(a) General requirements. You, the permittee or operator, must mechanically transport and place excess spoil in designated disposal areas, including approved valley fills and other types of approved fills, within the permit area in a controlled manner in compliance with the requirements of this section. In general, you must place excess spoil in a manner that will -
(e) Surface runoff control requirements.
(1) You must direct surface runoff from areas above the fill and runoff from the surface of the fill into stabilized channels designed to -
(3) Underdrains.
(iii) In constructing rock underdrains, you may use only hard rock that is resistant to weathering, such as well-cemented sandstone and massive limestone, and that is not acid-forming or toxic-forming. The underdrain must be free of soil and fine-grained, clastic rocks such as siltstone, shale, mudstone, and claystone. All rock used to construct underdrains must meet the criteria in the following table:
| Test | ASTM standard | AASHTO standard | Acceptable results |
|---|---|---|---|
| Los Angeles Abrasion | C 131 or C 535 | T 96 | Loss of no more than 50 percent of test sample by weight. |
| Sulfate Soundness | C 88 or C 5240 | T 104 | Sodium sulfate test: Loss of no more than 12 percent of test sample by weight. Magnesium sulfate test: Loss of no more than 18 percent of test sample by weight. |
(g) Placement of excess spoil.
(3) Acid-forming, toxic-forming, and combustible materials.
(h) Final configuration.
(k) Inspections and examinations.
(1) A qualified registered professional engineer, or other qualified professional specialist under the direction of the professional engineer, must inspect the fill at least quarterly during construction, with additional complete inspections conducted during critical construction periods. The professional engineer or specialist must be experienced in the construction of earth and rock fills. Critical construction periods include, at a minimum -
(2) An engineer or specialist meeting the qualifications of paragraph (k)(1) of this section also must -
(3)
(iv) The report prepared under paragraph (k)(3)(i) of this section must contain -
(l) Coal mine waste. You may dispose of coal mine waste in excess spoil fills only if approved by the regulatory authority and only if -
(1) You demonstrate, and the regulatory authority finds in writing, that the disposal of coal mine waste in the excess spoil fill will not -