33 C.F.R. § 155.4040
(a) You must ensure, by contract or other approved means, that your resource provider(s) is capable of providing the services within the required timeframes.
(2) If your vessel is at the pier or transiting a COTP zone outside the continental United States (OCONUS), the timeframes in Table 155.4030(b) apply as follows:
(c) Table 155.4040(c) provides additional amplifying information for vessels transiting within the nearshore and offshore areas of CONUS or within 50 miles of an OCONUS COTP city.
| Service | Response timeframe ends when |
|---|---|
| (1) Salvage: | |
| (i) Remote assessment and consultation | Salvor is in voice contact with Qualified Individual (QI)/Master/Operator. |
| (ii) Begin assessment of structure and stability | A structural assessment of the vessel has been initiated. |
| (iii) On-site salvage assessment | Salvor on board vessel. |
| (iv) Assessment of structure and stability | Initial analysis is completed. This is a continual process, but at the time specified an analysis needs to be completed. |
| (v) Hull and bottom survey | Survey completed. |
| (vi) Emergency towing | Towing vessel on scene. |
| vii) Salvage plan | Plan completed and submitted to Incident Commander/Unified Command. |
| (viii) External emergency transfer operations | External pumps on board vessel. |
| (ix) Emergency lightering | Lightering equipment on scene and alongside. |
| (x) Other refloating methods | Salvage plan approved & resources on vessel. |
| (xi) Making temporary repairs | Repair equipment on board vessel. |
| (xii) Diving services support | Required support equipment & personnel on scene. |
| (xiii) Special salvage operations plan | Plan completed and submitted to Incident Commander/Unified Command. |
| (xiv) Subsurface product removal | Resources on scene. |
| (xv) Heavy lift 1 | Estimated. |
| (2) Marine Firefighting: | |
| (i) Remote assessment and consultation | Firefighter in voice contact with QI/Master/Operator. |
| (ii) On-site fire assessment | Firefighter representative on site. |
| (iii) External firefighting teams | Team and equipment on scene. |
| (iv) External vessel firefighting systems | Personnel and equipment on scene. |
| 1 Heavy lift services are not required to have definite hours for a response time. The planholder must still contract for heavy lift services, provide a description of the heavy lift response and an estimated response time when these services are required, however, none of the timeframes listed in the table in § 155.4030(b) will apply to these services. |
(d) How to apply the timeframes to your particular situation. To apply the timeframes to your vessel's situation, follow these procedures:
[USCG-1998-3417, 73 FR 80649, Dec. 31, 2008, as amended by USCG-2024-1103, 90 FR 52878, Nov. 24, 2025]