8 CCR 1302-12
BE IT RESOLVED BY THE STATE HOUSING BOARD OF THE STATE OF COLORADO; THAT PURSUANT TO §24-32-3301 et seq C.R.S. as amended, the State Housing Board of the State of Colorado (the “Housing Board”) repeals and readopts Resolution #34 Factory Built Housing; and THAT PURSUANT TO §24-32-3301 et seq C.R.S. as amended, the Housing Board adopts the nationally recognized code as cited in SCHEDULE “B” as the “Colorado Construction Safety Code for Factory Built Housing”, and THAT PURSUANT TO §24-32-3301 et seq C.R.S. as amended, the Housing Board states the basis and purpose of these rule changes is to update the current minimum construction and safety code for “Factory Built Housing” manufactured, sold, or offered for sale in Colorado; and THAT PURSUANT TO §24-32-3301 et seq C.R.S. as amended, the Housing Board establishes standards, to the extent allowed by the state constitution, Article 50 of the “State Personnel System Act”, and the rules promulgated by the Personnel Board, for private inspection and certification entities to perform the Colorado Division of Housing's certification and inspection of in-state and out-of-state Factory Built Housing; and THAT PURSUANT TO §24-32-3301 et seq C.R.S. as amended, the Housing Board states that “Factory Built Housing” manufacturers shall have the option to contract with the Colorado Division of Housing or an authorized inspection agency to perform inspection and certification functions; and The Housing Board states that these rules do not include later amendments to or editions of the nationally recognized code; and The Housing Board repeals and readopts these rules and regulations to be administered and enforced by the Colorado Division of Housing (the Division of Housing). RULES AND REGULATIONS Section 1: SCOPE Every Factory-Built Housing Unit manufactured after the effective date of these regulations that is manufactured, sold, or offered for sale in this state must display an insignia issued by the Division of Housing certifying that the unit is constructed in compliance with the standards adopted in schedule “B” which is incorporated herein and made a part of these Rules and Regulations by reference, and all other requirements set forth by this resolution.
The Housing Board states that the Program Manager, Technology and Standards Section, Colorado Division of Housing, 1313 Sherman Street, Room 518, Denver, Colorado 80203, will provide information regarding how the codes adopted in Schedule “B” may be obtained or examined. Homes constructed under Schedule “B” do not include units built to the Federal Manufactured Home Construction and Safety Standards (HUD Standards). Incorporated material may also be examined at any state publications depository library.
Section 2: DEFINITIONS “ADMINISTRATIVE AGENCY” is the Colorado Division of Housing. The Division of Housing is the state agency responsible for enforcing the Factory-Built Housing Construction Statutes. “AUTHORIZED INSPECTION AGENCY” means the Division of Housing or any state, firm, corporation or entity approved by the Division of Housing to conduct production inspections and to evaluate the manufacturer's quality control procedures.
“FACTORY-BUILT HOUSING” is a unit or component built in compliance to the series of codes listed in Schedule “B”. These units are designed primarily for residential occupancy, either permanent or temporary (as determined by the local building department), which is wholly or in substantial part, made, fabricated, formed or assembled in a manufacturing facility for installation, or assembly and installation, on permanent or temporary foundations at the building site. “INSIGNIA” means a seal, label or tag issued by the Division of Housing to indicate compliance in the manufacture of a unit with the regulations established by the Housing Board. “INSIGNIA FEES” cover commensurate expenses incurred by the Division of Housing in evaluating the performance of authorized inspection agencies and in carrying out inspections, administration and enforcement of the Factory-Built Housing Program.
“INTERIM CHANGE” is a change made between the approval date and the expiration date. “MANUFACTURER” means any person who constructs or assembles a manufactured residential or nonresidential structure in a factory or other off-site location. “MODEL” is a specific design of factory-built units designed by the manufacturer, which is based on size, floor plan, method of construction,, location arrangement and sizing of plumbing, mechanical or electrical equipment and systems therein in accordance with plans submitted to the Division of Housing. “PRODUCTION INSPECTION” means the evaluation of the ability of the manufacturing facility to follow approved plans, standards, codes and quality control procedures during continuing production. “PROHIBITED SALE NOTICE” means a printed notification issued by the Division of Housing for a structure on a dealer's lot providing that the unit may not be sold or offered for sale because of imminent safety hazards as set forth in §24-32-703 (3.8) C.R.S., as amended and these regulations. “QUALITY CONTROL PROCEDURES” means procedures prepared by a manufacturer for each of its manufacturing facilities and approved by the Division of Housing describing the method that the manufacturer uses to assure units produced by that manufacturer are in conformance with the applicable standards, codes, quality control procedures and approved plans. “A RED TAG NOTICE” is a physical identification that a particular unit, in the manufacturing process, has a life threatening violation as set forth in §24-32-703 (3.8). Units with life threatening deviations shall not be sold or offered for sale in Colorado.
“UNIT” means a factory-built house that shall comply with these rules and regulations Section 3: PROGRAM PARTICIPANTS States This program is open on a voluntary basis to all states with statutory authority to regulate the design and construction of Factory Built Housing covered by this Division of Housing Resolution. Each state that wishes to participate in this program recognizes that they must enter into a memorandum of understanding with Colorado to establish mutual recognition and acceptance of codes and inspections. Areas of agreement include:
● Performance of plant certifications and other inspection requirements. Routine inspections include performing inspections of at least one (1) unit in each phase of manufacturing and performing a minimum of a rough, final and other or inspections and/or tests (as required in Schedule “B”) when a production line process is not being utilized. Also to place the manufacturer on a higher frequency of inspection when it is unable to conform, on a continuing basis, to approved quality control procedures and or approved plans and standards. ● Evaluation, at the manufacturing facility, of problems resulting from consumer complaints on labeled Colorado units; work with the manufacturers) in resolving such complaints by adequately following-up and assisting them in correcting their production and/or inspection process. ● Provide sixty (60) days notice before withdrawing from participation in the program, thereby allowing a manufacturer sufficient time to obtain an Authorized Inspection Agency. PARTICIPATING STATES OPERATING UNDER AN EXISTING STATE FACTORY BUILT HOUSING LAW HAVE THE OPTION TO ACT AS THE AUTHORIZED INSPECTION AGENCY WITHIN THEIR STATE. They are not required to change any of their state fees, laws, or regulations other than those changes, which maybe necessary to allow them to agree to the above items. Manufacturers are required to be inspected by their host state when this state agrees to perform inspections on Colorado units. Manufacturers Any manufacturer of Factory Built Housing products that are sold or offered for sale in Colorado may participate in this program provided they agree and comply with the following: ● All certified in-state manufacturers shall have the option to contract with an Authorized Inspection Agency or continue to use the Division of Housing as the Authorized Inspection Agency to perform certifications, in-plant production inspections and to evaluate their plant's quality control procedures.
● Out of state manufacturers not previously certified are required to immediately obtain the services of an Authorized Inspection Agency to perform certifications, in-plant production inspections and to evaluate the plant's quality control procedures. ● Out of state manufacturers with existing plant certifications must obtain the services of an Authorized Inspection Agency to conduct certifications, in- plant production inspections and to evaluate the plant's quality control procedures.
● Out of state manufacturers located in states that have reciprocity or other agreements with the Division of Housing shall be notified if the state in which they are located will continue to inspect Colorado units or if they have to obtain the services of a firm or corporation to perform certification and in plant production inspections of Colorado units. ● After notification that the state in which they are located will no longer inspect Colorado units, manufacturers have (60) days to obtain another Authorized Inspection Agency. ● Out of state manufacturers located in states that enter into an agreement with Colorado to inspect Colorado units, shall use that state as the Authorized Inspection Agency to perform certifications, in-plant production inspections and evaluations of their quality control procedures. ● Out of state manufacturers located in states that do not inspect Colorado units, shall obtain the services of an Authorized Inspection Agency to perform certifications, in-plant production inspections and evaluations of their quality control procedures. ● All manufacturers shall obtain prior approval from the Division of Housing for all quality control manuals and plans before manufacturing and affixing the Colorado and Authorized Inspection Agency label to units constructed under those plans.
● All manufacturers shall allow and pay for the reasonable costs incurred by the Division of Housing for work related to retaining and evaluating their performance and certification. ● All manufacturers shall allow and pay for periodic oversight inspections by the Authorized Inspection Agency to assure compliance to the approved designs. ● All manufacturers shall permit Division of Housing monitoring personnel to review plans and to perform in plant inspections.
● All manufacturers shall correct any code violations in plans discovered by the Division of Housing or by the Authorized Inspection Agency monitoring personnel, or forfeit the right to have Division of Housing and Authorized Inspection Agency labels affixed. ● All manufacturers shall correct any construction code violations within 20-days, or forfeit the right to have Division of Housing labels affixed.
● All manufacturers must provide the Division of Housing with a monthly inspection report showing the Authorized Inspection Agency and the Division of Housing label number (s), unit serial number(s), and the first destination.
● All manufacturers shall submit a fully completed oversight inspection data sheet to the Division prior to shipment of the home from the factory.
Manufacturer Certification Procedures and Performance Requirements Manufacturers of Factory Built Housing which are manufactured, sold, or offered for sale in the State of Colorado may be certified. Plant certification is granted to a manufacturer based on adequate plant production performance, for a specific plant location, and is not transferable to other locations including those of the same manufacturer.
At the time of plan submittal all manufacturers are required to inform the Division of Housing, in writing, of the state, firm, corporation or entity that will conduct the certification and in-plant inspections of Colorado units. Additionally, manufacturers are also required to notify the Division of Housing thirty (30) days prior to any subsequent change of their Authorized Inspection Agency. Upon Division of Housing approval of the Authorized Inspection Agency, approved copies of the plans and quality assurance manual shall be sent to the manufacturer. Upon the manufacturer's receipt of the approved plans and manual, the Authorized Inspection Agency shall schedule plant certification inspections.
Upon completion of certification inspections, a letter recommending plant certification and a copy of the certification inspection report is faxed by the Authorized Inspection Agency to the Division of Housing with a copy to the manufacturer. Upon receipt of this report, the Division of Housing will review it for completeness and accuracy. The manufacturer can then ship this certification unit(s) to Colorado for field inspection by the Division of Housing. After field inspection, the Division of Housing will notify the manufacturer if the unit has passed inspection and if the plant is certified or not certified. Manufacturers are required to construct, on a continuing basis, factory built housing in conformance with plans, quality control manual, codes standards and procedures prepared by them and approved by the Division of Housing. The certification of a plant is considered to be ongoing unless conditions warrant removal of the certification. Conditions for removal of certification are: ● The change of an Authorized Inspection Agency. D The change of a plant location. ● Where a plant has had Division of Housing and Authorized Inspection Agency labels removed by the Authorized Inspection Agency pursuant to the Division of Housing procedures. Manufacturers demonstrating that they cannot perform within their approvals shall be placed on a higher frequency of inspection until their performance improves. If their performance does not improve, the manufacturer may have their Division of Housing certification revoked. In accordance with C.R.S. 24-32-3307, the State Director of Housing may pursue injunctive relief against manufacturers that fail to construct homes in accordance with their approved plans and quality control manual, fail to correct code violations, fail to comply with C.R.S. 24-32-Part 33, or fail to comply with these rules.
Manufacturer Recertification Requirements The initial plant certification last for six (6) months. Prior to the end of the initial certification, recertification is required which will last for twelve (12) months. Each manufacturer is required to resubmit their quality control manual (and when applicable, plans) for approval prior to the certification expiration date that is stamped on the quality control manual. This shall be complied with regardless of when plans are approved or homes shipped. Failure to comply with this requirement shall result in the plant having to comply with the initial certification inspection requirements. Section 4: AUTHORIZED INSPECTION AGENCIES Authorized Inspection Agency Approval All manufacturers that use agencies to perform production inspections shall have such agencies, other than states, request approval from the Division of Housing as an inspection agency for the State of Colorado. Request from firms, corporations or other entities shall contain the following minimum requirements:
● A list of key personnel, with resumes, indicating their primary functions or duties. ● The number of years the agency has actively engaged in the business for which they seek approval. [] A statement by the agency that it will adhere to all the requirements of the Division of Housing.
● An explanation of the agency plant certification and inspection procedures, including copies of the quality assurance and other inspection reports.
● Agree to furnish any other information that the Division of Housing may deem necessary in order to properly evaluate and grant approval.
● A statement that the submitting firm, corporation or entity is independent and does not have any actual or potential conflict of interest and is not affiliated with or influenced or controlled by any present or potential client manufacturer in any manner which might effect its capacity to render service or reports of findings objectively and without bias. ● The request must contain the signature of a responsible officer, owner, or partner of the submitting agency.
● A list of the factory built (UBC) housing manufacturers that are currently inspected. Authorized Inspection Agency Qualifications An Authorized Inspection Agency shall have the following requirements. Any exceptions shall have prior approval by the Division of Housing.
● States - Must have existing statutory authority to regulate the design and construction of Factory Built Housing.
● Firms, corporations or other entities -Must currently be listed with a national listing agency such as National Evaluation Services Inc., U. S. Testing, Underwriters Laboratories, Inc., PFS Corporation, Factory Mutual, Warnock Hersey, etc.
After reviewing the request, the Division of Housing will notify the requesting firm, corporation or entity of their acceptance or denial as an Approved Inspection Agency for Colorado. Authorized Inspection Agency Quality Control and Reporting Requirements Authorized Inspection Agencies shall conduct certifications, in-plant production inspections and in-plant evaluations of the plant's quality control procedures in accordance with Division of Housing approved documents.
Upon approval of the inspection agency by the Division of Housing, approved copies of the plans and quality assurance manual shall be sent to the manufacturer. Upon the manufacturer's receipt of the approved plans and manual, the Authorized Inspection Agency shall schedule plant certification inspections.
The structure will be inspected to the approved plans, except where the plans are not specific, and then the inspection shall be to the standards. The Authorized Inspection Agency will also monitor the personnel performing the approved quality control procedures.
The Authorized inspection Agency shall use a graduate engineer and an inspector to conduct certification inspections. If the first structure inspected fails to conform to the approved plans or fails to conform with respect to any aspect of the standards or codes, and if the approved quality control procedures are not complied with, additional units shall be similarly inspected until the Authorized Inspection Agency is satisfied that the manufacturer is capable of consistently manufacturing units to the approved plans and codes.
Upon completion of certification inspections, a letter recommending plant certification and a copy of the certification inspection report is faxed by the Authorized Inspection Agency to the Division of Housing with a copy to the manufacturer. Upon receipt of this report, the Division of Housing will review it for completeness and accuracy. The manufacturer can then ship this certification unit(s) to Colorado for field inspection by the Division of Housing. After field inspection, the Division of Housing will notify the manufacturer if the unit has passed inspection and if the plant is certified or not certified. After certification, routine inspections shall consist of the Authorized Inspection agency inspecting a minimum of one (1) phase of construction for each unit being produced for Colorado. A minimum of a rough, final and other inspections (as required in Schedule “B”) must be conducted when a production line process is not being utilized. In the course of each visit, the inspector shall also make a complete inspection of every phase of production, and of every unit, which is in each stage of production, and a random sampling of finished product when available.
Whenever the Authorized Inspection Agency finds that a manufacturer is unwilling or unable to conform on a continuing basis to the approved quality control procedures, and/or approved plans or standards, that manufacturing facility shall be placed on a higher frequency of inspection. The Division of Housing shall be notified and the labels held until the manufacturer demonstrates that he can perform within his approvals. If after three consecutive inspections, the last inspection still indicates that the manufacturer is not able to perform within his approvals or standards, all remaining insignias paid for by the manufacturer will be returned to the Division of Housing and no further insignias issued until problems are resolved. The inspection agency shall notify the Division of Housing of the action taken. Additional information, such as increased frequency and routine quality assurance inspection reports, will be requested by the Division of Housing in order to review the inspections conducted on specific units. The Authorized Inspection Agency is required to provide its own inspection label to the manufacturer so that it, also, can be affixed to each unit shipped to Colorado. Division of Housing Monitoring of Authorized Inspection Agencies The performance of all Authorized Inspection Agencies shall be monitored by Division of Housing to determine if they are fulfilling their responsibilities as required under this program. The monitoring activities carried out by the Division of Housing staff shall consist of: ● Performing oversight inspections on homes that are shipped to Colorado. The purpose of these certification and other inspections are to evaluate the performance of the manufacturer and inspection agency in ensuring the selected homes comply with approved plans and construction codes.
● Reviewing all records of interpretations of the standards made by the Authorized Inspection Agency to determine whether they are consistent.
Applications shall be made on forms supplied by the Division of Housing and shall be accompanied by the appropriate fees from Schedule “A” which is incorporated herein and made a part of these Rules and Regulations by reference.
Submittal for approval of quality control manuals and model plans shall meet or exceed the minimum requirements as specified by the Division of Housing.
All applications submitted shall be signed by an officer of the manufacturer that is in a responsible position with the authority to commit manufacturers to comply with the rules and regulations that govern the Colorado Factory Built Housing Construction Program. The Division of Housing will grant or deny approval within twenty (20) working days of the receipt of a complete submittal with the appropriate fee and with the required number of copies. If a submittal is not completed within one hundred twenty days of the initial application date, the application shall expire and all fees shall be forfeited Expired applications must be resubmitted as new applications with new application forms, submittals and fees. Approved plans and quality control manuals shall be evidenced by the stamp of approval of the Division of Housing. One approved copy shall be returned to the manufacturer and shall be retained at the place of manufacture. An additional approved copy shall be kept on file with the Division of Housing. Interim changes, additions, or deletions will not be acceptable without prior approval of the Division of Housing. All units, which are manufactured, sold, or offered for sale in the State of Colorado must display the Division of Housing and Authorized Inspection Agency insignias. These insignias certify that the unit is constructed in compliance with applicable codes and regulations adopted by the State Housing Board. The granting of plan approval shall not be construed to be a permit or approval of any violation of the provisions of these regulations. All structures shall be subject to Division of Housing field inspection. The approval of the plans shall not prevent the Division of Housing or other Division of Housing authorized inspection agencies from requiring the correction of errors found in the plans or the unit itself, when found in violation of these regulations.
Approved copies of the quality control manual and plans shall be kept on file within the plant of manufacture for the purpose of construction and inspection by Division of Housing inspectors or the Approved Inspection Agency.
Plan approvals are granted to a manufacturer for a specific plant location and are not transferable to other locations including those of the same manufacturer.
Interim plan change approvals shall be required where the manufacturer proposes a change in plumbing, heating, electrical, and/or fire life safety systems. Such changes shall become part of the approved plan unless the Division of Housing determines that the change constitutes a new model. If determined a new model, the interim change shall be processed as a new application. The difference in fees will be assessed.
Where there is a change in ownership, address, or location of manufacture, the manufacturer having Division of Housing certification shall notify the Division of Housing within ten (10) working days of such a change. At such time the Division of Housing shall review the performance of the manufacturer and transfer or revoke the certification.
When amendments to these regulations require changes to be made to an approved plan, the Division of Housing shall notify the manufacturer of the requirement and shall allow the manufacturer a reasonable time to submit revised plans for approval. Revised plans shall be processed as interim changes with the appropriate fees assessed.
Some building departments require a set of prints with the Colorado approval stamp. This can be addressed by requesting that additional prints be approved and provided to them at the time of original application. Appropriate fees must accompany the requests for additional prints. Section 6: PLANT/PLAN/QUALITY CONTROL CERTIFICATION EXPIRATION DATE The initial plant certification last for six (6) months. Prior to the end of the initial certification, recertification is required which will last for twelve (12) months. Each manufacturer is required to resubmit their quality control manual (and when applicable, plans) for approval prior to the certification expiration date that is stamped on the quality control manual. Failure to comply with this requirement shall result in the plant having to comply with the initial certification inspection requirements. The certification expiration date for all plants is determined by the expiration date that is stamped on the quality control manual. Plans that are submitted at the time of certification and/or within the certification period shall have the same certification expiration date as the quality control manual It shall be the responsibility of the manufacturer to submit to the Division of Housing an application for plan and quality control manual approval thirty (30) days prior to the expiration date. Section 7: PLANT CERTIFICATION AND INSPECTIONS FEES The Division of Housing and/or the Authorized Inspection Agency shall conduct certification and production inspections of all manufacturers engaged in the manufacturing or offering for sale of Factory- Built Housing Units in the State of Colorado. This inspection shall include the quality control program and systems testing.
Prohibited Sale Notice When a unit is posted with a Prohibited Sale Notice, the Division of Housing or the Authorized Inspection Agency will notify the manufacturer and the dealer that the structure contains a violation(s). ● A unit posted with a Prohibited Sale Notice, shall not be sold or offered for sale in the State of Colorado, nor shall the unit be moved or caused to be moved without the prior written approval of the Division of Housing.
Red Tag Notice A Red Tag Notice is a physical identification that a particular unit, in the manufacturing process, has a life threatening violation. When a unit is posted with a Red Tag Notice, the Division of Housing or the Authorized Inspection Agency inspector will notify the manufacturer that the unit contains a code violations).
Prohibited Sale Notices and Red Tag Notices shall be removed only by an authorized representative of the Division of Housing.
Section 9: REVOCATION OF PLANT CERTIFICATIONS The Housing Board may revoke a plant certification after notice and hearing pursuant to Section 24-4-104 & 24-4-105, C.R.S., whenever a manufacturer has violated any provision of these regulations or when a plant certification was granted in error, on the basis of incorrect information supplied by the applicant. Judicial review of plant certification revocation actions shall be governed by Section 24-4-106, C.R.S. Section 10: DENIAL OF PLANT CERTIFICATION The Division of Housing may deny an application for plant certification or re- certification if an applicant manufactures any unit in violation of Division approved plans or these rules and regulations. In addition, as a condition of certification or re- certification, the Division of Housing may impose any of the following conditions for certification or re-certification:
The Division shall promptly notify the applicant of the denial or condition imposed. The applicant may, within sixty (60) days following such action, request a hearing before the Housing Board. If requested, a hearing shall be conducted pursuant to Section 24-4-105, C.R.S. Thereafter, the final decision of the Housing Board shall be subject to judicial review in accordance with Section 24-4-106, C.R.S. Section 11: CERTIFICATION INSIGNIA APPLICATION AND REPORTS Following the receipt of the Plant Certification Inspection Certificate, application for Colorado insignias must be submitted on forms provided by the Division of Housing with the appropriate fees from Schedule “A”.
Insignias are assigned for use at a specific plant location and shall not be transferable or used on an unapproved model. Colorado certification insignias issued for one type of certification may not be used on a unit of another (different) type. A 3' × 5' primary insignia, documenting manufacturer and unit design information, is required for the first section of a home. Each additional habitable floor section requires a 2' × 2' “Additional Floor Tag” insignia.
The primary Insignia must be permanently affixed inside the kitchen sink cabinet or inside the vanity cabinet if there is no kitchen sink, prior to units being removed from the plant. Additional Floor Tag insignias are to be permanently affixed and located directly under the primary insignia. The manufacturer shall legibly stamp the unit serial number, date of manufacture, wind design load and roof design load on the primary insignia.
Insignia reports shall be submitted by the manufacturer to the Division of Housing by the first of each month on forms or copies of forms supplied by the Division of Housing. An insignia report is required when the manufacturer has insignias outstanding during that period. Manufacturers are also required to provide the Division of Housing a copy of their monthly production report. Corrected or delinquent insignia reports may be required prior to the issuance of additional insignias. Primary Insignias are to be affixed in consecutive order. Colorado insignias shall remain the property of the State of Colorado and may be confiscated by the Division of Housing upon any violation of this resolution. Defaced, marked in error, or voided insignias shall be returned to the Division of Housing without refund. ATTEST:
1302_12_1.jpg SCHEDULE “A” FEE SCHEDULE All fees, except inspection fees, are due in advance and must accompany the application. Fees shall not be subject to refund.
Out of-State: $50.00 Hour/per inspector plus trip expenses of travel, food, lodging, parking, car rental, etc. as allowed in state fiscal rules for per diem and travel.
The State Housing Board adopts the following nationally recognized codes as the “Colorado Construction Safety Code for Factory-Built Housing”.
Factory-Built Housing Construction Code of the State of Colorado Shall be:
Transition Period: Manufacturers shall be permitted to use the construction codes in effect prior to the adoption of this resolution for a maximum of 90-days after this resolution takes effect. AMENDMENTS:
The following amendments by addition, deletion, revision and exceptions are made: INTERNATIONAL BUILDING CODE:
Section 901.5.1 Add the Mowing Section:
Special inspector required. All fire protection systems required by this Chapter shall be inspected and approved by a special inspector. The inspector shall be an employee of the fire department having jurisdiction or another qualified individual with prior approval of DOH.. Inspections and approvals will be regulated under Chapter 17 of this Code.
Section 1507.2.8.2. Ice dam Membrane is amended to read: “Regardless of roof slope or material, when the snow load is above sixty five pounds per square foot (651b./sq.ft.), roofing underlayment shall be two layers of Type l5 felt applied shingle fashion and solid mopped together with approved cementing material between the plies, or 40 mil listed self adhering roofing membrane and shall be installed extending from the eave up the roof to a point 8 feet 6 inches inside the exterior wall line of the building and shall extend continuously to a point 4 feet from any valley, cricket or similar construction junctions with roofs.
Section 1608.2. Ground Snow Load is amended to read:
Roof Snow Load design criteria will be in accordance with a pamphlet entitled, 1989 Survey of Colorado Building Departments, dated May 1990, prepared by the Structural Engineers Association of Colorado with a minimum Snow Load design criteria of 30 psf. To calculate ground snow load use the roof snow load × 0.833 = Ground Snow Load. The 15% adjustment for wood and mechanical fastening for duration, as for snow, may not be taken when the snow load is 65 lb. per sq. ft. or above. Section 1609.1.1. Add the Following:
Wind Load design criteria will be in accordance with a pamphlet entitled, 1989 Survey of Colorado Building Departments, dated May 1990, prepared by the Structural Engineers Association of Colorado with a minimum Wind Load design criteria of 90 mph, Exposure C, unless otherwise justified. Section 2111.1.1. New Fireplaces – Add the following section: Every new fireplace shall have permanently installed one of the following:
INTERNATIONAL RESIDENTIAL CODE:
TABLE R301.2(l) IS AMENDED TO READ:
a CATEGORY LOAD WEATHERING d TERMITE DECAY FROST LINE DEPTH
cThe outdoor design dry-bulb temperature shall be selected from the columns of 971/2- percent values for winter from Appendix D of the International Plumbing Code. Deviations from the Appendix D temperatures shall be permitted to reflect local climates or local weather experience as determined by the local building official. dThe mean annual temperature from the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32° Fahrenheit)” at www.ncdc.noaa.gov/frjsf.html.
Section R301.5 - Live Loads ... is amended by deleting exterior balconies, decks and fire escapes from the table and by adding footnote (g) to read as follows:
Section R802.2 – Design and Construction ... is amended to read as follows:
Section R905.1 – Roof Covering Application ... is amended to read as follows:
Every new fireplace shall have permanently installed one of the following:
All boiler rooms are to be provided with a floor drain. Section G2406.2 – Prohibited Locations .. .is amended to read as follows:
G2406.2 Prohibited locations. Fuel-fired appliances shall not be located in, or obtain combustion air from any of the following rooms or spaces:
Section G2417.4 Inspection, Testing, and Purging .. .is amended as follows:
G2424.8 Equipment not required to be vented is amended to eliminate — Item #7: Room heaters listed for unvented use.
G2445.1 Prohibited installation.
Installation of unvented room heaters shall be prohibited. Section P3103 Vent Terminals P3103.2 Frost Closure.
Where the 97.5-percent value for outside design temperature is 0°F (-18°C) or less, every vent extension through a roof or wall shall be a minunum of 2 inches (76mm) in diameter. Any increase in the size of the vent shall be made inside the structure a minimum of l foot (305 mm) below the roof or inside the wall.
Electrical Sections Delete Chapters 33 through 42.
INTERNATIONAL FUEL GAS CODE:
Section 303.3 Appliance location. Add Item:
Number 6. LPG appliances. LPG appliances shall not be installed in a pit, basement or crawl space where unburned fuel may accumulate unless an approved sensing device is installed. Delete Exception Numbers 3 and 4.
406.4.1 Test pressure.
The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (20 kPa gauge), irrespective of design pressure. Where the test pressure exceeds 125 psig (862 kPa gauge), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe. Welded gas and medium pressure piping (14 inch water column or greater) shall be tested at a minimum of 60 psi.
601.1. Scope. Add the following sentence:
Approved gas logs shall be installed in new solid fuel burning fireplaces when required by Sections
2111.1.1 of the International Building Code amended effective January l, 2004.
Delete Section 621 Unvented room heaters, in its entirety. INTERNATIONAL PLUMBING CODE:
The following Appendix Chapters to the International Plumbing Code, 2003 Edition; are hereby adopted. No other appendix chapters are adopted.
Appendix Chapter D – Degree Day and Design Temperatures for Cities in the United States. Appendix Chapter E – Sizing of water piping systems. 604.5 Minimum sizes of fixture water supply pipes. Add note:
Minimum of ½ inch water supply to all fixtures (3/8 riser pipe is acceptable).
605.4 Water distribution pipe.
Add note:
Plastic insert fittings are prohibited.
INTERNATIONAL MECHANICAL CODE:
Add the following Sections –
303.3.1 LPG appliance.
LPG appliances shall not be installed in a pit, basement or crawl space where unburned fuel may accumulate unless an approved sensing device is installed.
903.1 General Add sentence:
Every new installation of a solid fuel-burning, vented decorative appliance or room heater shall meet the most stringent emission standards for woodstoves established under State statute and/or regulations promulgated by the State Air Quality Control Commission as of the time of installation of the appliance for room heater. (Effective January l, 1991 – CC90-617.)
903.3. ..is amended to read as follows:
Unvented gas log heaters. Unvented gas log heaters are prohibited. NATIONAL ELECTRIC CODE:
The following amendments by addition, deletion, revision and exceptions are made to the National Electrical Code, 2002 Edition, for use with all Factory Built units:
Exception: Smoke detector is not required to be on arc fault circuit. ATTACHMENT “A”
16 Dillon 9065 39 17 Dove Creek 6843 37 18 Durango 6550 37 19 Eagle 6497 39 20 Estes Park 7525 40 21 Ft. Collins 5001 40 22 Ft. Morgan 4321 40 23 Fraser 8560 39 24 Glenwood Springs 5823 39 34 25 Granby 7935 40 26 Grand Junction Airport 4849 39 27 Greeley 4648 40 28 Gunnison 7664 38 29 Holyoke 3746 40 30 Idaho Springs 7555 39 31 Julesburg 3469 41° 32 Kit Carson 4284 38 33 Kremmling 7359 40 34 La Junta Airport 4188 38 03 35 Lamar 3635 38 36 Last Chance 4790 39 38 Limon 5557 39 39 Longmont 4950 40 40 Meeker 6347 40 41 Montrose 5830 38 42 Ouray 7740 38 43 Pagosa Springs 7238 37 44 Pueblo Airport 4639 38 45 Rangely 5250 40 46 Rifle 5345 39 47 Saguache 7697 38 48 Salida 7050 38 49 San Luis 7990 37 50 Silverton 9322 37 51 Springfield 4410 37 52 Steamboat Springs 6770 40 53 Sterling 3939 40 54 Trinidad Airport 5746 17 15 55 Uravan 5010 38 56 Vail 8150 39 57 Walden 8099 40 58 Walsenburg 6220 37 59 Wray 3560 40 60 Yuma 4125 40 *Data supplied by Colorado Division of Highways Elevations and Degree Day taken from Climate Data for Air Conditioning Design, 1976, Rocky Chapter, American Society of Heating, Refrigerating & Air Conditioning Engineers (ASHRAE). With certain exceptions indicated by *, Latitudes taken from U.S. Dept, of Commerce, National Oceanic & Atmospheric Administration Records, Ashville 7- 73-1150. ATTACHMENT B SUPPLEMENT TO CLIMATE DATA FOR AIR CONDITIONING DESIGNROCKY MOUNTAIN CHAPTER REGIONCOLORADO, WYOMING, MONTANA & ENVIRONS – 4/20/78Published by Rocky Mountain Chapter ASHRAEFirst Edition – Centennial 19761 1Any small variation between the data presented here and 1972 ASHRAE BOOK OF FUNDAMENTALS is due to expanded use of detailed historical weather data.
DESIGN TEMPERATURES FOR COLORADO CITIES AND TOWNS Location 2 2 Summer 2 1/2% Dry Winter 97 1/2% Wet Bulb Bulb 1 Alamosa 82°F 61°F 2 Aspen 81 59 3 Boulder 90 63 4 Buena Vista 83 58 5 Burlington 95 70 6 Canon City 90 64 7 Cheyenne Wells 97 70 8 Colorado Springs Airport 88 62 9 Cortez 88 63 10 Craig 86 61 11 Creede 80 58 12 Del Norte 81 60 13 Delta 95 62 14 Denver Airport 90 64 15 Denver City (Roof 90 64 exposure)