10 C.F.R. § 431.96
(b) Testing and calculations.
(2) After June 24, 2016, any representations made with respect to the energy use or efficiency of packaged terminal air conditioners and heat pumps (PTACs and PTHPs) must be made in accordance with the results of testing pursuant to this section. Manufacturers conducting tests of PTACs and PTHPs after July 30, 2015 and prior to June 24, 2016, must conduct such test in accordance with either table 1 to this section or § 431.96 as it appeared at 10 CFR part 431, subpart F, in the 10 CFR parts 200 to 499 edition revised as of January 1, 2014. Any representations made with respect to the energy use or efficiency of such packaged terminal air conditioners and heat pumps must be in accordance with whichever version is selected.
| Equipment | Category | Cooling capacity or moisture removal capacity 1 | Energy efficiency descriptor | Use tests, conditions, and procedures in | Additional test procedure provisions as indicated in the listed paragraphs of this section |
|---|---|---|---|---|---|
| Commercial Package Air Conditioning and Heating Equipment | Air-Cooled, 3-Phase, AC and HP | <65,000 Btu/h | SEER and HSPF | Appendix F to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Air-Cooled, 3-Phase, AC and HP | <65,000 Btu/h | SEER2 and HSPF2 | Appendix F1 to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Air-Cooled AC and HP (excluding double-duct AC and HP) | ≥65,000 Btu/h and <760,000 Btu/h | EER, IEER, and COP | Appendix A to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Air-Cooled AC and HP (excluding double-duct AC and HP) | ≥65,000 Btu/h and <760,000 Btu/h | EER2, COP2, IVEC, and IVHE | Appendix A1 to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Double-duct AC and HP | ≥65,000 Btu/h and <300,000 Btu/h | EER, IEER, and COP | Appendix A to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Double-duct AC and HP | ≥65,000 Btu/h and <300,000 Btu/h | EER2, COP2, IVEC, and IVHE | Appendix A1 to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Water-Cooled and Evaporatively-Cooled AC | <760,000 Btu/h | EER and IEER | Appendix A to this subpart 2 | None. |
| Commercial Package Air Conditioning and Heating Equipment | Water-Cooled and Evaporatively-Cooled AC | <760,000 Btu/h | EER2 and IVEC | Appendix A1 to this subpart 2 | None. |
| Water-Source Heat Pumps | HP | <760,000 Btu/h | EER and COP | Appendix C to this subpart 2 | None. |
| Water-Source Heat Pumps | HP | <760,000 Btu/h | IEER and ACOP | Appendix C1 to this subpart 2 | None. |
| Packaged Terminal Air Conditioners and Heat Pumps | AC and HP | <760,000 Btu/h | EER and COP | Paragraph (g) of this section | Paragraphs (c), (e), and (g). |
| Computer Room Air Conditioners | AC | <760,000 Btu/h | SCOP | Appendix E to this subpart 2 | None. |
| Computer Room Air Conditioners | AC | <760,000 Btu/h or <930,000 Btu/h 3 | NSenCOP | Appendix E1 to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems | AC | <65,000 Btu/h (3-phase) | SEER | Appendix F to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems | AC | <65,000 Btu/h (3-phase) | SEER2 | Appendix F1 to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Air-cooled | HP | <65,000 Btu/h (3-phase) | SEER and HSPF | Appendix F to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Air-cooled | HP | <65,000 Btu/h (3-phase) | SEER2 and HSPF2 | Appendix F1 to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Air-cooled | AC and HP | ≥65,000 Btu/h and <760,000 Btu/h | EER and COP | Appendix D to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Air-cooled | AC and HP | ≥65,000 Btu/h and <760,000 Btu/h | IEER and COP | Appendix D1 to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Water-source | HP | <760,000 Btu/h | EER and COP | Appendix D to this subpart 2 | None. |
| Variable Refrigerant Flow Multi-split Systems, Water-source | HP | <760,000 Btu/h | IEER and COP | Appendix D1 to this subpart 2 | None. |
| Single Package Vertical Air Conditioners and Single Package Vertical Heat Pumps | AC and HP | <760,000 Btu/h | EER and COP | Appendix G to this subpart 2 | None. |
| Single Package Vertical Air Conditioners and Single Package Vertical Heat Pumps | AC and HP | <760,000 Btu/h | EER, IEER, and COP | Appendix G1 to this subpart 2 | None. |
| Direct Expansion-Dedicated Outdoor Air Systems | All | <324 lbs. of moisture removal/hr | ISMRE2 and ISCOP2 | Appendix B to this subpart | None. |
| 1 Moisture removal capacity applies only to direct expansion-dedicated outdoor air systems. | |||||
| 2 For equipment with multiple appendices listed in this table, consult the notes at the beginning of those appendices to determine the applicable appendix to use for testing. | |||||
| 3 For upflow ducted and downflow floor-mounted computer room air conditioners, the test procedure in appendix E1 to this subpart applies to equipment with net sensible cooling capacity less than 930,000 Btu/h. For all other configurations of computer room air conditioners, the test procedure in appendix E1 to this subpart applies to equipment with net sensible cooling capacity less than 760,000 Btu/h. |
(d) Refrigerant line length corrections for tests conducted using AHRI 1230-2010. For test setups where it is physically impossible for the laboratory to use the required line length listed in Table 3 of the AHRI 1230-2010 (incorporated by reference, see § 431.95), then the actual refrigerant line length used by the laboratory may exceed the required length and the following correction factors are applied:
| Piping length beyond minimum, X(ft) | Piping length beyond minimum, Y(m) | Cooling capacity correction% |
|---|---|---|
| 0>X ≤20 | 0>Y ≤6.1 | 1 |
| 20>X ≤40 | 6.1>Y ≤12.2 | 2 |
| 40>X ≤60 | 12.2>Y ≤18.3 | 3 |
| 60>X ≤80 | 18.3>Y ≤24.4 | 4 |
| 80>X ≤100 | 24.4>Y ≤30.5 | 5 |
| 100 >X ≤120 | 30.5>Y ≤36.6 | 6 |
(e) Additional provisions for equipment set-up. The only additional specifications that may be used in setting up the basic model for test are those set forth in the installation and operation manual shipped with the unit. Each unit should be set up for test in accordance with the manufacturer installation and operation manuals. Paragraphs (e)(1) through (3) of this section provide specifications for addressing key information typically found in the installation and operation manuals.
[77 FR 28989, May 16, 2012; 80 FR 11857, Mar. 5, 2015, as amended at 80 FR 37148, June 30, 2015; 80 FR 79669, Dec. 23, 2015; 87 FR 45198, July 27, 2022; 87 FR 63897, Oct. 20, 2022; 87 FR 75168, Dec. 7, 2022; 87 FR 77325, Dec. 16, 2022; 88 FR 21839, Apr. 11, 2023; 88 FR 36424, June 2, 2023; 88 FR 84228, Dec. 4, 2023; 89 FR 44037, May 20, 2024; 90 FR 6794, Jan. 21, 2025]