Construction
195.200
Scope.
195.202
Compliance with specifications or standards.
195.204
Inspection—general.
195.205
Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
195.206
Material inspection.
195.207
Transportation of pipe.
195.208
Welding of supports and braces.
195.210
Pipeline location.
195.212
Bending of pipe.
195.214
Welding procedures.
195.216
Welding: Miter joints.
195.222
Welders and welding operators: Qualification of welders and welding operators.
195.224
Welding: Weather.
195.226
Welding: Arc burns.
195.228
Welds and welding inspection: Standards of acceptability.
195.230
Welds: Repair or removal of defects.
195.234
Welds: Nondestructive testing.
195.236-195.244
[Reserved]
195.246
Installation of pipe in a ditch.
195.248
Cover over buried pipeline.
195.250
Clearance between pipe and underground structures.
195.252
Backfilling.
195.254
Above ground components.
195.256
Crossing of railroads and highways.
195.258
Valves: General.
195.260
Valves: Location.
195.262
Pumping equipment.
195.264
Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
195.266
Construction records.