by an emergency as defined in Article 35C executed on State form SC 6.31 and identified as an Emergency Field Change Order. The use of such orders is limited to emergencies and to the amounts shown in Article 35C.
10. FINAL ACCEPTANCE. The terms “final acceptance” or “finally complete” mean the stage in the progress of the work, after substantial completion, when all remaining items of work have been completed, all requirements of the Contract Documents are satisfied and the Notice of Acceptance can be issued. Discrete physical portions of the Project may be separately and partially deemed finally complete at the discretion of the Principal Representative when that portion of the Project reaches such stage of completion and a partial Notice of Acceptance can be issued.
11. NOTICE. The term “Notice” shall mean any communication in writing from either contracting party to the other by such means of delivery that receipt cannot properly be denied. Notice shall be provided to the person identified to receive it in Article 54E, Notice Identification, or to such other person as either party identifies in writing to receive Notice. Notice by facsimile transmission where proper transmission is evidence shall be adequate where facsimile numbers are included in Article 54E. Notwithstanding an email delivery or return receipt, email Notice shall not be adequate. Acknowledgment of receipt of a voice message shall not be deemed to waive the requirement that Notice, where required, shall be in writing.
12. OWNER. The term “Owner” shall mean the Principal Representative.
13. PRINCIPAL REPRESENTATIVE. The term “Principal Representative” shall be defined, as provided in § 24-30-1301(11), C.R.S., as the governing board of a state department, institution, or agency; or if there is no governing board, then the executive head of a state department, institution, or agency, as designated by the governor or the general assembly and as specifically identified in the Contract Documents, or shall have such other meaning as the term may otherwise be given in § 24-30-1301(11), C.R.S., as amended. The Principal Representative may delegate authority. The Contractor shall have the right to inquire regarding the delegated authority of any of the Principal Representative's representatives on the project and shall be provided with a response in writing when requested.
14. PROCUREMENT OFFICER. The term “Procurement Officer” means any person duly authorized to enter into and administer contracts and make written determinations with respect thereto. “Procurement Officer” includes an authorized representative of the Principal Representative acting within the limits of his or her authority.
15. PRODUCT DATA. The term “Product Data” shall mean all submittals in the form of printed manufacturer's literature, manufacturer's specifications, and catalog cuts.
16. REASONABLY INFERABLE: The phrase “reasonably inferable” means that if an item or system is either shown or specified, all material and equipment normally furnished with such items or systems and needed to make a complete installation shall be provided whether mentioned or not, omitting only such parts as are specifically excepted, and shall include only components which the Contractor could reasonably anticipate based on his or her skill and knowledge using an objective, industry standard, not a subjective standard. This term takes into consideration the normal understanding that not every detail is to be given on the Drawings and Specifications. The phrase shall not, however, be construed to make the Contractor, rather than the Architect/Engineer, responsible for producing the Drawings and Specifications 17. SAMPLES. The term “Samples” shall mean examples of materials or work provided to establish the standard by which the Work will be judged.
18. SC. The term “SC” means “State Contract” which is used in connection with labeling applicable State form documents (e.g. “SC 6.23” is the State form number for these General Conditions of the Contract).
19. SBP. The term “SBP” means “State Buildings”, which is used in connection with labeling applicable State form documents (e.g., “SBP-01” is the form number for Notice of Approval of Beneficial Occupancy).
20. SHOP DRAWINGS. The term “Shop Drawings” shall mean any and all detailed drawings prepared and submitted by Contractor, Subcontractor at any tier, vendors or manufacturers providing the products and equipment specified on the Drawings or called for in the Specifications.
21. SPECIFICATIONS. The term “Specifications” shall mean the requirements of divisions 1 through 17 of the project manual prepared by the Architect/Engineer describing the work to be accomplished.
22. STATE BUILDINGS PROGRAMS. The term “State Buildings Programs” is the shortened name of the division of State Buildings and Real Estate Programs. It shall refer to the division of the executive department of State government responsible for project administration, review, approval and coordination of plans, construction procurement policy, contractual procedures, and code compliance and inspection of all buildings, public works and improvements erected for state purposes; except public roads and highways and projects under the supervision of the division of wildlife and the division of parks and outdoor recreation as provided in § 24-30-1301, et seq, C.R.S. The term State Buildings Programs shall also mean that individual within a State Department agency or institution, including institutions of higher education, who has signed an agreement accepting delegation to perform all or part of the responsibilities and functions of State Buildings Programs.
23. SUBCONTRACTOR. The term “Subcontractor” shall mean a person, company, firm, corporation or other legal entity supplying labor and materials on site, or only labor, for Project work under separate contract or agreement with the Contractor. The term “Subcontractor at any tier” shall mean all Subcontractors, and shall include subcontractors to Subcontractors, as well as subcontractors to such subcontractors, supplying labor and materials on site, or only labor, for Project work for, and under separate contract or agreement with, a Subcontractor or other subcontractor.
24. SUBMITTALS. The term “submittals” means drawings, lists, tables, documents and samples prepared by the Contractor to facilitate the progress of the work as required by these General Conditions or the Drawings and Specifications. They consist of Shop Drawings, Product Data, Samples, and various administrative support documents including but not limited to lists of subcontractors, construction progress schedules, schedules of values, applications for payment, inspection and test results, requests for information, various document logs, and as-built drawings. Submittals are required by the Contract Documents, but except to the extent expressly specified otherwise are not themselves a part of the Contract Documents.
25. SUBSTANTIAL COMPLETION. The terms “substantial completion” or “substantially complete” mean the stage in the progress of the work when the construction is sufficiently complete, in accordance with the Contract Documents as modified by any Change Order s, so that the Work, or at the discretion of the Principal Representative, any designated portion thereof, is available for its intended use by the Principal Representative and a Notice of Substantial Completion can be issued. Portions of the Project may, at the discretion of the Principal Representative, be designated as substantially complete.
26. SURETY. The term “Surety” shall mean the company providing the labor and material payment and performance bonds for the Contractor as obligor.
27. WORK. The term “Work” shall mean all or part of the labor, materials, equipment, and other services required by the Contract Documents or otherwise required to be provided by the Contractor to meet the Contractor's obligations under the Contract.
ARTICLE 2. EXECUTION, CORRELATION, INTENT OF DOCUMENTS, COMMUNICATION AND COOPERATION A. EXECUTION The Contractor, within ten (10) days from the date of Notice of Award, will be required to:
B. CORRELATION By execution of the Agreement the Contractor represents that the Contractor has visited the site, has become familiar with local conditions and local requirements under which the Work is to be performed, including the building code programs of the State Buildings Program as implemented by the Principal Representative, and has correlated personal observations with the requirements of the Contract Documents.
C. INTENT OF DOCUMENTS The Contract Documents are complementary, and what is called for by any one document shall be as binding as if called for by all. The intention of the documents is to include all labor, materials, equipment and transportation necessary for the proper execution of the Work. Words describing materials or work which have a well-known technical or trade meaning shall be held to refer to such recognized standards. In any event, if any error exists, or appears to exist, in the requirements of the Drawings or Specifications, or if any disagreement exists as to such requirements, the Contractor shall have the same explained or adjusted by the Architect/Engineer before proceeding with the work in question. In the event of the Contractor's failure to give prior written Notice of any such errors or disagreements of which the Contractor or the Subcontractors at any tier are aware, the Contractor shall, at no additional cost to the Principal Representative, make good any damage to, or defect in, work which is caused by such omission.
Where a conflict occurs between or within standards, Specifications or Drawings, which is not resolved by reference to the precedence between the Contract Documents, the more stringent or higher quality requirements shall apply so long as such more stringent or higher quality requirements are reasonably inferable. The Architect/Engineer shall decide which requirements will provide the best installation. With the exception noted in the following paragraph, the precedence of the Contract Documents is in the following sequence:
Notwithstanding the foregoing order of precedence, the Special Provisions of Article 52 of the General Conditions, Special Provisions, shall take precedence, rule and control over all other provisions of the Contract Documents.
Unless the context otherwise requires, form numbers in this document are for convenience only. In the event of any conflict between the form required by name or context and the form required by number, the form required by name or context shall control. The Contractor may obtain State forms from the Principal Representative upon request.
D. PARTNERING, COMMUNICATIONS AND COOPERATION In recognition of the fact that conflicts, disagreements and disputes often arise during the performance of construction contracts, the Contractor and the Principal Representative aspire to encourage a relationship of open communication and cooperation between the employees and personnel of both, in which the objectives of the Contract may be better achieved and issues resolved in a more fully informed atmosphere.
The Contractor and the Principal Representative each agree to assign an individual who shall be fully authorized to negotiate and implement a voluntary partnering plan for the purpose of facilitating open communications between them. Within thirty days (30) of the Notice to Proceed, the assigned individuals shall meet to discuss development of an informal agreement to accomplish these goals. The assigned individuals shall endeavor to reach an informal agreement, but shall have no such obligation. Any plans these parties voluntarily agree to implement shall result in no change to the contract amount, and no costs associated with such plan or its development shall be recoverable under any contract clause. In addition, no plan developed to facilitate open communication and cooperation shall alter, amend or waive any of the rights or duties of either party under the Contract unless and except by written Amendment to the Contract, nor shall anything in this clause or any subsequently developed partnering plan be deemed to create fiduciary duties between the parties unless expressly agreed in a written Amendment to the Contract. It is also recognized that projects with relatively low contract values may not justify the expense or special efforts required. In the case of small projects with an initial Contract value under $500,000, the requirements of the preceding paragraph shall not apply. ARTICLE 3. COPIES FURNISHED The Contractor will be furnished, free of charge, the number of copies of Drawings and Specifications as specified in the Contract Documents, or if no number is specified, all copies reasonably necessary for the execution of the work.
ARTICLE 4. OWNERSHIP OF DRAWINGS Drawings or Specifications, or copies of either, furnished by the Architect/Engineer, are not to be used on any other work. At the completion of the Work, at the written request of the Architect/Engineer, the Contractor shall endeavor to return all Drawings and Specifications. The Contractor may retain the Contractor's Contract Document set, copies of Drawings and Specifications used to contract with others for any portion of the Work and a marked up set of as-built drawings.
ARTICLE 5. ARCHITECT/ENGINEER'S STATUS The Architect/Engineer is the representative of the Principal Representative for purposes of administration of the Contract, as provided in the Contract Documents and the Agreement. In case of termination of employment or the death of the Architect/Engineer, the Principal Representative will appoint a capable Architect/Engineer against whom the Contractor makes no reasonable objection, whose status under the Contract shall be the same as that of the former Architect/Engineer. ARTICLE 6. ARCHITECT/ENGINEER DECISIONS AND JUDGMENTS, ACCESS TO WORK AND INSPECTION A. DECISIONS The Architect/Engineer shall, within a reasonable time, make decisions on all matters relating to the execution and progress of the Work or the interpretation of the Contract Documents, and in the exercise of due diligence shall be reasonably available to the Contractor to timely interpret and make decisions with respect to questions relating to the design or concerning the Contract Documents.
B. JUDGMENTS The Architect/Engineer is, in the first instance, the judge of the performance required by the Contract Documents as it relates to compliance with the Drawings and Specifications and quality of workmanship and materials.
The Architect/Engineer shall make judgments regarding whether directed work is extra or outside the scope of Work required by the Contract Documents at the time such direction is first given. If, in the Contractor's judgment, any performance directed by the Architect/Engineer is not required by the Contract Documents or if the Architect/Engineer does not make the judgment required, it shall be a condition precedent to the filing of any claim for additional cost related to such directed work that the Contractor, before performing such work, shall first obtain in writing, the Architect/Engineer's written decision that such directed work is included in the performance required by the Contract Documents. If the Architect/Engineer's direction to perform the work does not state that the work is within the performance required by the Contract Documents, the Contractor shall, in writing, request the Architect/Engineer to advise in writing whether the directed work will be considered extra work or work included in the performance required by the Contract Documents.
The Architect/Engineer shall respond to any such written request for such a decision within three (3) business days and if no response is provided, or if the Architect/Engineer's written decision is to the effect that the work is included in the performance required by the Contract Documents, the Contractor may file with the Principal Representative and the Architect/Engineer a Notice of claim in accordance with Article 36, Claims. Whether or not a Notice of claim is filed, the Contractor shall proceed with the ordered work. Disagreement with the decision of the Architect/Engineer shall not be grounds for the Contractor to refuse to perform the work directed or to suspend or terminate performance.
C. ACCESS TO WORK The Architect/Engineer, the Principal Representative and representatives of State Buildings Programs shall at all times have access to the work. The Contractor shall provide proper facilities for such access and for their observations or inspection of the work.
D. INSPECTION The Architect/Engineer has agreed to make, or that structural, mechanical, electrical engineers or other consultants will make, periodic visits to the site to generally observe the progress and quality of the Work to determine in general if the Work is proceeding in accordance with the Contract Documents. Observation may extend to all or any part of the Work and to the preparation, fabrication or manufacture of materials.
Without in any way meaning to be exclusive or to limit the responsibilities of the Architect/Engineer or the Contractor, the Architect/Engineer has agreed to observe, among other aspects of the Work, the following for compliance with the Contract Documents:
If the Specifications, the Architect/Engineer's instructions, laws, ordinances of any public authority require any work to be specifically tested or approved, the Contractor shall give the Architect/Engineer timely notice of its readiness for observation by the Architect/Engineer or inspection by another authority, and if the inspection is by another authority, of the date fixed for such inspection, required certificates of inspection being secured by the Contractor. The Contractor shall give all required Notices to the Principal Representative or his or her designee for inspections required for the building inspection program. It shall be the responsibility of the Contractor to determine the Notice required by the State pursuant to Building Inspection Record for the Project, according to State form SBP-B.I.R., or the equivalent form required by the Principal Representative as approved by the State Buildings Program. If any such work is covered up without approval or consent of the Architect/Engineer or prior to any building code inspection, it must, if required by the Architect/Engineer, the Principal Representative or the State Buildings Programs, be uncovered for examination, at the Contractor's expense. If such work is found to be not in accordance with the Contract Documents, the Contractor shall pay such costs, unless he or she shall show that the defect in the work was caused by another contractor engaged by the Principal Representative. In that event, the Principal Representative shall pay such cost. In addition, examination of questioned work may be ordered, and if so ordered, the work must be uncovered by the Contractor. If such work be found in accordance with the Contract Documents, the Contractor shall be reimbursed the cost of examination and replacement.
ARTICLE 7. CONTRACTOR'S SUPERINTENDENCE AND SUPERVISION The Contractor shall employ, and keep present on the Project during its progress, a competent superintendent and any necessary assistants, all satisfactory to the Architect/Engineer and the Principal Representative. The superintendent shall not be changed except with the consent of the Architect/Engineer and the Principal Representative, unless the superintendent proves to be unsatisfactory to the Contractor and ceases to be in his or her employ. The superintendent shall represent the Contractor in his or her absence and all directions given to the superintendent shall be as binding as if given to the Contractor. Directions received by the superintendent shall be documented by the superintendent and confirmed in writing with the Contractor. The Contractor shall give efficient supervision to the Work, using his or her best skill and attention. He or she shall carefully study and compare all Drawings, Specifications and other written instructions and shall without delay report any error, inconsistency or omission which he or she may discover in writing to the Architect/Engineer. The Contractor shall not be liable to the Principal Representative for damage to the extent it results from errors or deficiencies in the Contract Documents or other instructions by the Architect/Engineer, unless the Contractor knew or had reason to know, that damage would result by proceeding and the Contractor fails to so advise the Architect/Engineer. The superintendent shall see that the Work is carried out in accordance with the Contract Documents and in a uniform, thorough and first-class manner in every respect. The Contractor's superintendent shall establish all lines, levels, and marks necessary to facilitate the operations of all concerned in the Contractor's Work. The Contractor shall lay out all work in a manner satisfactory to the Architect/Engineer, making permanent records of all lines and levels required for excavation, grading, foundations, and for all other parts of the Work.
ARTICLE 8. MATERIALS AND EMPLOYEES Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities necessary for the execution and completion of the Work.
Unless otherwise specified, all materials shall be new and both workmanship and materials shall be first class and of uniform quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials.
The Contractor is fully responsible for all acts and omissions of the Contractor's employees and shall at all times enforce strict discipline and good order among employees on the site. The Contractor shall not employ on the Work any person reasonably deemed unfit by the Principal Representative or anyone not skilled in the work assigned to him.
ARTICLE 9. SURVEYS, PERMITS, LAWS, TAXES AND REGULATIONS A. SURVEYS The Principal Representative shall furnish all surveys, property lines and bench marks deemed necessary by the Architect/Engineer, unless otherwise specified.
B. PERMITS AND LICENSES Permits and licenses necessary for the prosecution of the Work shall be secured and paid for by the Contractor. Unless otherwise specified in the Specifications, no local municipal or county building permit shall be required. However, State Buildings Programs requires each Principal Representative to administer a building code inspection program, the implementation of which may vary at each agency or institution of the State. The Contractors' employees shall become personally familiar with these local conditions and requirements and shall fully comply with such requirements. State electrical and plumbing permits are required, unless the requirement to obtain such permits is altered by State Building's Programs. The Contractor shall obtain and pay for such permits. Easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Principal Representative, unless otherwise specified.
C. TAXES 1. REFUND OF SALES AND USE TAXES The Contractor shall pay all local taxes required to be paid, including but not necessarily limited to all sales and use taxes. If requested by the Principal Representative prior to issuance of the Notice to Proceed or directed in the Supplementary General Conditions or the Specifications, the Contractor shall maintain records of such payments in respect to the Work, which shall be separate and distinct from all other records maintained by the Contractor, and the Contractor shall furnish such data as may be necessary to enable the State of Colorado, acting by and through the Principal Representative, to obtain any refunds of such taxes which may be available under the laws, ordinances, rules or regulations applicable to such taxes. When so requested or directed, the Contractor shall require Subcontractors at all tiers to pay all local sales and use taxes required to be paid and to maintain records and furnish the Contractor with such data as may be necessary to obtain refunds of the taxes paid by such Subcontractors. No State sales and use taxes are to be paid on material to be used in this Project. On application by the purchaser or seller, the Department of Revenue shall issue to a Contractor or to a Subcontractor at any tier, a certificate or certificates of exemption per § 39-26114(1)(d), C.R.S., and § 39-26-203, C.R.S.
D. LAWS AND REGULATIONS The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as drawn or specified. If the Contractor observes that the Drawings or Specifications require work which is at variance therewith, the Contractor shall without delay notify the Architect/Engineer in writing and any necessary changes shall be adjusted as provided in Article 35, Changes In The Work.
The Contractor shall bear all costs arising from the performance of work required by the Drawings or Specifications that the Contractor knows to be contrary to such laws, ordinances, rules or regulations, if such work is performed without giving Notice to the Architect/Engineer. ARTICLE 10. PROTECTION OF WORK AND PROPERTY A. GENERAL PROVISIONS The Contractor shall continuously maintain adequate protection of all work and materials, protect the property from injury or loss arising in connection with this Contract and adequately protect adjacent property as provided by law and the Contract Documents. The Contractor shall make good any damage, injury or loss, except to the extent:
B. SAFETY PRECAUTIONS The Contractor shall take all necessary precautions for the safety of employees on the Project, and shall comply with all applicable provisions of federal, State and municipal safety laws and building codes to prevent accidents or injury to persons on, about or adjacent to the premises where the Work is being performed. He or she shall erect and properly maintain at all times, as required by the conditions and progress of the Work, all necessary safeguards for the protection of workers and the public and shall post danger signs warning against the hazards created by such features of construction as protruding nails, hoists, well holes, elevator hatchways, scaffolding, window openings, stairways and falling materials; and he or she shall designate a responsible member of his or her organization on the Project, whose duty shall be the prevention of accidents. The name and position of any person so designated shall be reported to the Architect/Engineer by the Contractor.
The Contractor shall provide all necessary bracing, shoring and tying of all structures, decks and framing to prevent any structural failure of any material which could result in damage to property or the injury or death of persons; take all precautions to insure that no part of any structure of any description is loaded beyond its carrying capacity with anything that will endanger its safety at any time during the execution of this Contract; and provide for the adequacy and safety of all scaffolding and hoisting equipment. The Contractor shall not permit open fires within the building enclosure. The Contractor shall construct and maintain all necessary temporary drainage and do all pumping necessary to keep excavations and floors, pits and trenches free of water. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work, except as otherwise noted.
The Contractor shall take due precautions when obstructing sidewalks, streets or other public ways in any manner, and shall provide, erect and maintain barricades, temporary walkways, roadways, trench covers, colored lights or danger signals and any other devices necessary or required to assure the safe passage of pedestrians and automobiles.
C. EMERGENCIES In an emergency affecting the safety of life or of the Work or of adjoining property, the Contractor without special instruction or authorization from the Architect/Engineer or Principal Representative, is hereby permitted to act, at his or her discretion, to prevent such threatened loss or injury; and he or she shall so act, without appeal, if so authorized or instructed. Provided the Contractor has no responsibilities for the emergency, if the Contractor incurs additional cost not otherwise recoverable from insurance or others on account of any such emergency work, the Contract sum shall be equitably adjusted in accordance with Article 35, Changes In The Work.
ARTICLE 11. DRAWINGS AND SPECIFICATIONS ON THE WORK The Contractor shall keep on the job site one copy of the Contract Documents in good order, including current copies of all Drawings and Specifications for the Work, and any approved Shop Drawings, Product Data or Samples, and as-built drawings. As-built drawings shall be updated weekly by the Contractor and Subcontractors to reflect actual constructed conditions including dimensioned locations of underground work and the Contractor's failure to maintain such updates may be grounds to withhold portions of payments otherwise due in accordance with Article 33, Payments Withheld. All such documents shall be available to the Architect/Engineer and representatives of the State. In addition, the Contractor shall keep on the job site one copy of all approved addenda, Change Order s and requests for information issued for the Work.
The Contractor shall develop procedures to insure the currency and accuracy of as-built drawings and shall maintain on a current basis a log of requests for information and responses thereto, a Shop Drawing and Product Data submittal log, and a Sample submittal log to record the status of all necessary and required submittals.
ARTICLE 12. REQUESTS FOR INFORMATION AND SCHEDULES A. REQUESTS FOR INFORMATION The Architect/Engineer shall furnish additional instructions with reasonable promptness, by means of drawings or otherwise, necessary for the proper execution of the Work. All such drawings and instructions shall be consistent with the Contract Documents and reasonably inferable there from. The Architect/Engineer shall determine what additional instructions or drawings are necessary for the proper execution of the Work.
The Work shall be executed in conformity with such instructions and the Contractor shall do no work without proper drawings, specifications or instructions. If the Contractor believes additional instructions, specifications or drawings are needed for the performance of any portion of the Work, the Contractor shall give Notice of such need in writing through a request for information furnished to the Architect/Engineer sufficiently in advance of the need for such additional instructions, specifications or drawings to avoid delay and to allow the Architect/Engineer a reasonable time to respond. The Contractor shall maintain a log of the requests for information and the responses provided.
B. SCHEDULES 1. SUBMITTAL SCHEDULES Prior to filing the Contractor's first application for payment, a schedule shall be prepared which may be preliminary to the extent required, fixing the dates for the submission and initial review of required Shop Drawings, Product Data and Samples for the beginning of manufacture and installation of materials, and for the completion of the various parts of the Work. It shall be prepared so as to cause no delay in the Work or in the work of any other contractor. The schedule shall be subject to change from time to time in accordance with the progress of the Work, and it shall be subject to the review and approval by the Architect/Engineer. It shall fix the dates at which the various Shop Drawings Product Data and Samples will be required from the Architect/Engineer. The Architect/Engineer, after review and agreement as to the time provided for initial review, shall review and comment on the Shop Drawings, Product Data and Samples in accordance with that schedule. The schedule shall be finalized, prepared and submitted with respect to each of the elements of the Work in time to avoid delay, considering reasonable periods for review, manufacture or installation.
2. SCHEDULE OF VALUES Within twenty-one (21) calendar days after the date of the Notice to Proceed, the Contractor shall submit to the Architect/Engineer and Principal Representative, for approval, and to the State Buildings Programs when specifically requested, a complete itemized schedule of the values of the various parts of the Work, as estimated by the Contractor, aggregating the total price. The schedule of values shall be in such detail as the Architect/Engineer or the Principal Representative shall require, prepared on forms acceptable to the Principal Representative. It shall, at a minimum, identify on a separate line each division of the Specifications including the general conditions costs to be charged to the Project. The Contractor shall revise and resubmit the schedule of values for approval when, in the opinion of the Architect/Engineer or the Principal Representative, such resubmittal is required due to changes or modifications to the Contract Documents or the Contract sum.
This schedule of values, when approved, will be used in preparing Contractor's applications for payment on State Form SC-7.2, Application for Payment.
3. CONSTRUCTION SCHEDULES Within twenty-one (21) calendar days after the date of the Notice to Proceed, the Contractor shall submit to the Architect/Engineer and the Principal Representative, and to the State Buildings Programs when specifically requested, on a form acceptable to them, an overall timetable of the construction schedule for the Project. Unless the Supplementary General Conditions or the Specifications allow scheduling with bar charts or other less sophisticated scheduling tools, the Contractor's schedule shall be a critical-path method (CPM) construction schedule. The CPM schedule shall start with the date of the Notice to Proceed and include submittals activities, the various construction activities, change order work (when applicable), close-out, testing, demonstration of equipment operation when called for in the Specifications, and acceptance. The CPM shall at a minimum correlate to the schedule of values line items and shall be cost loaded if requested by the Architect/Engineer or Principal Representative. The completion time shall be the time specified in the Agreement and all Project scheduling shall allocate float utilizing the full period available for construction as specified in the Agreement on State Form SC 6.13, without indication of early completion, unless such earlier completion is approved in writing by the Principal Representative and State Building Programs.
When the testing of materials is required by the Specifications, the Contractor shall also prepare and submit to the Architect/Engineer and the Principal Representative a schedule for testing in accordance with Article 14, Samples and Testing.
ARTICLE 13. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES A. SUBMITTAL PROCESS The Contractor shall check and field verify all dimensions. The Contractor shall check, approve and submit to the Architect/Engineer in accordance with the schedule described inArticle 12, Requests for Information and Schedules, all Shop Drawings, Product Data and Samples required by the specifications or required by the Contractor for the work of the various trades. All Drawings and Product Data shall contain identifying nomenclature and each submittal shall be accompanied by a letter of transmittal identifying in detail all enclosures. The number of copies of Shop Drawings and Product Data to be submitted shall be as specified in the Specifications and if no number is specified then three copies shall be submitted.
The Architect/Engineer shall review and comment on the Shop Drawings and Product Data within the time provided in the agreed upon schedule for conformance with information given and the design concept expressed in, or reasonably inferred from, the Contract Documents. The nature of all corrections to be made to the Shop Drawings and Product Data, if any, shall be clearly noted, and the submittals shall be returned to the Contractor for such corrections. If a change in the scope of the Work is intended by revisions requested to any Shop Drawings and Product Data, the Contractor shall be requested to prepare a change proposal in accordance with Article 35, Changes In The Work. On resubmitted Shop Drawings, Product Data or Samples, the Contractor shall direct specific attention in writing on the transmittal cover to revisions other than those corrections requested by the Architect/Engineer on any previously checked submittal. The Architect/Engineer shall promptly review and comment on, and return, the resubmitted items.
The Contractor shall thereafter furnish such other copies in the form approved by the Architect/Engineer as may be needed for the prosecution of the work.
B. FABRICATION AND ORDERING Fabrication shall be started by the Contractor only after receiving approved Shop Drawings from the Architect/Engineer. Materials shall be ordered in accordance with approved Product Data. Work which is improperly fabricated, whether through incorrect Shop Drawings, faulty workmanship or materials, will not be acceptable.
C. DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS The review and comments of the Architect/Engineer of Shop Drawings, Product Data or Samples shall not relieve the Contractor from responsibility for deviations from the Drawings or Specifications, unless he or she has in writing called the attention of the Architect/Engineer to such deviations at the time of submission, nor shall it relieve the Contractor from responsibility for errors of any sort in Shop Drawings or Product Data. Review and comments on Shop Drawings or Product Data containing identified deviations from the Contract Documents shall not be the basis for a Change Order or a claim based on a change in the scope of the Work unless Notice is given to the Architect/Engineer and Principal Representative of all additional costs, time and other impacts of the identified deviation by bring it to their attention in writing at the time the submittals are made, and any subsequent change in the Contract sum or the Contract time shall be limited to cost, time and impacts so identified.
D. CONTRACTOR REPRESENTATIONS By preparing, approving, and/or submitting Shop Drawings, Product Data and Samples, the Contractor represents that the Contractor has determined and verified all materials, field measurements, and field construction criteria related thereto, and has checked and co-ordinated the information contained within each submittal with the requirements of the Work, the Project and the Contract Documents and prior reviews and approvals.
ARTICLE 14. SAMPLES AND TESTING A. SAMPLES The Contractor shall furnish for approval, with such promptness as to cause no delay in his or her work or in that of any other Contractor, all Samples as directed by the Architect/Engineer. The Architect/Engineer shall check and approve such Samples, with reasonable promptness, but only for conformance with the design intent of the Contract Documents and the Project, and for compliance with any submission requirements given in the Contract Documents.
B. TESTING-GENERAL The Contractor shall provide such equipment and facilities as the Architect/Engineer may require for conducting field tests and for collecting and forwarding samples to be tested. Samples themselves shall not be incorporated into the Work after approval without the permission of the Architect/Engineer. All materials or equipment proposed to be used may be tested at any time during their preparation or use. The Contractor shall furnish the required samples without charge and shall give sufficient Notice of the placing of orders to permit the testing thereof. Products may be sampled either prior to shipment or after being received at the site of the Work.
Tests shall be made by an accredited testing laboratory. Except as otherwise provided in the Specifications, sampling and testing of all materials, and the laboratory methods and testing equipment, shall be in accordance with the latest standards and tentative methods of the American Society of Testing Materials (ASTM). The cost of testing which is in addition to the requirements of the Specifications shall be paid by the Contractor if so directed by the Architect/Engineer, and the Contract sum shall be adjusted accordingly by Change Order; provided however, that whenever testing shows portions of the Work to be deficient, all costs of testing including that required to verify the adequacy of repair or replacement work shall be the responsibility of the Contractor.
C. TESTING — CONCRETE AND SOILS Unless otherwise specified or provided elsewhere in the Contract Documents, the Principal Representative will contract for and pay for the testing of concrete and for soils compaction testing through an independent laboratory or laboratories selected and approved by the Principal Representative. The Contractor shall assume the responsibility of arranging, scheduling and coordinating the concrete sample collection efforts and soils compaction efforts. Testing shall be performed in accordance with the requirements of the Specifications, and if no requirements are specified, the Contractor shall request instructions and testing shall be as directed by the Architect/Engineer or the soils engineer, as applicable, and in accordance with standard industry practices.
The Principal Representative and the Architect/Engineer shall be given reasonable advance notice of each concrete pour and reserve the right to either increase or decrease the number of cylinders or the frequency of tests.
Soil compaction testing shall be at random locations selected by the soils engineer. In general, soils compaction testing shall be as directed by the soils engineer and shall include all substrate prior to backfill or construction.
D. TESTING — OTHER Additional testing required by the Specifications will be accomplished and paid for by the Principal Representative in a manner similar to that for concrete and soils unless noted otherwise in the Specifications. In any case, the Contractor will be responsible for arranging, scheduling and coordinating additional tests. Where the additional testing will be contracted and paid for by the Principal Representative the Contractor shall give the Principal Representative not less than one month advance written Notice of the date the first such test will be required. ARTICLE 15. SUBCONTRACTS The Contractor shall, within twenty one (21) days after the date of the Notice of Award, submit to the Architect/Engineer, the Principal Representative and State Buildings Programs a preliminary list of Subcontractors. It shall be as complete as possible at the time, showing all known Subcontractors planned for the work. The list shall be supplemented as other Subcontractors are determined by the Contractor and any such supplemental list shall be submitted to the Architect/Engineer, the Principal Representative and State Buildings Programs not less than ten (10) days before the Subcontractor commences work.
The Contractor's list shall include those Subcontractors, if any, which the Contractor indicated in its bid would be employed for specific portions of the Work if such indication was requested in the bid documents issued by the State. The substitution of any Subcontractor listed in the Contractor's bid shall be justified in writing not less than ten (10) days after the date of the Notice of Award, and shall be subject to the approval of the Principal Representative. For reasons such as the Subcontractor's refusal to perform as agreed, subsequent unavailability or later discovered bid errors, or other similar reasons, but not including the availability of a lower Subcontract price, such substitution may be approved. The Contractor shall bear any additional cost incurred by such substitutions. The Contractor shall not employ any Subcontractor that the Architect/Engineer, within seven (7) days after the date of receipt of the Contractor's list of Subcontractors or any supplemental list, objects to in writing as being unacceptable to either the Architect/Engineer, the Principal Representative or State Buildings Programs. If a Subcontractor is deemed unacceptable, the Contractor shall propose a substitute Subcontractor and the Contract sum shall be adjusted by any demonstrated difference between the Subcontractor's bids, except where the Subcontractor has been debarred by the State or fails to meet qualifications of the Contract Documents to perform the work proposed. The Contractor shall be fully responsible to the Principal Representative for the acts and omissions of Subcontractors and of persons either directly or indirectly employed by them. All instructions or orders in respect to work to be done by Subcontractors shall be given to the Contractor. ARTICLE 16. RELATIONS OF CONTRACTOR AND SUBCONTRACTOR The Contractor agrees to bind each Subcontractor to the terms of these General Conditions and to the requirements of the Drawings and Specifications, and any Addenda thereto, and also all the other Contract Documents, so far as applicable to the work of such Subcontractor. The Contractor further agrees to bind each Subcontractor to those terms of the General Conditions which expressly require that Subcontractors also be bound, including without limitation, requirements that Subcontractors waive all rights of subrogation, provide adequate general commercial liability and property insurance, automobile insurance and workers' compensation insurance as provided inArticle 25, Insurance. Nothing contained in the Contract Documents shall be deemed to create any contractual relationship whatsoever between any Subcontractor and the State of Colorado acting by and through its Principal Representative.
ARTICLE 17. MUTUAL RESPONSIBILITY OF CONTRACTORS Should the Contractor cause damage to any separate contractor on the work, the Contractor agrees, upon due Notice, to settle with such contractor by agreement, if he or she will so settle. If such separate contractor sues the Principal Representative on account of any damage alleged to have been so sustained, the Principal Representative shall notify the Contractor, who shall defend such proceedings if requested to do so by Principal Representative. If any judgment against the Principal Representative arises there from, the Contractor shall pay or satisfy it and pay all costs and reasonable attorney fees incurred by the Principal Representative, in accordance with Article 52C, Indemnification, provided the Contractor was given due Notice of an opportunity to settle. ARTICLE 18. SEPARATE CONTRACTS The Principal Representative reserves the right to enter into other contracts in connection with the Project or the Contract. The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall property connect and coordinate his or her work with theirs. If any part of the Contractor's work depends, for proper execution or results, upon the work of any other contractor, the Contractor shall inspect and promptly report to the Architect/Engineer any defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance of the other contractor's work as fit and proper for the reception of work, except as to defects which may develop in the other Contractor's work after the execution of the Contractor's work. To insure the proper execution of subsequent work, the Contractor shall measure work already in place and shall at once report to the Architect/Engineer any discrepancy between the executed work and the Drawings.
ARTICLE 19. USE OF PREMISES The Contractor shall confine apparatus, the storage of materials and the operations of workmen to limits indicated by law, ordinances, permits and any limits lines shown on the Drawings. The Contractor shall not unreasonably encumber the premises with materials.
The Contractor shall enforce all of the Architect/Engineer's instructions and prohibitions regarding, without limitation, such matters as signs, advertisements, fires and smoking. ARTICLE 20. CUTTING, FITTING OR PATCHING The Contractor shall do all cutting, fitting or patching of work that may be required to make its several parts come together properly and fit it to receive or be received by work of other Contractors shown upon, or reasonably inferred from, the Drawings and Specifications for the complete structure, and shall provide for such finishes to patched or fitted work as the Architect/Engineer may direct. The Contractor shall not endanger any work by cutting, excavating or otherwise altering the work and shall not cut or alter the work of any other Contractor save with the consent of the Architect/Engineer. ARTICLE 21. UTILITIES A. TEMPORARY UTILITIES Unless otherwise specifically stated in the Specifications or on the Drawings, the Principal Representative shall be responsible for the locations of all utilities as shown on the Drawings or indicated elsewhere in the Specifications, subject to the Contractor's compliance with all statutory or regulatory requirements to call for utility locates. When actual conditions deviate from those shown the Contractor shall comply with the requirements of Article 37, Differing Site Conditions. The Contractor shall provide and pay for the installation of all temporary utilities required to supply all the power, light and water needed by him and other Contractors for their Work and shall install and maintain all such utilities in such manner as to protect the public and workmen and conform with any applicable laws and regulations. Upon completion of the work, he or she shall remove all such temporary utilities from the site. The Contractor shall pay for all consumption of power, light and water used by him or her and the other Contractors, without regard to whether such items are metered by temporary or permanent meters. The Superintendent shall have full authority over all trades and Subcontractors at any tier to prevent waste. The cut-off date on permanent meters shall be either the agreed date of the Notice of Approval of Beneficial Occupancy or the date of the Notice of Substantial Completion of the Project, whichever shall be the earlier date.
B. PROTECTION OF EXISTING UTILITIES Where existing utilities, such as water mains, sanitary sewers, storm sewers and electrical conduits, are shown on the Drawings, the Contractor shall be responsible for the protection thereof, without regard to whether any such utilities are to be relocated or removed as a part of the Work. If any utilities are to be moved, the moving must be conducted in such manner as not to cause undue interruption or delay in the operation of the same.
C. CROSSING OF UTILITIES When new construction crosses highways, railroads, streets, or utilities under the jurisdiction of State, city or other public agency, public utility or private entity, the Contractor shall secure proper written permission before executing such new construction. The Contractor will be required to furnish a proper release before final acceptance of the Work.
ARTICLE 22. UNSUITABLE CONDITIONS The Contractor shall not work at any time, or permit any work to be done, under any conditions contrary to those recommended by manufacturers or industry standards which are otherwise proper, unsuited for proper execution, safety and performance. Any cost caused by ill-timed work shall be borne by the Contractor unless the timing of such work shall have been directed by the Architect/Engineer or the Principal Representative, after the award of the Contract, and the Contractor provided Notice of any additional cost.
ARTICLE 23. TEMPORARY FACILITIES A. OFFICE FACILITIES The Contractor shall provide and maintain without additional expense for the duration of the Project temporary office facilities, as required and as specified, for his or her own use and the use of the Architect/Engineer, representatives of the Principal Representative and State Buildings Programs.
B. TEMPORARY HEAT The Contractor shall furnish and pay for all the labor, facilities, equipment, fuel and power necessary to supply temporary heating, ventilating and air conditioning, except to the extent otherwise specified, and shall be responsible for the installation, operation, maintenance and removal of such facilities and equipment. Unless otherwise specified, the permanent HVAC system shall not be used for temporary heat in whole or in part. If the Contractor desires to put the permanent system into use, in whole or in part, the Contractor shall set it into operation and furnish the necessary fuel and manpower to safely operate, protect and maintain that HVAC system. Any operation of all or any part of the permanent HVAC system including operation for testing purposes shall not constitute acceptance of the system, nor shall it relieve the Contractor of his or her one-year guarantee of the system from the date of the Notice of Substantial Completion of the entire Project, and if necessary due to prior operation, the Contractor shall provide manufacturers' extended warranties from the date of the Contractor's use prior to the date of the Notice of Substantial Completion. In the event a manufacturer's standard warranty runs from the date of first use and such first use occurs prior to the date of the Notice of Approval of Beneficial Occupancy and/or prior to the date of the Notice of Substantial Completion, and such occupancy date was not contemplated in the Contract Documents, the Contractor shall provide an extended manufacturer's warranty and any extended warranty cost shall be reimbursed to the Contractor; provided, however, that reimbursement shall only be due if the Contractor shall have given advance Notice of such additional cost and shall have given the Principal Representative a reasonable opportunity to decline such extended warranty coverage.
C. WEATHER PROTECTION The Contractor shall, at all times, provide protection against weather, so as to maintain all work, materials, apparatus and fixtures free from injury or damages.
D. DUST PARTITIONS If the Work involves work in an occupied existing building, the Contractor shall erect and maintain during the progress of the work, suitable dust-proof temporary partitions, or more permanent partitions as specified, to protect such building and the occupants thereof.
E. BENCH MARKS The Contractor shall maintain any site bench marks provided by the Principal Representative and shall establish any additional benchmarks specified by the Architect/Engineer as necessary for the Contractor to layout the work and ascertain all grades and levels as needed.
F. SIGN The Contractor shall erect and permit one 4' × 8' sign only at the site to identify the Project as specified or directed by the Architect/Engineer which shall be maintained in good condition during the life of the Project.
G. SANITARY PROVISION The Contractor shall provide and maintain suitable, clean, temporary sanitary toilet facilities for any and all workmen engaged on the Work, for the entire construction period, in strict compliance with the requirement of all applicable codes, regulations, laws and ordinances, and no other facilities, new or existing, may be used by any person on the Project. When the Project is complete the Contractor shall promptly remove them from the site, disinfect, and clean or treat the areas as required. If any new construction surfaces in the Project other than the toilet facilities provided for herein are soiled at any time, the entire areas so soiled shall be completely removed from the Project and rebuilt. ARTICLE 24. CLEANING UP The Contractor shall keep the building and premises free from all surplus material, waste material, dirt and rubbish caused by employees or work, and at the completion of the Work shall remove all such surplus material, waste material, dirt, and rubbish, as well as all tools, equipment and scaffolding, and shall wash and clean all window glass and plumbing fixtures, perform cleanup and cleaning required by the Specifications and leave all of the work clean unless more exact requirements are specified. ARTICLE 25. INSURANCE A. GENERAL LIABILITY, PROPERTY DAMAGE AND AUTOMOBILE The Contractor shall procure and maintain comprehensive commercial general liability and property damage insurance and comprehensive automobile liability and property damage insurance as hereinafter specified, at his or her own expense, during the life of this Contract. This insurance shall include a provision preventing cancellation without forty-five (45) days' prior Notice by certified mail and shall state whether the coverage is “claims made” or “per occurrence”. The Contractor shall obtain “per occurrence” insurance unless otherwise agreed in writing by the Principal Representative. A completed Certificate of Insurance shall be filed with State Buildings Programs within ten (10) days after the date of the Notice of Award, said Certificate to specifically state the inclusion of the coverages and provisions set forth herein. This insurance must protect the Contractor from all claims for bodily injury, including death, and all claims for destruction of or damage to property, arising out of or in connection with, any operations under this Contract, whether such operations be by the Contractor or by any Subcontractor under him or anyone directly or indirectly employed by the Contractor or by a Subcontractor. All such insurance shall be written with limits and coverages as specified below and shall be written on a Comprehensive Form of Policy. In the event any of the hazards or exposures, normally listed in standard policies as “Exclusions”, are involved or required under this Contract, then such hazards or exposures shall be covered and protection afforded under the policy and such exclusions (X), (c) and (u), as excerpted from standard policies, must be removed from the policy as listed below:
B. WORKERS' COMPENSATION INSURANCE The Contractor shall procure and maintain Workers' Compensation Insurance at his or her own expense during the life of this Contract, including occupational disease provisions for all employees. This insurance, if issued by a private carrier, shall contain the same forty-five (45) days' Notice of cancellation as required in Article 25, Insurance for the Comprehensive General Liability Insurance. Evidence of such insurance shall be by the issuance of either a Certificate by the State Compensation Insurance Fund (or its successor) or, if issued by a private carrier, the completion of a Certificate of Insurance, and such Certificate shall be filed with the State Buildings Program. The Certificate shall be filed within ten (10) days after the date of the Notice of Award.
The Contractor shall also require each Subcontractor to furnish Workers' Compensation Insurance, including occupational disease provisions for all of the latter's employees, and to the extent not furnished, the Contractor accepts full liability and responsibility for Subcontractor's employees. In cases where any class of employees engaged in hazardous work under this Contract at the site of the Project is not protected under the Workers' Compensation statute, the Contractor shall provide, and shall cause each Subcontractor to provide, adequate and suitable insurance for the protection of employees not otherwise protected.
C. BUILDER'S RISK INSURANCE Unless otherwise expressly stated in the Supplementary General Conditions (e.g. where the State elects to provide for projects with a completed value of less than $1,000,000), the Contractor shall effect and maintain a policy of insurance to provide, at Contractor's expense, All Risk Builder's Risk Insurance Coverage which shall be in the dollar amount of the total Project for which the Work of this Contract is to be done. Such policy may have a deductible clause but not to exceed ten thousand dollars ($10,000.00). The Contractor shall waive all rights of subrogation as regards the State of Colorado, its officials, its officers, its agents and its employees, all while acting within the scope and course of their employment. The Insurer shall not void such insurance policy by reason of the Contractor waiving said rights. The Contractor shall require all Subcontractors at any tier to similarly waive all such rights of subrogation and shall expressly include such a waiver in all subcontracts. The insurance shall remain in effect until the Date of Notice specified on the Notice of Acceptance, State Form SC-6.27, whether or not the building or some part thereof is occupied in any manner prior to final acceptance of the Project, and shall remain fully in effect not withstanding any acceptance of the work of any Subcontractor on the Project. Such insurance shall be in an amount equal to the total insurable value of the construction. Upon request, the amount of such insurance shall be increased to include the cost of any additional work to be done on the Project, or materials or equipment to be incorporated in the Project, or materials or equipment to be incorporated in the Project, under other independent contracts let or to be let. In such event, the Contractor shall be reimbursed for this cost as his or her share of the insurance in the same ratio as the ratio of the insurance represented by such independent contracts let or to be let to the total insurance carried.
All such insurance shall insure the State of Colorado acting by and through its Principal Representative, the Contractor and his or her Subcontractors at any tier as their interests may appear. The insurance shall include a loss payable provision naming the State Controller, as loss payee. The Principal Representative, with approval of the State Controller, shall have the power to adjust and settle any loss. Unless it is agreed otherwise, all monies received shall be applied first on rebuilding or repairing the destroyed or injured work.
The Certificate of Insurance shall specifically state the inclusion of the provisions herein above. A certificate for such insurance shall be filed with State Buildings Programs within ten (10) days after date of Notice of Award. The Insurance shall include a provision preventing cancellation without forty five (45) days' prior Notice in writing by certified mail.
D. ADDITIONAL MISCELLANEOUS INSURANCE PROVISIONS Certificates of insurance and/or insurance policies required under this Contract shall be subject to the following stipulations and additional requirements:
ARTICLE 26. CONTRACTOR'S PERFORMANCE AND PAYMENT BONDS The Contractor shall furnish a Performance Bond and a Labor and Material Payment Bond on State Form s SC-6.22, Performance Bond, and SC-6.221, Labor and Material Payment Bond, or such other forms as State Buildings Programs may approve for the Project, executed by a corporate Surety authorized to do business in the State of Colorado and in the full amount of the Contract sum. The expense of these bonds shall be borne by the Contractor and the bonds shall be filed with State Buildings Programs. If, at any time, a Surety on such a bond is found to be, or ceases to be in strict compliance with any qualification requirements of the Contract Documents or the bid documents, or loses its right to do business in the State of Colorado, another Surety will be required, which the Contractor shall furnish to State Buildings Programs within ten (10) days after receipt of Notice from the State or after the Contractor otherwise becomes aware of such conditions.
ARTICLE 27. LABOR AND WAGES In accordance with laws of Colorado, C.R.S. § 8-17-101, et. seq., as amended, Colorado labor shall be employed to perform the work to the extent of not less than eighty percent (80%) of each type or class of labor in the several classifications of skilled and common labor employed on the Project. If the Federal Davis-Bacon Act shall be applicable to the Project, as indicated in Article 54B, Modification of Article 27, the minimum wage rates to be paid on the Project will be specified in the Contract Documents. ARTICLE 28. ROYALTIES AND PATENTS The Contractor shall be responsible for assuring that all rights to use of products and systems have been properly arranged and shall take such action as may be necessary to avoid delay, at no additional charge to the Principal Representative, where such right is challenged during the course of the work. The Contractor shall pay all royalties and license fees required to be paid and shall defend all suits or claims for infringement of any patent rights and shall save the State of Colorado harmless from loss on account thereof, in accordance with Article 52C, Indemnification; provided, however, the Contractor shall not be responsible for such loss or defense for any copyright violations contained in the Contract Documents prepared by the Architect/Engineer or the Principal Representative of which the Contractor is unaware, or for any patent violations based on specified processes that the Contractor is unaware are patented or that the Contractor should not have had reason to believe were patented. ARTICLE 29. ASSIGNMENT Except as otherwise provided hereafter the Contractor shall not assign the whole or any part of this Contract without the written consent of the Principal Representative. This provision shall not be construed to prohibit assignments of the right to payment to the extent permitted by Section 4-9-406, C.R.S., as amended, provided that written Notice of assignment adequate to identify the rights assigned is received by the Principal Representative and the controller for the agency, department, or institution executing this Contract (as distinguished from the State Controller). Such assignment of the right to payment shall not be deemed valid until receipt by the Principal Representative and such controller and the Contractor assumes the risk that such written Notice of assignment is received by the Principal Representative and the controller for the agency, department, or institution involved. In case the Contractor assigns all or part of any moneys due or to become due under this Contract, the instrument of assignment shall contain a clause substantially to the effect that it is agreed that the right of the assignee in and to any moneys due or to become due to the Contractor shall be subject to all claims of all persons, firms, and corporations for services rendered or materials supplied for the performance of the work called for in this Contract, whether said service or materials were supplied prior to or after the assignment. Nothing in this Article shall be deemed a waiver of any other defenses available to the State against the Contractor or the assignee.
ARTICLE 30. CORRECTION OF WORK BEFORE ACCEPTANCE The Contractor shall promptly remove from the premises all work or materials condemned or declared irreparably defective as failing to conform to the Contract Documents on receipt of written Notice from the Architect/Engineer or the Principal Representative, whether incorporated in the Work or not. If such materials shall have been incorporated in the Work, or if any unsatisfactory work is discovered, the Contractor shall promptly replace and re-execute his or her work in accordance with the requirements of the Contract Documents without expense to the Principal Representative, and shall also bear the expense of making good all work of other contractors destroyed or damaged by the removal or replacement of such defective material or work.
If the Contractor does not remove such condemned or irreparably defective work or material within a reasonable time, the Principal Representative may, after giving a second seven (7) day advance Notice to the Contractor and the Surety, remove them and may store the material at the Contractor's expense. The Principal Representative may accomplish the removal and replacement with its own forces or with another Contractor. If the Contractor does not pay the expense of such removal and pay all storage charges within ten (10) days thereafter, the Principal Representative may, upon ten (10) days' written Notice, sell such material at auction or at private sale and account for the net proceeds thereof, after deducting all costs and expenses which should have been borne by the Contractor. If the Contractor shall commence and diligently pursue such removal and replacement before the expiration of the seven day period, or if the Contractor shall show good cause in conjunction with submittal of a revised CPM schedule showing when the work will be performed and why such removal of condemned work should be scheduled for a later date, the Principal Representative shall not proceed to remove or replace the condemned work.
Should any defective work or material be discovered during the process of construction, or should reasonable doubt arise as to whether certain material or work is in accordance with the Contract Documents, the value of such defective or questionable material or work shall not be included in any application for payment, or if previously included, shall be deducted by the Architect/Engineer from the next application submitted by the Contractor.
If the Contractor does not perform repair, correction and replacement of defective work, in lieu of proceeding by issuance of a Notice of intent to remove condemned work as outlined above, the Principal Representative may, not less than seven (7) days after giving the original written Notice of the need to repair, correct, or replace defective work, deduct all costs and expenses of replacement or correction as instructed by the Architect/Engineer from the Contractor's next application for payment in addition to the value of the defective work or material. The Principal Representative may also make an equitable deduction from the Contract sum by unilateral Change Order, in accordance with Article 33, Payments Withheld and Article 35, Changes in The Work.
If the Contractor disagrees with the Notice to remove work or materials condemned or declared irreparably defective, the Contractor may request facilitated negotiation of the issue and the Principal Representative's right to proceed with removal and to deduct costs and expenses of repair shall be suspended and tolled until such time as the parties meet and negotiate the issue During construction, whenever the Architect/Engineer has advised the Contractor in writing, in the Specifications, by reference to Article 6, Architect/Engineer Decisions And Judgments, of these General Conditions or elsewhere in the Contract Documents of a need to observe materials in place prior to their being permanently covered up, it shall be the Contractor's responsibility to notify the Architect/Engineer at least forty-eight (48) hours in advance of such covering operation. If the Contractor fails to provide such notification, Contractor shall, at his or her expense, uncover such portions of the work as required by the Architect/Engineer for observation, and reinstall such covering after observation. When a covering operation is continued from day to day, notification of the commencement of a single continuing covering operation shall suffice for the activity specified so long as it proceeds regularly and without interruption from day to day, in which event the Contractor shall coordinate with the Architect/Engineer regarding the continuing covering operation.
ARTICLE 31. APPLICATIONS FOR PAYMENTS A. CONTRACTOR'S SUBMITTALS On or before the first day of each month and no more than five days prior thereto, the Contractor may submit applications for payment for the work performed during such month covering the portion of the Work completed as of the date indicated, and payments on account of this Contract shall be due within thirty (30) days after the last day of the period for which payment is requested. The Contractor shall submit the application for payment to the Architect/Engineer on State forms SC-7.2, Certificate for Contractor's Payment, continuation forms, SC-7.2A and 7.2B if necessary, or such other format as the State Buildings Programs shall approve, in an itemized format in accordance with the schedule of values or a cost loaded CPM when required, supported to the extent reasonably required by the Architect/Engineer or the Principal Representative by receipts or other vouchers, showing payments for materials and labor, prior payments and payments to be made to Subcontractors and such other evidence of the Contractor's right to payments as the Architect/Engineer or Principal Representative may direct. If payments are made on account of materials not incorporated in the Work but delivered and suitably stored at the site, or at some other location agreed upon in writing, such payments shall be conditioned upon submission by the Contractor of bills of sale or such other procedure as will establish the Principal Representative's title to such material or otherwise adequately protect the Principal Representative's interests, and shall provide proof of insurance whenever requested by the Principal Representative or the Architect/Engineer, and shall be subject to the right to inspect the materials at the request of either the Architect/Engineer or the Principal Representative.
All applications for payment, except the final application, and the payments there under, shall be subject to correction in the next application rendered following the discovery of any error.
B. ARCHITECT/ENGINEER CERTIFICATION In accordance with the Architect/Engineer's agreement with the Principal Representative, the Architect/Engineer after appropriate observation of the progress of the work shall certify to the Principal Representative the amount that the Contractor is entitled to, and forward the application to the Principal Representative. If the Architect/Engineer certifies an amount different from the amount requested or otherwise alters the Contractor's application for payment, a copy shall be forwarded to the Contractor. If the Architect/Engineer is unable to certify all or portions of the amount requested due to the absence or lack of required supporting evidence, the Architect/Engineer shall advise the Contractor of the deficiency. If the deficiency is not corrected at the end of ten (10) days, the Architect/Engineer may either certify the remaining amounts properly supported to which the Contractor is entitled, or return the application for payment to the Contractor for revision with a written explanation as to why it could not be certified.
C. RETAINAGE WITHHELD Unless otherwise provided in the Supplementary General Conditions, an amount equivalent to ten percent (10%) of the amount shown to be due the Contractor on each application for payment shall be withheld until fifty percent (50%) of the work required by the Contract has been performed. Thereafter, the remaining Certificates for Contractor's Payment (SC-7.2) shall be paid without retaining additional funds, if in the opinion of the Architect/Engineer and the Principal Representative, satisfactory progress is being made in the Work. The withheld percentage of the contract price of any such work, improvement, or construction shall be administered according to § 24-91-101, et seq., C.R.S., as amended, and except as provided in § 24-91-103, C.R.S., as amended, and Article 31D, shall be retained until the Work or discrete portions of the Work, have been completed satisfactorily, finally or partially accepted, and advertised for final settlement as further provided in Article 41.
D. RELEASE OF RETAINAGE The Contractor may, for satisfactory and substantial reasons shown to the Principal Representative's satisfaction, make a written request to the Principal Representative and the Architect/Engineer for release of part or all of the withheld percentage applicable to the work of a Subcontractor which has completed the subcontracted work in a manner finally acceptable to the Architect/Engineer, the Contractor, and the Principal Representative. Any such request shall be supported by a written approval from the Surety furnishing the Contractor's bonds and any surety that has provided a bond for the Subcontractor. The release of any such withheld percentage shall be further supported by such other evidence as the Architect/Engineer or the Principal Representative may require, including but not limited to, evidence of prior payments made to the Subcontractor, copies of the Subcontractor's contract with the Contractor, any applicable warranties, as-built information, maintenance manuals and other customary close-out documentation. Neither the Principal Representative nor the Architect Engineer shall be obligated to review such documentation nor shall they be deemed to assume any obligations to third parties by any review undertaken.
The Contractor's obligation under these General Conditions to guarantee work for one year from the date of the Notice of Substantial Completion or the date of any Notice of Partial Substantial Completion of the applicable portion or phase of the Project, shall be unaffected by such partial release; unless a Notice of Partial Substantial Completion is issued for the work subject to the release of retainage. Any rights of the Principal Representative which might be terminated by or from the date of any final acceptance of the Work, whether at common law or by the terms of this Contract, shall not be affected by such partial release of retainage prior to any final acceptance of the entire Project. The Contractor remains fully responsible for the Subcontractor's work and assumes any risk that might arise by virtue of the partial release to the Subcontractor of the withheld percentage, including the risk that the Subcontractor may not have fully paid for all materials, labor and equipment furnished to the Project. If the Principal Representative considers the Contractor's request for such release satisfactory and supported by substantial reasons, the Architect/Engineer shall make a “final inspection” of the applicable portion of the Project to determine whether the Subcontractor's work has been completed in accordance with the Contract Documents. A final punch list shall be made for the Subcontractor's work and the procedures of Article 41, Completion, Final Inspection, Acceptance and Settlement, shall be followed for that portion of the work, except that advertisement of the intent to make final payment to the Subcontractor shall be required only if the Principal Representative has reason to believe that a supplier or Subcontractor to the Subcontractor for which the request is made, may not have been fully paid for all labor and materials furnished to the Project.
ARTICLE 32. CERTIFICATES FOR PAYMENTS State Form SC-7.2, Certificate For Contractor's Payment, and its continuation detail sheets, when submitted, shall constitute the Certificate of Contractor's Application for Payment, and shall be a representation by the Contractor to the Principal Representative that the Work has progressed to the point indicated, the quality of the Work is in accordance with the Contract Documents, and materials for which payment is requested have been incorporated into the Project except as noted in the application. If requested by the Principal Representative the Certificate of Contractor's Application for Payment shall be sworn under oath and notarized.
ARTICLE 33. PAYMENTS WITHHELD The Architect/Engineer, the Principal Representative or State Buildings Programs may withhold, or on account of subsequently discovered evidence nullify, the whole or any part of any application on account of, but not limited to any of the following:
ARTICLE 35. CHANGES IN THE WORK The Principal Representative, or such other Procurement Officer as the Principal Representative may designate, without invalidating the Agreement, and with the approval of State Buildings Programs and the State Controller, may order extra work or make changes with or without the consent of the Contractor as hereafter provided, by altering, adding to or deducting from the Work, the Contract sum being adjusted accordingly. All such changes in the Work shall be within the general scope of and be executed under the conditions of the Contract, except that any claim for extension of time made necessary due to the change or any claim of other delay or other impacts caused by or resulting from the change in the Work shall be presented by the Contractor and adjusted by Change Order to the extent known at the time such change is ordered and before proceeding with the extra or changed work. Any claims for extension of time or of delay or other impacts, and any costs associated with extension of time, delay or other impacts, which are not presented before proceeding with the change in the Work, and which are not adjusted by Change Order to the extent known, shall be waived.
The Architect/Engineer shall have authority to make minor changes in the Work, not involving extra cost, and not inconsistent with the intent of the Contract Documents, but otherwise, except in an emergency endangering life or property, no extra work or change in the Contract Documents shall be made unless by 1) a written Change Order, approved by the Principal Representative, State Buildings Programs, and the State Controller prior to proceeding with the changed work; or 2) by an Emergency Field Change Order approved by the Principal Representative and State Buildings Programs as hereafter provided in Article 35C, Emergency Field Ordered Changed Work; or 3) by an allocation in writing of any allowance already provided in the encumbered contract amount, the Contract sum being later adjusted to decrease the Contract sum by any unallocated or unexpended amounts remaining in such allowance. No change to the Contract sum shall be valid unless so ordered.
A. THE VALUE OF CHANGED WORK 1. The value of any extra work or changes in the Work shall be determined by agreement in one or more of the following ways:
2. Where the Contractor and the Principal Representative cannot agree on the value of extra work, the Principal Representative may order the Contractor to perform the changes in the Work and a Change Order may be unilaterally issued based on an estimate of the change in the Work prepared by the Architect/Engineer. The value of the change in the Work shall be the Principal Representative's determination of the amount of equitable adjustment attributable to the extra work or change. The Principal Representative's determination shall be subject to appeal by the Contractor pursuant to the claims process in Article 36, Claims. The Principal Representative is the Procurement Officer for purposes of all of the remedies provisions of the Contract.
3. Except as otherwise provided in Article 35B, Detailed Breakdown, below, the Cost Principles of the Colorado Procurement Rules in effect on the date of this Contract, pursuant to § 24-107-10, C.R.S., as amended, shall govern all Contract changes.
B. DETAILED BREAKDOWN In all cases where the value of the extra or changed work is not known based on unit prices in the Contractor's bid or the Agreement, a detailed change proposal shall be submitted by the Contractor on a Change Order Proposal (SC-6.312), or in such other format as the State Buildings Program approves, with which the Principal Representative may require an itemized list of materials, equipment and labor, indicating quantities, time and cost for completion of the changed work. Such detailed change proposals shall be stated in lump sum amounts and shall be supported by a separate breakdown, which shall include estimates of all or part of the following when requested by the Architect/Engineer or the Principal Representative:
Unless modified in the Supplementary General Conditions, overhead and profit shall not exceed the percentages set forth in the table below.
To the Contractor or to 5% 5% Subcontractors for work performed by others at a tier immediately below either of them:
Overhead shall include: a) insurance premium for policies not purchased for the Project and itemized above, b) home office costs for office management, administrative and supervisory personnel and assistants, c) estimating and change order preparation costs, d) incidental job burdens, e) legal costs, f) data processing costs, g) interest costs on capital, h) general office expenses except those attributable to increased rental expenses for temporary facilities, and all other indirect costs, but shall not include the Social Security tax and other direct labor burdens. The term “work” as used in the proceeding table shall include labor, materials and equipment and the “Commission” shall include all costs and profit for carrying the subcontracted work at the tiers below except direct costs as listed in items 1 through 11 above if any. On proposals for work involving both additions and credits in the amount of the Contract sum, the overhead and profit will be allowed on the net increase only. On proposals resulting in a net deduct to the amount of the Contract sum, profit on the deducted amount shall be returned to the Principal Representative at fifty percent (50%) of the rate specified. The inadequacy of the profit specified shall not be a basis for refusal to submit a proposal.
Except in the case of Change Order s or Emergency Field Change Orders agreed to on the basis of a lump sum amount or unit prices as described in paragraphs 35A1 and 35A2 above, The Value of Changed Work, the Contractor shall keep and present a correct and fully auditable account of the several items of cost, together with vouchers, receipts, time cards and other proof of costs incurred, summarized on a Change Order form (SC-6.31) using such format for supporting documentation as the Principal Representative and State Buildings Programs approve. This requirement applies equally to work done by Subcontractors. Only auditable costs shall be reimbursable on Change Orders where the value is determined on the basis of actual cost plus a fixed fee pursuant to paragraph 35A3 above, or where unilaterally determined by the Principal Representative on the basis of an equitable adjustment in accordance with the Procurement Rules, as described above in Article 35A, The Value Of Changed Work.
Except for proposals for work involving both additions and credits, changed work shall be adjusted and considered separately for work either added or omitted. The amount of adjustment for work omitted shall be estimated at the time it is directed to be omitted, and when reasonable to do so, the agreed adjustment shall be reflected on the schedule of values used for the next Contractor's application for payment.
The Principal Representative reserves the right to contract with any person or firm other than the Contractor for any or all extra work; however, unless specifically required in the Contract Documents, the Contractor shall have no responsibility without additional compensation to supervise or coordinate the work of persons or firms separately contracted by the Principal Representative.
C. EMERGENCY FIELD CHANGE ORDERED WORK The Principal Representative, without invalidating the Agreement, and with the approval of State Buildings Programs and without the approval of the State Controller, may order extra work or make changes in the case of an emergency that is a threat to life or property or where the likelihood of delays in processing a normal Change Order will result in substantial delays and or significant cost increases for the Project. Emergency Field Orders are not to be used solely to expedite normal Change Order processing absent a clear showing of a high potential for significant and substantial cost or delay. Such changes in the Work may be directed through issuance of an Emergency Field Change Order signed by the Contractor, the Principal Representative (or by a designee specifically appointed to do so in writing), and approved by the Director of State Buildings Program or his or her delegate. The change shall be directed using a State Change Order form (SC-6.31), modified with the words “Emergency Field Change Order” at the top. If the amount of the adjustment of the Contract price and time for completion can be determined at the time of issuance of the Emergency Field Change Order, those adjustments shall be reflected on the face of the Emergency Field Change Order. Otherwise, the Emergency Field Change Order shall reflect a not to exceed (NTE) amount for any schedule adjustment (increasing or decreasing the time for completion) and an NTE amount for any adjustment to Contract sum, which NTE amount shall represent the maximum amount of adjustment to which the Contractor will be entitled, including direct and indirect costs of changed work, as well as any direct or indirect costs attributable to delays, inefficiencies or other impacts arising out of the change. Emergency Field Change Orders directed in accordance with this provision need not bear the approval signatures of the State Controller. On Emergency Field Change Order s where the price and schedule have not been finally determined, the Contractor shall submit final costs for adjustment as soon as practicable. No later than seven (7) days after issuance, except as otherwise permitted, and every seven days thereafter, the Contractor shall report all costs to the Principal Representative and the Architect/Engineer. Weekly cost reports and the final adjustment of the Emergency Field Change Orders amount and the adjustment to the Project time for completion shall be prepared in accordance with the procedures described in Article 35A, The Value of Changed Work, and B, Detailed Breakdown, above. Unless otherwise provided in writing signed by the Director of State Buildings Programs to the Principal Representative and the Contractor, describing the extent and limits of any greater authority, individual Emergency Field Change Orders shall not be issued for more than $25,000, nor shall the cumulative value of Emergency Field Change Orders exceed an amount of $100,000.
D. APPROPRIATION LIMITATIONS — § 24-91-103.6, C.R.S., as amended The amount of money appropriated, as shown on the Agreement (SC 6.21), is equal to or in excess of the Contract amount. No Change Order, Emergency Field Change Order, or other type of order or directive shall be issued by the Principal Representative, or any agent acting on his or her behalf, which directs additional compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract, as shown on the Agreement (SC-6.13), unless one of the following occurs: (1) the Contractor is provided written assurance from the Principal Representative that sufficient additional lawful appropriations exist to cover the cost of the additional work; or (2) the work is covered by a contractor remedy provision under the Contract, such as a claim for extra cost. By way of example only, no assurance is required for any order, directive or instruction by the Architect/Engineer or the Principal Representative to perform work which is determined to be within the performance required by the Contract Documents; the Contractor's remedy shall be as described elsewhere in these General Conditions.
Written assurance shall be in the form of an Amendment to the Contract reciting the source and amount of such appropriation available for the Project. No remedy granting provision of this Contract shall obligate the Principal Representative to seek appropriations to cover costs in excess of the amounts recited as available to pay for the work to be performed.
ARTICLE 36. CLAIMS It is the intent of these General Conditions to provide procedures for speedy and timely resolution of disagreements and disputes at the lowest level possible. In the spirit of on the job resolution of job site issues, the parties are encouraged to use the partnering processes of Article 2D, Partnering, Communications and Cooperation, before turning to the more formal claims processes described in this Article 36, Claims. The use of non-binding dispute resolution, whether through the formal processes described in Article 39, Non-Binding Dispute Resolution — Facilitated Negotiations, or through less formal alternative processes developed as part of a partnering plan, are also encouraged. Where such process cannot resolve the issues in dispute, the claims process that follows is intended to cause the issues to be presented, decided and where necessary, documented in close proximity to the events from which the issues arise. To that end, and in summary of the remedy granting process that follows commencing with the next paragraph of thisArticle 36, Claims, the Contractor shall 1) first, seek a decision by the Architect/Engineer, and 2) shall second, informally present the claim to Principal Representative as described hereafter, and 3) failing resolution in the field, give Notice of intent to exercise statutory rights of review of a formal contract controversy, and 4) seek resolution outside the Contract as provided by the Procurement Code.
If the Contractor claims that any instructions, by detailed drawings, or otherwise, or any other act or omission of the Architect/Engineer or Principal Representative affecting the scope of the Contractor's work, involve extra cost, extra time or changes in the scope of the Work under this Contract, the Contractor shall have the right to assert a claim for such costs or time, provided that before either proceeding to execute such work (except in an emergency endangering life or property), or filing a Notice of claim, the Contractor shall have obtained or requested a written decision of the Architect/Engineer following the procedures as provided in Article 6A and B, Architect/Engineer Decisions and Judgments, respectively; provided, however, that in the case of a directed change in the Work pursuant to Article 36A4, no written judgment or decision of the Architect/Engineer is required. If the Contractor is delayed by the lack of a response to a request for a decision by the Architect/Engineer, the Contractor shall give Notice in accordance with Article 38, Delays And Extensions Of Time. Unless it is the Architect/Engineer's judgment and determination that the work is not included in the performance required by the Contract Documents, the Contractor shall proceed with the work as originally directed. Where the Contractor's claim involves a dispute concerning the value of work unilaterally directed pursuant to Article 35A4 the Contractor shall also proceed with the work as originally directed while his or her claim is being considered.
The Contractor shall give the Principal Representative and the Architect/Engineer Notice of any claim promptly after the receipt of the Architect/Engineer's decision, but in no case later than three (3) business days after receipt of the Architect/Engineer's decision (or no later than ten (10) days from the date of the Contractor's request for a decision when the Architect/Engineer fails to decide as provided in Article 6). The Notice of claim shall state the grounds for the claim and the amount of the claim to the extent known in accordance with the procedures of Article 35, Changes In The Work. The period in which Notice must be given may be extended by the Principal Representative if requested in writing by the Contractor with good cause shown, but any such extension to be effective shall be in writing. The Principal Representative shall respond in writing, with a copy to the Architect/Engineer, within a reasonable time, and except where a request for facilitation of negotiation has been made as hereafter provided, in no case later than seven (7) business days (or at such other time as the Contractor and Principal Representative agree) after receipt of the Contractor's Notice of claim regarding such instructions or alleged act or omission. If no response to the Contractor's claim is received within seven (7) business days of Contractor's Notice (or at such other time as the Contractor and Principal Representative agree) and the instructions have not been retracted, it shall be deemed that the Principal Representative has denied the claim.
The Principal Representative may grant or deny the claim in whole or in part, and a Change Order shall be issued if the claim is granted. To the extent any portion of claim is granted where costs are not clearly shown, the Principal Representative may direct that the value of that portion of the work be determined by any method allowed in Article 35A, The Value Of Changed Work. Except in the case of a deemed denial, the Principal Representative shall provide a written explanation regarding any portion of the Contractor's claim that is denied.
If the Contractor disagrees with the Principal Representative 's judgment and determination on the claim and seeks an equitable adjustment of the Contract sum or time for performance, he or she shall give Notice of intent to exercise his or her statutory right to seek a decision on the contract controversy within ten (10) days of receipt of the Principal Representative's decision denying the claim. A “contract controversy,” as such term is used in the Colorado Procurement Code, § 24-109-106, C.R.S., shall not arise until the initial claim process described above in this Article 36 has been properly exhausted by the Contractor. The Contractor's failure to proceed with work directed by the Architect/Engineer or to exhaust the claim process provided above in this Article 36, shall constitute an abandonment of the claim by the Contractor and a waiver of the right to contest the decision in any forum. At the time of filing the Notice of intent to exercise his or her statutory right to seek a decision on the contract controversy, the Contractor may request that the Principal Representative defer a decision on the contract controversy until a later date or until the end of the Project. If the Principal Representative agrees, he or she shall so advise the Contractor in writing. If no such request is made, or if the Principal Representative does not agree to such a request, the Principal Representative shall render a written decision within twenty (20) business days and advise the Contractor of the reasons for any denial. Unless the claim has been decided by the Principal Representative (as opposed to delegees of the Principal Representative), the person who renders the decision on this statutory contract controversy shall not be the same person who decided the claim. To the extent any portion of the contract controversy is granted where costs are not clearly shown, the Principal Representative may direct that the value of that portion of the work be determined by any method allowed in Article 35A, The Value Of Changed Work. In the event of a denial the Principal Representative shall give Notice to the Contractor of his or her right to administrative and judicial reviews as provided in the Colorado Procurement Code, § 24-109-201 et seq, C.R.S., as amended. If no decision regarding the contract controversy is issued within twenty (20) business days of the Contractor's giving Notice (or such other date as the Contractor and Principal Representative have agreed), and the instructions have not been retracted or the alleged act or omission have not been corrected, it shall be deemed that the Principal Representative has ruled by denial on the contract controversy. Except in the case of a deemed denial, the Principal Representative shall provide an explanation regarding any portion of the contract controversy that involves denial of the Contractor's claim.
Either the Contractor or the Principal Representative may request facilitation of negotiations concerning the claim or the contract controversy, and if requested, the parties shall consult and negotiate before the Principal Representative decides the issue. Any request for facilitation by the Contractor shall be made at the time of the giving of Notice of the claim or Notice of the contract controversy. Facilitation shall extend the time for the Principal Representative to respond by commencing the applicable period at the completion of the facilitated negotiation, which shall be the last day of the parties' meeting, unless otherwise agreed in writing.
Disagreement with the decision of the Architect Engineer, or the decision of the Principal Representative to deny any claim or denying the contract controversy, shall not be grounds for the Contractor to refuse to perform the work directed or to suspend or terminate performance. During the period that any claim or contract controversy decision is pending under this Article 36, Claims, the Contractor shall proceed diligently with the work directed.
In all cases where the Contractor proceeds with the work and seeks equitable adjustment by filing a claim and or statutory appeal, the Contractor shall keep a correct account of the extra cost, in accordance with Article 35B, Detailed Breakdown supported by receipts. The Principal Representative shall be entitled to reject any claim or contract controversy whenever the foregoing procedures are not followed and such accounts and receipts are not presented.
The payments to the Contractor in respect of such extra costs shall be limited to reimbursement for the current additional expenditure by the Contractor made necessary by the change in the work, plus a reasonable amount for overhead and profit, determined in accordance with Article 35B, Detailed Breakdown, determined solely with reference to the additional work, if any, required by the change. ARTICLE 37. DIFFERING SITE CONDITIONS A. NOTICE IN WRITING The Contractor shall promptly, and where possible before conditions are disturbed, give the Architect/Engineer and the Principal Representative Notice in writing of:
The Architect/Engineer shall promptly investigate the conditions, and if it is found that such conditions do materially so differ and cause an increase or decrease in the Contractor's costs of performance of any part of the work required by the Contract Documents, whether or not such work is changed as a result of such conditions, an equitable adjustment shall be made and the Contract sum shall be modified in accordance with Article 35, Changes In The Work.
If the time required for completion of the work affected by such materially differing conditions will extend the work on the critical path as indicated on the CPM schedule, the time for completion shall also be equitably adjusted.
B. LIMITATIONS No claim of the Contractor under this clause shall be allowed unless the Contractor has given the Notice required in Article 37A, Notice in Writing, above. The time prescribed for presentation and adjustment in Articles 36, Claims and 38, Delays And Extensions Of Time, shall be reasonably extended by the State to the extent required by the nature of the differing conditions; provided, however, that even when so extended no claim by the Contractor for an equitable adjustment hereunder shall be allowed if not quantified and presented prior to the date the Contractor requests a final inspection pursuant to Article 41A, Notice Of Completion.
ARTICLE 38. DELAYS AND EXTENSIONS OF TIME If the Contractor is delayed at any time in the progress of the Work by any act or neglect of the State of Colorado or the Architect/Engineer, or of any employee or agent of either, or by any separately employed Contractor or by strikes, lockouts, fire, unusual delay in transportation, unavoidable casualties or any other causes beyond the Contractor's control, including weather delays as defined below, the time of Completion of the Work shall be extended for a period equal to such portion of the period of delays directly affecting the completion of the Work as the Contractor shall be able to show he or she could not have avoided by the exercise of due diligence.
The Contractor shall provide Notice in writing to the Architect/Engineer, the Principal Representative and State Buildings Programs within three (3) business days from the beginning of such delay and shall file a written claim for an extension of time within seven (7) business days after the period of such delay has ceased, otherwise, any claim for an extension of time is waived. Provided that the Contractor has submitted reasonable schedules for approval when required byArticle 12, Requests for Information and Schedules, if no schedule is agreed to fixing the dates on which the responses to requests for information or detail drawings will be needed, or Shop Drawings, Product Data or Samples are to be reviewed as required or allowed by Article 12B, Schedules, no extension of time will be allowed for the Architect/Engineer's failure to furnish such detail drawings as needed, or for the failure to initially review Shop Drawings, Product Data or Samples, except in respect of that part of any delay in furnishing detail drawings or instructions extending beyond a reasonable period after written demand for such detailed drawings or instructions is received by the Architect/Engineer. In any event, any claim for an extension of time for such cause will be recognized only to the extent of delay directly caused by failure to furnish detail drawings or instructions or to review Shop Drawings, Product Data or Samples pursuant to schedule, after such demand.
All claims for extension of time due to a delay claimed to arise or result from ordered changes in the scope of the Work, or due to instructions claimed to increase the scope of the Work, shall be presented to the Architect/Engineer, the Principal Representative and State Buildings Programs as part of a claim for extra cost, if any, in accordance with Article 36, Claims, and in accordance with the Change Order procedures required by Article 35, Changes In The Work. Except as otherwise provided in this paragraph, no extension of time shall be granted when the Contractor has failed to utilize a CPM schedule or otherwise identify the Project's critical path as specified in Article 12, Requests for Information and Schedules, or has elected not to do so when allowed by the Supplementary General Conditions or the Specifications to use less sophisticated scheduling tools, or has failed to maintain such a schedule. Delay directly affecting the completion of the Work shall result in an extension of time only to the extent that completion of the Work was affected by impacts to the critical path shown on Contractor's CPM schedule. Where the circumstances make it indisputable in the opinion of the Architect/Engineer that the delay affected the completion of the Work so directly that the additional notice of the schedule impact by reference to a CPM schedule was unnecessary, a reasonable extension of time may be granted.
Extension of the time for completion of the Work will be granted for delays due to weather conditions only when the Contractor demonstrates that such conditions were more severe and extended than those reflected by the ten-year average for the month, as evidenced by the Climatological Data, U. S. Department of Commerce, for the Project area.
Extensions of the time for completion of the Work due to weather will be granted on the basis of one and three tenths (1.3) calendar days for every day that the Contractor would have worked but was unable to work, with each separate extension figured to the nearest whole calendar day. For weather delays and delays caused by events, acts or omissions not within the control of the Principal Representative or any person acting on the Principal Representative's behalf, the Contractor shall be entitled to an extension of time only and shall not be entitled to recovery of additional cost due to or resulting from such delays. This Article does not, however, preclude the recovery of damages for delay by either party under other provisions in the Contract Documents. ARTICLE 39. NON-BINDING DISPUTE RESOLUTION — FACILITATED NEGOTIATIONS The Contractor and Principal Representative agree to designate one or more mutually acceptable persons willing and able to facilitate negotiations and communications for the resolution of conflicts, disagreements or disputes between them at the specific request of either party with regard to any Project decision of either of them or any decision of the Architect/Engineer. The designation of such person(s) shall not carry any obligation to use their services except that each party agrees that if the other party requests the intervention of such person(s) with respect to any such conflict, dispute or disagreement, the non-requesting party shall participate in good faith attempts to negotiate a resolution of the issue in dispute. If the parties cannot agree on a mutually acceptable person to serve in this capacity one shall be so appointed; provided, however, that either party may request the director of State Buildings Programs to appoint such a person, who, if appointed, shall be accepted for this purpose by both the Contractor and the Principal Representative.
The cost, if any, of the facilitative services of the person(s) so designated shall be shared if the parties so agree in any partnering plan; or in the absence of agreement the cost shall be borne by the party requesting the facilitation of negotiation.
Any dispute, claim, question or disagreement arising from or relating to the Contract or an alleged breach of the Contract may be subject to a request by either party for facilitated negotiation subject to the limitations hereafter listed, and the parties shall participate by consultation and negotiation with each other, as guided by the facilitator and with recognition of their mutual interests, in an attempt to reach an equitable solution satisfactory to both parties.
The obligation to participate in facilitated negotiations shall be as described above and elsewhere in these General Conditions, as by way of example in Article 36, Claims, or Article 34, Deductions for Uncorrected Work, and to the extent not more particularly described or limited elsewhere, each party's obligations shall be as follows:
Prior to any occupancy of the Project, an inspection shall be made by the Architect/Engineer, State Buildings Programs and the Contractor. Such inspection shall be made for the purpose of ensuring that the building is secure, protected by operation safety systems as designed, operable exits, power, lighting and HVAC systems, and otherwise ready for the occupancy intended. The inspection shall also document existing finish conditions to allow assessment of any damage by occupants. The inspection shall be conducted on the assumption that it shall be the final inspection called for in Article 41B, Final Inspection, unless the Architect/Engineer, State Buildings Programs and the Principal Representative determine that all of the requirements necessary to issue the Notice of Substantial Completion will not be met or satisfied. The Contractor shall assist the Principal Representative in completing and executing State Form SBP-01, Approval Of Beneficial Occupancy, prior to the Principal Representative's possession and use. Any and all areas so occupied will be subject to a final inspection when the Contractor complies with Article 41, Completion, Final Inspection, Acceptance And Settlement. ARTICLE 41. COMPLETION, FINAL INSPECTION, ACCEPTANCE AND SETTLEMENT A. NOTICE OF COMPLETION When the Work, or a discrete physical portion of the Work (as hereafter described) which the Principal Representative has agreed to accept separately, is substantially complete and ready for final inspection, the Contractor shall file a written Notice with the Architect/Engineer that the Work, or such discrete physical portion, in the opinion of the Contractor, is substantially complete under the terms of the Contract. The Contractor shall prepare and submit with such Notice a comprehensive list of items to be completed or corrected prior to final payment, which shall be subject to review and additions as the Architect/Engineer or the Principal Representative shall determine after inspection. If the Architect/Engineer or the Principal Representative believe that any of the items on the list of items submitted, or any other item of work to be corrected or completed, or the cumulative number of items of work to be corrected or completed, will prevent a determination that the Work is substantially complete, those items shall be completed by the Contractor and the Notice shall then be resubmitted.
B. FINAL INSPECTION Within ten (10) days after the Contractor files written Notice that the Work is substantially complete, the Architect/Engineer, the Principal Representative, and the Contractor shall make a “final inspection” of the Project to determine whether the Work is substantially complete and has been completed in accordance with the Contract Documents. State Buildings Programs shall be notified of the inspection not less than three (3) business days in advance of the inspection. The Contractor shall provide the Principal Representative and the Architect/Engineer an updated punch list in sufficient detail to fully outline the following:
1. work to be completed, if any; and 2. work not in compliance with the Drawings or Specifications, if any. A final punch list shall be made by the Architect/Engineer in sufficient detail to fully outline to the Contractor:
1. work to be completed, if any;
2. work not in compliance with the Drawings or Specifications, if any; and 3. unsatisfactory work for any reason, if any.
The required number of copies of the final punch list will be countersigned by the authorized representative of the Principal Representative and will then be transmitted by the Architect/Engineer to the Contractor, the Principal Representative, and State Buildings Programs. The Architect/Engineer's final punch list shall control over the Contractor's preliminary punch list.
C. NOTICE OF SUBSTANTIAL COMPLETION Notice of Substantial Completion shall establish the date of substantial Completion of the Project. The Contractor acknowledges and agrees that because the departments, agencies and institutions of the State of Colorado are generally involved with the business of the public at large, greater care must be taken in establishing the date of substantial completion than might otherwise be the case to ensure that a project or building or discrete physical portion of the Work is fully usable and safe for public use, and that such care necessarily raises the standard by which the concept of substantial completion is applied for a public building.
The Notice of Substantial Completion shall not be issued until the following have been fully established:
1. The Notice of Approval of Beneficial Occupancy (SBP-01), if required, has been fully executed;
2. All required building code inspections have been called for and the appropriate code officials have affixed their signatures to the Building Inspection Record indicating successful completion of all required code inspections;
3. All required corrections noted on the Building Inspection Record shall have been completed unless the Architect/Engineer, the Principal Representative and State Buildings Programs, in their complete and absolute discretion, all concur that the condition requiring the remaining correction is not in any way life threatening, does not otherwise endanger persons or property, and does not result in any undue inconvenience or hardship to the Principal Representative or the public;
4. The building, structure or Project can be fully and comfortably used by the Principal Representative and the public without undue interference by the Contractor's, employees and workers during the completion of the final punch list taking into consideration the nature of the public uses intended and taking into consideration any stage or level of completion of HVAC system commissioning or other system testing required by the Specifications to be completed prior to issuance of the Notice of Substantial Completion;
5. The Project has been fully cleaned as required by these General Conditions, and as required by any stricter requirements of the Specifications, and the overall state of completion is appropriate for presentation to the public; and 6. The Contractor has provided a schedule for the completion of each and every item identified on the punch list which specifies the Subcontractor or trade responsible for the work, and the dates the completion or correction of the item will be commenced and finished; such schedule will show completion of all remaining final punch list items within the period indicated in the Contract for final punch list completion prior to Final Acceptance, with the exception of only those items which are beyond the control of the Contractor despite due diligence. The schedule shall provide for a reasonable punch list inspection process. Unless liquidated damages have been specified in Article 54D(2), the cost to the Principal Representative, if any, for re-inspections due to failure to adhere to the Contractor's proposed punch-list completion schedule shall be the responsibility of the Contractor and may be deducted by the Principal Representative from final amounts due to the Contractor.
Substantial completion of the entire Project shall not be conclusively established by a decision by the Principal Representative to take possession and use of a portion, or all of the Project, where portions of the Project cannot meet all the criteria noted above. Notice of Substantial Completion for the entire Project shall, however, only be withheld for substantial reasons when the Principal Representative has taken possession and uses all of the Project in accordance with the terms of Article 40, Right Of Occupancy. Failure to furnish the required completion schedule shall constitute a substantial reason for withholding the issuance of any Notice of Substantial Completion. The Contractor shall have the right to request a final inspection of any discrete physical portion of the Project when in the opinion of the Architect/Engineer a final punch list can be reasonably prepared, without confusion as to which portions of the Project are referred to in any subsequent Notice of Partial Final Settlement which might be issued after such portion is finally accepted. Discrete physical portions of the Project may be, but shall not necessarily be limited to, such portions of the Project as separate buildings where a Project consists of multiple buildings. Similarly, an addition to an existing building where the Project also calls for renovation or remodeling of the existing building may constitute a discrete physical portion of the Project. In such circumstances, when in the opinion of the Principal Representative, the Architect/Engineer and State Buildings Programs, the requirements for issuance of a Notice of Substantial Completion can be satisfied with respect to the discrete portion of the Project, a partial Notice of Substantial Completion may be issued for such discrete physical portion of the Project. The ability to beneficially occupy a discrete physical portion of the Project shall also be considered.
D. NOTICE OF ACCEPTANCE The Notice of Acceptance shall establish the completion date of the Project. It shall not be authorized until the Contractor shall have performed all of the work to allow completion and approval of the Closing-Out Checklist/Final Occupancy Permit (SBP-05). It shall not be authorized until the Contract Close-out Punch- list (SBP-06) shall have been prepared and approved containing no more than ten items of work remaining to be completed or repaired.
Where partial Notices of Substantial Completion have been issued, partial Notices of Final Acceptance may be similarly issued when appropriate for that portion of the Work. Partial Notice of Final Acceptance may also be issued to exclude the work described in Change Order s executed during late stages of the Project where a later completion date for the Change Ordered work is expressly provided for in the Contract as amended by the Change Order, provided the work can be adequately described to allow partial advertisement of any Notice of Partial Final Settlement to be issued without confusion as to the work included for which final payment will be made.
E. SETTLEMENT Final payment and settlement shall be made on the date fixed and published for such payment except as hereafter provided. The Principal Representative shall not authorize final payment until all items on the Close-out Punch-list (SBP-06) have been completed, the Notice of Acceptance issued, and the Notice of Contractors Settlement published. If the work shall be substantially complete d, but final acceptance and completion thereof shall be prevented through delay in correction of minor defects, or unavailability of materials or other causes beyond the control of the Contractor, the Principal Representative in his or her discretion may release to the Contractor such amounts as may be in excess of three times the cost of completing the unfinished work or the cost of correcting the defective work, as estimated by the Architect/Engineer and approved by State Buildings Programs. Before the Principal Representative may issue the Notice of Contractors Settlement and advertise the Project for final payment, the Contractor shall have corrected all items on the punch list except those items for which delayed performance is expressly permitted, subject to withholding for the cost thereof, and shall have:
1. Delivered to the Architect/Engineer:
2. Demonstrated to the operating personnel of the Principal Representative the proper operation and maintenance of all equipment.
Upon completion of the foregoing the Project shall be advertised in accordance with the Notice of Contractor's Settlement by two publications of Notice, the last publication appearing at least ten (10) days prior to the time of final settlement. Publication and final settlement should not be postponed or delayed solely by virtue of unresolved claims against the Project or the Contractor from Subcontractors, suppliers or materialmen based on good faith disputes; the resolution of the question of payment in such cases being directed by statute.
Except as hereafter provided, on the date of final settlement thus advertised, provided the Contractor has submitted a written Notice to the Architect/Engineer that no claims have been filed, and further provided the Principal Representative shall have received no claims, final payment s and settlement shall be made in full. If any unpaid claim for labor, materials, rental machinery, tools, supplies or equipment is filed before payment in full of all sums due the Contractor, the Principal Representative and the State Controller shall withhold from the Contractor on the date established for final settlement, sufficient funds to insure the payment of such claim, until the same shall have been paid or withdrawn, such payment or withdrawal to be evidenced by filing a receipt in full or an order for withdrawal signed by the claimant or his or her duly authorized agent or assignee. The amount so withheld may be in the amount of 125% of the claims or such other amount as the Principal Representative reasonably deems necessary to cover expected legal expenses. Such withheld amounts shall be in addition to any amount withheld based on the cost to compete unfinished work or the cost to repair defective work. However, as provided by statute, such funds shall not be withheld longer than ninety (90) days following the date fixed for final settlement with the Contractor, as set forth in the published Notice of Contractors Settlement, unless an action at law shall be commenced within that time to enforce such unpaid claim and a Notice of such action at law shall have been filed with the Principal Representative and the State Controller. At the expiration of the ninety (90) day period, the Principal Representative shall authorize the State Controller to release to the Contractor all other money not the subject of such action at law or withheld based on the cost to compete unfinished work or the cost to repair defective work.
Notices of Partial Final Settlement may be similarly advertised, provided all conditions precedent have been satisfied as though that portion of the work affected stood alone, a Notice of Partial Acceptance has been issued, and the consent of surety to the partial final settlement has been obtained in writing. Thereafter, partial final payment s may be made to the Contractor subject to the same conditions regarding unpaid claims.
ARTICLE 42. GENERAL WARRANTY AND CORRECTION OF WORK AFTER ACCEPTANCE The Contractor warrants that the materials used and the equipment furnished shall be new and of good quality unless specified to the contrary. The Contractor further warrants that the Work shall in all respects be free from material defects not permitted by the Specifications and shall be in accordance with the requirements of the Contract Documents. Neither the final certificate for payment nor any provision in the Contract Documents shall relieve the Contractor of responsibility for defects or faulty materials or workmanship. The Contractor shall be responsible to the Principal Representative for such warranties for the longest period permitted by any applicable statute of limitations. In addition to these general warranties, and without limitation of these general warranties, for a period of one year after the date of any Notice of Substantial Completion, or any Notice of Partial Substantial Completion if applicable, the Contractor shall remedy defects, and faulty workmanship or materials, and work not in accordance with the Contract Documents which was not accepted at the time of the Notice of Final Acceptance, all in accordance with the provisions of Article 45, One-Year Guarantee And Special Guarantees And Warranties.
ARTICLE 43. LIENS Colorado statutes do not provide for any right of lien against public buildings. In lieu thereof, § 38-26-107, C.R.S., provides adequate relief for any claimant having furnished labor, materials, rental machinery, tools, equipment, or services toward construction of the particular public work in that final payment may not be made to a Contractor until all such creditors have been put on Notice by publication in the public press of such pending payment and given opportunity for a period of up to ninety (90) days to stop payment to the Contractor in the amount of such claims. ARTICLE 44. ONE-YEAR GUARANTEE AND SPECIAL GUARANTEES AND WARRANTIES A. ONE-YEAR GUARANTEE OF THE WORK The Contractor shall guarantee to remedy defects and repair or replace the Work for a period of one year from the date of the Notice Substantial Completion or from the dates of any partial Notices of Substantial Completion issued for discrete physical portions of the Work. The Contractor shall remedy any defects due to faulty materials or workmanship and shall pay for, repair and replace any damage to other work resulting there from, which shall appear within a period of one year from the date of such Notice(s) of Substantial Completion. The Contractor shall also remedy any deviation from the requirements of the Contract Documents which shall later be discovered within a period of one year from the date of the Notice of Substantial Completion; provided, however, that the Contractor shall not be required to remedy deviations from the requirements of the Contract Documents where such deviations were obvious, apparent and accepted by the Architect/Engineer or the Principal Representative at the time of the Notice of Final Acceptance. The Principal Representative shall give Notice of observed defects or other work requiring correction with reasonable promptness. Such Notice shall be in writing to the Architect/Engineer and the Contractor.
The one year guarantee of the Contractor 's work may run separately for discrete physical portions of the Work for which partial Notices of Substantial Completion have been issued, however, it shall run from the last Notice of Substantial Completion with respect to all or any systems common to the work to which more than one Notice of Substantial Completion may apply. This one-year guarantee shall not be construed to limit the Contractor 's general warranty described in Article 42, General Warranty and Correction of Work After Acceptance, that all materials and equipment are new and of good quality, unless specified to the contrary, and that the Work shall in all respects be free from material defects not permitted by the Specifications and in accordance with the requirements of the Contract Documents.
B. SPECIAL GUARANTEES AND WARRANTIES In case of work performed for which product, manufacturers or other special warranties are required by the Specifications, the Contractor shall secure the required warranties and deliver copies thereof to the Principal Representative through the Architect/Engineer upon completion of the work. These product, manufacturers or other special warranties, as such, do not in any way lessen the Contractor 's responsibilities under the Contract. Whenever guarantees or warranties are required by the Specifications for a longer period than one year, such longer period shall govern. ARTICLE 45. GUARANTEE INSPECTIONS AFTER COMPLETION The Architect/Engineer, the Principal Representative and the Contractor together shall make at least two (2) complete inspections of the work after the Work has been determined to be substantially complete and accepted. One such inspection, the “Six-Month Guarantee Inspection,” shall be made approximately six (6) months after date of the Notice of Substantial Completion, unless in the case of smaller projects valued under $500,000 this inspection is declined in Article 54A, Modification of Article 45, in which case the inspection to occur at six months shall not be required. Another such inspection, the “Eleven-Month Guaranty Inspection” shall be made approximately eleven (11) months after the date of the Notice of Substantial Completion. The Principal Representative shall schedule and so notify all parties concerned, including State Buildings Programs, of these inspections. If more than one Notice of Substantial Completion has been issued at the reasonable discretion of the Principal Representative separate eleven month inspections may be required where the one year guarantees do not run reasonably concurrent. Written punch lists and reports of these inspections shall be made by the Architect/Engineer and forwarded to the Contractor, the Principal Representative, State Buildings Programs, and all other participants within ten (10) days after the completion of the inspections. The punch list shall itemize all guarantee items, prior punch list items still to be corrected or completed and any other requirements of the Contract Documents to be completed which were not waived by final acceptance because they were not obvious or could not reasonably have been previously observed. The Contractor shall immediately initiate such remedial work as may be necessary to correct any deficiencies or defective work shown by this report, and shall promptly complete all such remedial work in a manner satisfactory to the Architect/Engineer, the Principal Representative and State Buildings Programs. If the Contractor fails to promptly correct all deficiencies and defects shown by this report, the Principal Representative may do so, after giving the Contractor ten (10) days written Notice of intention to do so. The State of Colorado, acting by and through the Principal Representative, shall be entitled to collect from the Contractor all costs and expenses incurred by it in correcting such deficiencies and defects, as well as all damages resulting from such deficiencies and defects. ARTICLE 46. TIME OF COMPLETION AND LIQUIDATED DAMAGES It is hereby understood and mutually agreed, by and between the parties hereto, that the date of beginning, rate of progress, and the time for completion of the Work to be done hereunder are ESSENTIAL CONDITIONS of this Agreement, and it is understood and agreed that the Work embraced in this Contract shall be commenced at the time specified in the Notice to Proceed (SC-6.26). It is further agreed that time is of the essence of each and every portion of this Contract, and of any portion of the Work described on the Drawings or Specifications, wherein a definite and certain length of time is fixed for the performance of any act whatsoever. The parties further agree that where under the Contract additional time is allowed for the completion of the Work or any identified portion of the Work, the new time limit or limits fixed by such extension of the time for completion shall be of the essence of this Agreement.
The Contractor acknowledges that subject to any limitations in the Advertisement for Bids, issued for the Project, the Contractor's bid is consistent with and considers the number of days to substantially complete the Project and the number of days to finally complete the Project to which the parties may have stipulated in the Agreement, which stipulation was based on the Contractor's bid. The Contractor agrees that work shall be prosecuted regularly, diligently and uninterruptedly at such rate of progress as will ensure the Project will be substantially complete, and fully and finally complete, as recognized by the issuance of all required Notices of Substantial Completion and Notices of Final Acceptance, within any times stipulated and specified in the Agreement, as the same may be amended by Change Order or other written modification, and that the Principal Representative will be damaged if the times of completion are delayed.
It is expressly understood and agreed, by and between the parties hereto, that the times for the Substantial Completion of the Work or for the final acceptance of the Work as may be stipulated in the Agreement, and as applied here and in Article 54D, Modifications of Article 46, are reasonable times for these stages of completion of the Work, taking into such consideration all factors, including the average climatic range and usual industrial conditions prevailing in the locality of the building operations. If the Contractor shall neglect, fail or refuse to complete the Work within the times specified in the Agreement, such failure shall constitute a breach of the terms of the Contract and the State of Colorado, acting by and through the Principal Representative, shall be entitled to liquidated damages for such neglect, failure or refusal, as specified in Article 54D, Modification of Article 46. The Contractor and the Contractor's Surety shall be jointly liable for and shall pay the Principal Representative, or the Principal Representative may withhold, the sums hereinafter stipulated as liquidated damages for each calendar day of delay until the entire Project is 1) substantially complete d, and the Notice (or all Notices) of Substantial Completion are issued, 2) finally complete and accepted and the Notice (or all Notices) of Acceptance are issued, or 3) both. Delay in substantial completion shall be measured from the Date of the Notice to Proceed and delay in final completion and acceptance shall be measured from the Date of the Notice of Substantial Completion. In the first instance, specified in Article 54D(1), Modification of Article 46, liquidated damages, if any, shall be the amount specified therein, for each calendar day of delay beginning after the stipulated number of days for Substantial Completion from the date of the Notice to Proceed, until the date of the Notice of Substantial Completion. Unless otherwise specified in any Supplementary General Conditions, in the event of any partial Notice of Substantial Completion, liquidated damages shall accrue until all required Notices of Substantial Completion are issued.
In the second instance, specified in Article 54D(2), Modification of Article 46, liquidated damages, if any, shall be the amount specified in Article 54D, Modification of Article 46, for each calendar day in excess of the number of calendar days specified in the Contractor 's bid for the Project and stipulated in the Agreement to finally complete the Project (as defined by the issuance of the Notice of Acceptance) after the final Notice of Substantial Completion has been issued. In the third instance, when so specified in both Articles 54D(1) and (2), both types of liquidated damages shall be separately assessed where those delays have occurred. The parties expressly agree that said amounts are a reasonable estimate of the presumed actual damages that would result from any of the breaches listed, and that any liquidated damages that are assessed have been agreed to in light of the difficulty of ascertaining the actual damages that would be caused by any of these breaches at the time this Contract was formed; the liquidated damages in the first instance representing an estimate of damages due to the inability to use the Project; the liquidated damages in the second instance representing an estimate of damages due to the additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period including delivery of any or all guarantees and warranties, the submittals of sales and use tax payment forms, the calling for the final inspection and the completion of the final punch list. The parties also agree and understand that the liquidated damages to be assessed in each instance are separate and distinct, although potentially cumulative, damages for the separate and distinct breaches of delayed substantial Completion or final acceptance. Such liquidated damages shall not be avoided by virtue of the fact of concurrent delay caused by the Principal Representative, or anyone acting on behalf of the Principal Representative, but in such event the period of delay for which liquidated damages are assessed shall be equitably adjusted in accordance with Article 38, Delays And Extensions Of Time. ARTICLE 47. DAMAGES If either party to this Contract shall suffer damage under this Contract in any manner because of any wrongful act or neglect of the other party or of anyone employed by either of them, then the party suffering damage shall be reimbursed by the other party for such damage. Except to the extent of damages liquidated for the Contractor's failure to achieve timely completion as set forth inArticle 46, Time of Completion and Liquidated Damages, the Principal Representative shall be responsible for, and at his or her option may insure against, loss of use of any existing property not included in the Work, due to fire or otherwise, however caused. Notwithstanding the foregoing, or any other provision of this Contract, to the contrary, no term or condition of this contract shall be construed or interpreted as a waiver, express or implied, of any of the immunities, rights, benefits, protection, or other provisions of the Colorado Governmental Immunity Act, Section 24-10-101, et seq., CRS, as now or hereafter amended. The parties understand and agree that liability for claims for injuries to persons arising out of negligence of the State of Colorado, its departments, institutions, agencies, boards, officials and employees is controlled and limited by the provisions of Section 24-10-101, et seq., CRS, as now or hereafter amended and the risk management statutes, Section 24-30-1501, et seq., CRS, as now or hereafter amended. Notice of intent to file a claim under this clause shall be made in writing to the party liable within a reasonable time of the first observance of such damage and not later than the time of final payment, except that in the case of claims by the Principal Representative involving warranties against faulty work or materials Notice shall be required only to the extent stipulated elsewhere in these General Conditions. Claims made to the Principal Representative involving extra cost or extra time arising by virtue of instructions to the Contractor to which Article 36, Claims, applies shall be made in accordance with Article 36. Other claims arising under the Contract involving extra cost or extra time which are made to the Principal Representative under this clause shall also be made in accordance with the procedures of Article 36, whether or not arising by virtue of instructions to the Contractor; provided however that it shall not be necessary to first obtain or request a written judgment of the Architect/Engineer. Provided written Notice of intent to file a claim is provided as required in the preceding paragraph, nothing in this Article shall limit or restrict the rights of either party to bring an action at law or to seek other relief to which either party may be entitled, including consequential damages, if any, and shall not be construed to limit the time during which any action might be brought. Nothing in these General Conditions shall be deemed to limit the period of time during which any action may be brought as a matter of contract, tort, warranty or otherwise, it being the intent of the parties to allow any and all actions at law or in equity for such periods as the law permits. All such rights shall, however be subject to the obligation to assert claims and to appeal denials pursuant to Article 36, Claims, where applicable. ARTICLE 48. STATE'S RIGHT TO DO THE WORK; TEMPORARY SUSPENSION OF WORK; DELAY DAMAGES A. STATE'S RIGHT TO DO THE WORK If after receipt of Notice to do so, the Contractor should neglect to prosecute the Work properly or fail to perform any provision of the Contract, the Principal Representative, after a second seven (7) days' advance written Notice to the Contractor and the Surety may, without prejudice to any other remedy the Principal Representative may have, take control of all or a portion of the Work, as the Principal Representative deems necessary and make good such deficiencies deducting the cost thereof from the payment then or thereafter due the Contractor, as provided in Article 30, Correction Of Work Before Acceptance and Article 33, Payments Withheld, provided, however, that the Architect/Engineer shall approve the amount charged to the Contractor by approval of the Change Order.
B. TEMPORARY SUSPENSION OF WORK The State, acting for itself or by and through the Architect/Engineer, shall have the authority to suspend the Work, either wholly or in part, for such period or periods as may be deemed necessary due to:
1. Unsuitable weather;
2. Faulty workmanship;
3. Improper superintendence;
4. Contractor 's failure to carry out orders or to perform any provision of the Contract Documents; 5: Loss of, or restrictions to, appropriations;
6. Conditions, which may be considered unfavorable for the prosecution of the Work. If it should become necessary to stop work for an indefinite period, the Contractor shall store materials in such manner that they will not become an obstruction or become damaged in any way; and he or she shall take every precaution to prevent damage to or deterioration of the Work, provide suitable drainage and erect temporary structures where necessary.
Notice of suspension of work shall be provided to the Contractor in writing stating the reasons therefore. The Contractor shall again proceed with the work when so notified in writing. The Contractor understands and agrees that the State of Colorado cannot predict with certainty future revenues and could ultimately lack the revenue to fund the appropriations applicable to this Contract. The Contractor further acknowledges and agrees that in such event that State may, upon Notice to the Contractor, suspend the work in anticipation of a termination of the Contract for the convenience of the State, pursuant to Article 50, Termination For Convenience of State. If the Contract is not so terminated the Contract sum and the Contract time shall be equitably adjusted at the time the Principal Representative directs the work to be recommenced and gives Notice that the revenue to fund the appropriation is available.
C. DELAY DAMAGES The Principal Representative and the State of Colorado shall be liable to the Contractor for the payment of any claim for extra costs, extra compensation or damages occasioned by hindrances or delays encountered in the work only when and to the limited extent that such hindrance or delay is caused by an act or omission within the control of the Principal Representative, the Architect/Engineer or other persons or entities acting on behalf of the Principal Representative. Further, the Principal Representative and the State of Colorado shall be liable to the Contractor for the payment of such a claim only if the Contractor has provided required Notice of the delay or impact, or has presented its claim for an extension of time or claim of other delay or other impact due to changes ordered in the work before proceeding with the changed work. Except as otherwise provided, claims for extension of time shall be Noticed and filed in accordance with Article 38, Delays and Extensions of Time, within three (3) business days of the beginning of the delay with any claim filed within seven (7) days after the delay has ceased, or such claim is waived. Claims for extension of time or for other delay or other impact resulting from changes ordered in the Work shall be presented and adjusted as provided in Article 35, Changes in the Work. ARTICLE 49. STATE'S RIGHTS TO TERMINATE CONTRACT A. GENERAL If the Contractor should be adjudged bankrupt, or if he or she should make a general assignment for the benefit of his or her creditors, or if a receiver should be appointed to take over his affairs, or if he or she should fail to prosecute his or her work with due diligence and carry the work forward in accordance with the construction schedule and the time limits set forth in the Contract Documents, or if he or she should fail to subsequently perform one or more of the provisions of the Contract Documents to be performed by him, the Principal Representative may serve written Notice on the Contractor and the Surety on performance and payment bonds, stating his or her intention to exercise one of the remedies hereinafter set forth and the grounds upon which the Principal Representative bases his or her right to exercise such remedy.
In such event, unless the matter complained of is satisfactorily cleared within ten (10) days after delivery of such Notice, the Principal Representative may, without prejudice to any other right or remedy, exercise one of such remedies at once, having first obtained the concurrence of the Architect/Engineer in writing that sufficient cause exists to justify such action.
B. CONDITIONS AND PROCEDURES 1. The Principal Representative may terminate the services of the Contractor, which termination shall take effect immediately upon service of Notice thereof on the Contractor and his or her Surety, whereupon the Surety shall have the right to take over and perform the Contract. If the Surety does not provide Notice to the Principal Representative of its intent to commence performance of the Contract within ten (10) days after delivery of the Notice of termination, the Principal Representative may take over the Work, take possession of and use all materials, tools, equipment and appliances on the premises and prosecute the Work to completion by such means as he or she shall deem best. In the event of such termination of his or her service, the Contractor shall not be entitled to any further payment under the Contract until the Work is completed and accepted. If the Principal Representative takes over the Work and if the unpaid balance of the contract price exceeds the cost of completing the Work, including compensation for any damages or expenses incurred by the Principal Representative through the default of the Contractor, such excess shall be paid to the Contractor. If, however, the cost, expenses and damages as certified by the Architect/Engineer exceed such unpaid balance of the contract price, the Contractor and his or her Surety shall pay the difference to the Principal Representative.
2. The Principal Representative may require the Surety on the Contractor 's bond to take control of the Work and see to it that all the deficiencies of the Contractor are made good, with due diligence within ten (10) days of delivery of Notice to the Surety to do so. As between the Principal Representative and the Surety, the cost of making good such deficiencies shall all be borne by the Surety. If the Surety takes over the Work, either by election upon termination of the services of the Contractor pursuant to Section B(1) of this Article 49, State's Right To Terminate Contract, or upon instructions from the Principal Representative to do so, the provisions of the Contract Documents shall govern the work to be done by the Surety, the Surety being substituted for the Contractor as to such provisions, including provisions as to payment for the Work, the times of completion and provisions of this Article as to the right of the Principal Representative to do the Work or to take control of all or a portion of the Work.
3. The Principal Representative may take control of all or a portion of the Work and make good the deficiencies of the Contractor, or the Surety if the Surety has been substituted for the Contractor, with or without terminating the Contract, employing such additional help as the Principal Representative deems advisable in accordance with the provisions of Article 48A, State's Right To Do The Work; Temporary Suspension Of Work; Delay Damages. In such event, the Principal Representative shall be entitled to collect from the Contractor and his or her Surety, or to deduct from any payment then or thereafter due the Contractor, the costs incurred in having such deficiencies made good and any damages or expenses incurred through the default of Contractor, provided the Architect/Engineer approves the amount thus charged to the Contractor. If the Contract is not terminated, a Change Order to the Contract shall be executed, unilaterally if necessary, in accordance with the procedures of Article 35, Changes In The Work.
C. ADDITIONAL CONDITIONS If any termination by the Principal Representative for cause is later determined to have been improper, the termination shall be automatically converted to and deemed to be a termination by the Principal Representative for convenience and the Contractor shall be limited in recovery to the compensation provided for in Article 50, Termination For Convenience Of State. Termination by the Contractor shall not be subject to such conversion.
ARTICLE 50. TERMINATION FOR CONVENIENCE OF STATE A. NOTICE OF TERMINATION The performance of Work under this Contract may be terminated, in whole or from time to time in part, by the State whenever for any reason the Principal Representative shall determine that such termination is in the best interest of State. Termination of work hereunder shall be effected by delivery to the Contractor of a Notice of such termination specifying the extent to which the performance of work under the Contract is terminated and the date upon which such termination becomes effective.
B. PROCEDURES After receipt of the Notice of termination, the Contractor shall, to the extent appropriate to the termination, cancel outstanding commitments hereunder covering the procurement of materials, supplies, equipment and miscellaneous items. In addition, the Contractor shall exercise all reasonable diligence to accomplish the cancellation or diversion of all applicable outstanding commitments covering personal performance of any work terminated by the Notice. With respect to such canceled commitments, the Contractor agrees to:
1. settle all outstanding liabilities and all claims arising out of such cancellation of commitments, with approval or ratification of the Principal Representative, to the extent he or she may require, which approval or ratification shall be final for all purposes of this clause; and, 2. assign to the State, in the manner, at the time, and to the extent directed by the Principal Representative, all of the right, title, and interest of the Contractor under the orders and subcontracts so terminated, in which case the State shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. The Contractor shall submit his or her termination claim to the Principal Representative promptly after receipt of a Notice of termination, but in no event later than three (3) months from the effective date thereof, unless one or more extensions in writing are granted by the Principal Representative upon written request of the Contractor within such three month period or authorized extension thereof. Upon failure of the Contractor to submit his or her termination claim within the time allowed, the Principal Representative may determine, on the basis of information available to him, the amount, if any, due to the Contractor by reason of the termination and shall thereupon pay to the Contractor the amount so determined.
Costs claimed, agreed to, or determined pursuant to the preceding and following paragraph shall be in accordance with the provisions of § 24-107-101, C.R.S., as amended and associated Cost Principles of the Colorado Procurement Rules as in effect on the date of this Contract. Subject to the preceding provisions, the Contractor and the Principal Representative may agree upon the whole or any part of the amount or amounts to be paid to the Contractor by reason of the termination under this clause, which amount or amounts may include any reasonable cancellation charges thereby incurred by the Contractor and any reasonable loss upon outstanding commitments for personal services which he or she is unable to cancel; provided, however, that in connection with any outstanding commitments for personal services which the Contractor is unable to cancel, the Contractor shall have exercised reasonable diligence to divert such commitments to other activities and operations. Any such agreement shall be embodied in an Amendment to this Contract and the Contractor shall be paid the agreed amount.
The State may from time to time, under such terms and conditions as it may prescribe, make partial payments against costs incurred by the Contractor in connection with the termination portion of this Contract, whenever, in the opinion of the Principal Representative, the aggregate of such payments is within the amount to which the Contractor will be entitled hereunder. The Contractor agrees to transfer title and deliver to the State, in the manner, at the time, and to the extent, if any, directed by the Principal Representative, such information and items which, if the Contract had been completed, would have been required to be furnished to the State, including:
Other than the above, any termination inventory resulting from the termination of the Contract may, with written approval of the Principal Representative, be sold or acquired by the Contractor under the conditions prescribed by and at a price or prices approved by the Principal Representative. The proceeds of any such disposition shall be applied in reduction of any payments to be made by the State to the Contractor under this Contract or shall otherwise be credited to the price or cost of work covered by this Contract or paid in such other manners as the Principal Representative may direct. Pending final disposition of property arising from the termination, the Contractor agrees to take such action as may be necessary, or as the Principal Representative may direct, for the protection and preservation of the property related to this Contract which is in the possession of the Contractor and in which the State has or may acquire an interest.
Any disputes as to questions of fact, which may arise hereunder, shall be subject to the Remedies provisions of the Colorado Procurement Code, §§ 24-109-101, et seq., C.R.S., as amended. ARTICLE 51. CONTRACTOR'S RIGHT TO STOP WORK AND/OR TERMINATE CONTRACT If the Work shall be stopped under an order of any court or other public authority for a period of three (3) months through no act or fault of the Contractor or of any one employed by him, then the Contractor may on seven (7) days' written Notice to the Principal Representative and the Architect/Engineer stop work or terminate this Contract and recover from the Principal Representative payment for all work executed, any losses sustained on any plant or material, and a reasonable profit. If the Architect/Engineer shall fail to issue or otherwise act in writing upon any certificate for payment within ten (10) days after it is presented and received by the Architect/Engineer, as provided in Article 31, Applications For Payments, or if the Principal Representative shall fail to pay the Contractor any sum certified that is not disputed in whole or in part by the Principal Representative in writing to the Contractor and the Architect/Engineer within thirty (30) days after the Architect/Engineer's certification, then the Contractor may on ten (10) days' written Notice to the Principal Representative and the Architect/Engineer stop work and/or give written Notice of intention to terminate this Contract.
If the Principal Representative shall thereafter fail to pay the Contractor any amount certified by the Architect/Engineer and not disputed in writing by the Principal Representative within ten (10) days after receipt of such Notice, then the Contractor may terminate this Contract and recover from the Principal Representative payment for all work executed, any losses sustained upon any plant or materials, and a reasonable profit. The Principal Representative's right to dispute an amount certified by the Architect/Engineer shall not relieve the Principal Representative of the obligation to pay amounts not in dispute as certified by the Architect/Engineer.
ARTICLE 52. SPECIAL PROVISIONS A. CONTROLLER'S APPROVAL CRS 24-30-202(1)
This Contract shall not be deemed valid until it has been approved by the Controller of the State of Colorado or such assistant as he may designate.
B. FUND AVAILABILITY CRS 24-30-202(5.5)
Financial obligations of the State of Colorado payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted, and otherwise made available.
C. INDEMNIFICATION The Contractor shall indemnify and save and hold harmless the State of Colorado and the Principal Representative, its officials, employees and agents, against any and all claims including, but not limited to, suits, actions, damages, liability and court awards including costs, expenses and attorneys fees incurred on account of injuries or damages sustained by any person, persons or property caused in whole or in part by the Contractor, employees, subcontractors, agents or assigns, or as a result of any act or omission, neglect or misconduct by the Contractor, or its employees, agents, subcontractors or assigns, including without limitation, damage to another contractor, neglect in safeguarding the work, defective work or the use of defective materials, but not to the extent such claims are caused by any act or omission of, or breach of contract by, the State, its employees, agents, other contractors or assignees, or other parties not under the control of or responsible to the Contractor.
D. INDEPENDENT CONTRACTOR 4 CCR 801-2 THE CONTRACTOR SHALL PERFORM ITS DUTIES HEREUNDER AS AN INDEPENDENT CONTRACTOR AND NOT AS AN EMPLOYEE. NEITHER THE CONTRACTOR NOR ANY AGENT OR EMPLOYEE OF THE CONTRACTOR SHALL BE OR SHALL BE DEEMED TO BE AN AGENT OR EMPLOYEE OF THE STATE. CONTRACTOR SHALL PAY WHEN DUE ALL REQUIRED EMPLOYMENT TAXES AND INCOME TAX AND LOCAL HEAD TAX ON ANY MONIES PAID BY THE STATE PURSUANT TO THIS CONTRACT. CONTRACTOR ACKNOWLEDGES THAT THE CONTRACTOR AND ITS EMPLOYEES ARE NOT ENTITLED TO UNEMPLOYMENT INSURANCE BENEFITS UNLESS THE CONTRACTOR OR THIRD PARTY PROVIDES SUCH COVERAGE AND THAT THE STATE DOES NOT PAY FOR OR OTHERWISE PROVIDE SUCH COVERAGE. CONTRACTOR SHALL HAVE NO AUTHORIZATION, EXPRESS OR IMPLIED, TO BIND THE STATE TO ANY AGREEMENTS, LIABILITY, OR UNDERSTANDING EXCEPT AS EXPRESSLY SET FORTH HEREIN. CONTRACTOR SHALL PROVIDE AND KEEP IN FORCE WORKERS' COMPENSATION (AND PROVIDE PROOF OF SUCH INSURANCE WHEN REQUESTED BY THE STATE) AND UNEMPLOYMENT COMPENSATION INSURANCE IN THE AMOUNTS REQUIRED BY LAW, AND SHALL BE SOLELY RESPONSIBLE FOR THE ACTS OF THE CONTRACTOR, ITS EMPLOYEES AND AGENTS.
E. NON-DISCRIMINATION The Contractor agrees to comply with the letter and the spirit of all applicable state and federal laws respecting discrimination and unfair employment practices.
F. CHOICE OF LAW; NO ARBITRATION The laws of the State of Colorado and rules and regulations issued pursuant thereto shall be applied in the interpretation, execution and enforcement of this Contract without application of any choice of law rules that would apply the laws of any other state. Any provision of this Contract, whether or not incorporated herein by reference, which provides for arbitration by any extra-judicial body or person or which is otherwise in conflict with said laws, rules and regulations shall be considered null and void. Nothing contained in any provision incorporated herein by reference or otherwise which purports to negate this Article 52F prohibition regarding arbitration in whole or in part shall be valid or enforceable or available in any action at law whether by way of complaint, defense or otherwise. Any provision rendered null and void by the operation of this provision will not invalidate the remainder of the Contract to the extent that the Contract is capable of execution.
The non-binding facilitation of negotiation of disputes and disagreements provided for generally in Article 39, Non-Binding Dispute Resolution — Facilitated Negotiations, shall not be construed as providing for arbitration. If as a result of any partnering agreement, other forms of voluntary non-binding alternative dispute resolution are subsequently incorporated by Amendment, such as non-binding mediation, such dispute resolution processes shall also be not deemed to be arbitration. At all times during the performance of this Contract, the Contractor shall strictly adhere to all applicable federal and State laws, rules, and regulations that have been or may hereafter be established.
G. VENDOR OFFSET SYSTEM CRS 24-30-202(1) & CRS 24-30-202.4 Pursuant to C.R.S. § 24-30-202.4, (as amended), the State Controller may withhold debts owed to State agencies under the vendor offset intercept system for: (a) unpaid child support debt or child support arrearages; (b) unpaid balances of tax, accrued interest, or other charges specified in Article 22, Title 39, C.R.S.; (c) unpaid loans due to the Student Loan Division of the Department of Higher Education; (d) owed amounts required to be paid to the Unemployment Compensation Fund; and (e) other unpaid debts owing to the State or agency thereof, the amount of which is found to be owing as a result of final agency determination or reduced to judgment as certified by the State Controller.
H. EMPLOYEE FINANCIAL INTEREST CRS 24-18-201 & CRS 24-50-507 The signatories aver that to their knowledge, no employee of the State of Colorado has any personal or beneficial interest whatsoever in the service or property described herein. ARTICLE 53. MISCELLANEOUS PROVISIONS A. CONSTRUCTION OF LANGUAGE The language used in these General Conditions shall be construed as a whole according to its plain meaning, and not strictly for or against any party. Such construction shall, however, construe language to interpret the intent of the parties giving due consideration to the order of precedence noted in Article 2C, Intent of Documents.
B. SEVERABILITY If any covenant, term, condition, or provision contained in these General Conditions is held by a court of competent jurisdiction to be invalid, illegal, or unenforceable in any respect, such covenant, term, condition, or provision shall be severed or modified to the extent necessary to make it enforceable, and the resulting General Conditions shall remain in full force and effect, and such invalidity or other failure shall not affect the validity of any other covenant, term or provision hereof. Provided the same does not work a substantial injustice, these General Conditions shall be construed as if such invalid portion had not been inserted.
C. SECTION HEADINGS The section or paragraph headings contained within these General Conditions are inserted for convenience only and shall not be construed to vary or add to the meaning of this Contract.
D. AUTHORITY Each person executing the Agreement and its Exhibits in a representative capacity expressly represents and warrants that he or she has been duly authorized by one of the parties to execute the Agreement and has authority to bind said party to the terms and conditions hereof.
E. INTEGRATION OF UNDERSTANDING This Contract is intended as the complete integration of all understandings between the parties and supercedes all prior negotiations, representations, or agreements, whether written or oral. No prior or contemporaneous addition, deletion, or other amendment hereto shall have any force or effect whatsoever, unless embodied herein in writing. No subsequent novation, renewal, addition, deletion, or other amendment hereto shall have any force or effect unless embodied in a written Change Order or Amendment to this Contract.
F. VENUE The parties agree that venue for any action related to performance of this Contract shall be an appropriate District Court of the State of Colorado.
G. NO THIRD PARTY BENEFICIARIES Except as herein specifically provided otherwise, this Contract shall inure to the benefit of and be binding upon the parties hereto and their respective successors and assigns. The enforcement of the terms and conditions of this Contract and all rights of action relating to such enforcement, shall be strictly reserved to the parties to the Agreement. Nothing contained in the Contract Documents shall give or allow any claim or right of action whatsoever by any other person or entity as beneficiary; all such non-parties shall be deemed incidental beneficiaries only.
H. WAIVER The waiver of any breach of a term hereof shall not be construed as a waiver of any other term, of the same term upon subsequent breach.
ARTICLE 54. OPTIONAL PROVISIONS AND ELECTIONS The provisions of this Article 54 alter the preceding Articles or enlarge upon them as indicated: The Principal Representative and or the State Buildings Programs shall mark boxes and initial where applicable.
A. MODIFICATION OF ARTICLE 45. GUARANTEE INSPECTIONS AFTER COMPLETION If the box below is marked the six month guarantee inspection is not required. ? __________ Principal Representative initial B. MODIFICATION OF ARTICLE 27. LABOR AND WAGES If the box is marked the Federal Davis-Bacon Act shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents.
C. MODIFICATION OF ARTICLE 39. NON-BINDING DISPUTE RESOLUTION -FACILITATED NEGOTIATIONS If the box is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non-Binding Dispute Resolution — Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000. ? __________ Principal Representative initial D. MODIFICATION OF ARTICLE 46. TIME OF COMPLETION AND LIQUIDATED DAMAGES If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of Article 46, Time Of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages only to the extent noted.
E. NOTICE IDENTIFICATION All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.