30 C.F.R. § 250.733
(a) When you drill or conduct operations with a surface BOP stack, you must install the BOP system before drilling or conducting operations to deepen the well below the surface casing and after the well is deepened below the surface casing point. The surface BOP stack must include at least four remote-controlled, hydraulically operated BOPs, consisting of one annular BOP, one BOP equipped with blind shear rams, and two BOPs equipped with pipe rams.
(b) If you plan to use a surface BOP on a floating production facility you must:
(2) For risers installed after July 28, 2016, use a dual bore riser configuration before drilling or operating in any hole section or interval where hydrocarbons are, or may be, exposed to the well. The dual bore riser must meet the design requirements of API RP 2RD (as incorporated by reference in § 250.198), including appropriate design for the maximum anticipated operating and environmental conditions.
(e) Additional requirements for surface BOP systems used in well-completion, workover, and decommissioning operations. The minimum BOP system for well-completion, workover, and decommissioning operations must meet the appropriate standards from the following table:
| When . . . | The minimum BOP stack must include . . . |
|---|---|
| (1) The expected pressure is less than 5,000 psi, | Three BOPs consisting of an annular, one set of pipe rams, and one set of blind-shear rams. |
| (2) The expected pressure is 5,000 psi or greater or you use multiple tubing strings, | Four BOPs consisting of an annular, two sets of pipe rams, and one set of blind-shear rams. |
| (3) You handle multiple tubing strings simultaneously, | Four BOPs consisting of an annular, one set of pipe rams, one set of dual pipe rams, and one set of blind-shear rams. |
| (4) You use a tapered drill pipe, work string, or tubing, | At least one set of pipe rams that are capable of sealing around each size of drill pipe, work string, or tubing. If the expected pressure is greater than 5,000 psi, then you must have at least two sets of pipe rams that are capable of sealing around the larger size drill pipe, work string, or tubing. You may substitute one set of variable bore rams for two sets of pipe rams. |
| (5) You use a surface BOP on a floating facility, | The elements required by § 250.733(b)(1) of this part. |
[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21979, May 15, 2019; 88 FR 87347, Aug. 23, 2023]