49 C.F.R. § 672.21
(a) General requirement. Each recipient subject to the requirements of this part shall ensure that its designated personnel:
(d) Semiannual reporting. Semiannually, between January 1st and January 31st and between July 1st and July 31st of each calendar year, the identified POC must submit documentation to FTA, via electronic method defined by FTA, that identifies:
(e) SSOA requirement.
(3) Each SSOA shall identify the tasks related to reviews, inspections, examinations, and other safety oversight activities requiring SSOA approval, which must be performed by the SSOA to carry out its safety oversight requirements, and identify the skills and knowledge necessary to perform each oversight task at that system. At a minimum, the technical training plan will describe the process for receiving technical training in the following competency areas appropriate to the specific rail fixed guideway public transportation system(s) for which reviews and inspections conducted:
(iii) Knowledge of agency:
(4) The SSOA will determine the length of time for the technical training based on the skill level of the designated personnel relative to the applicable rail transit agency(s). FTA will provide a template as requested to assist the SSOA with preparing and monitoring its technical training plan and will provide technical assistance as requested. Each SSOA technical training plan that is submitted to FTA for review will:
(i) Require designated personnel to successfully:
(iv) Require that training records be maintained to demonstrate the current qualification status of designated personnel assigned to carry out the oversight program. Records may be maintained either electronically or in writing and must be provided to FTA upon request. Records must include the following information concerning each designated personnel: