Cal. Code Regs. tit. 23, Div. 2 Ch. 2.7 App. B

Sample Certificate of Completion Package

Effective Jan 2, 2025Register 2025, No. 1State of California

This certificate is filled out by the project applicant to certify that the landscape project has been installed in accordance with the Model Water Efficient Landscape Ordinance.

  1. (a) Prescriptive Compliance Option is limited to elements 1, 2, and 4.
  2. (b) Performance Compliance Option shall include all six (6) elements.

    ELEMENT 1. PROJECT INFORMATION SHEET

    Project Applicant Information:

    Name of Project Applicant (or designee if applicable):Project Name:
    Name of Property Owner (if different):Title:
    Street Address:Water Supply Type (Circle One):
    Potable / Recycled / Well / Other (specify):
    City, State:Water Purveyor:
    Zip Code:Phone No.:
    Fax Number:Email:
    Company:

    Project Address and Location:

    Street Address:Parcel, tract, or lot number (if available):
    City:Meter number(s) (if available):
    Zip Code:Latitude/Longitude (optional):

    ELEMENT 2. CERTIFICATION OF INSTALLATION ACCORDING TO THE LANDSCAPE DOCUMENTATION PACKAGE

    Certification by the designer of record that the landscape project has been installed per the approved Landscape Documentation Package per Section 491.4 and the applicable documents:

  3. (A) Where there have been significant changes made in the field during construction, these “as-built” or record drawings shall be included.
  4. (B) A diagram of the irrigation plan showing hydrozones shall be kept with the automatic irrigation controller for subsequent management processes.

    “I/we certify that based upon periodic site observations, the work has been completed in accordance with the model ordinance and that the landscape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package.”

    Primary Designer of Record SignatureDate
    Secondary Designer of Record SignatureDate

    ELEMENT 3. SOIL MANAGEMENT REPORT

    Attach soil management report, if not previously submitted with the Landscape Documentation Package per model ordinance Section 491.4(b).

    Attach documentation verifying implementation of recommendations from soil analysis management report per model ordinance Section 493.1.

    ELEMENT 4. IRRIGATION SCHEDULING PARAMETERS

    Attach irrigation scheduling parameters used to set the automatic irrigation controller per model ordinance Section 493.4.

    ELEMENT 5. LANDSCAPE AND IRRIGATION MAINTENANCE SCHEDULE

    Attach landscape and irrigation maintenance schedule per model ordinance Section 493.5.

    ELEMENT 6. IRRIGATION AUDIT REPORT

    Attach Irrigation Audit Report per model ordinance Section 493.6.

    PROJECT APPLICANT SIGNATURE:

    “I/we certify that I/we have received copies of all the documents within the Certificate of Completion Package and that it is our responsibility to see that the project is maintained in accordance with the Landscape and Irrigation Maintenance Schedule.”

    Project Applicant (or designee) SignatureDate

    Please answer the questions below:

  5. 1. Date the Landscape Documentation Package was submitted to the local agency __________
  6. 2. Date the Landscape Documentation Package was approved by the local agency __________
  7. 3. Date that a copy of the Water Efficient Landscape Worksheet (including the Water Budget Calculation) was submitted to the local water purveyor __________

History

1. New Appendix B filed 9-10-2009; operative 9-10-2009 pursuant to Government Code section 11343.4 (Register 2009, No. 37).

2. Repealer and new Appendix B filed 9-15-2015; operative 9-15-2015. Exempt from OAL review and submitted to OAL for printing only pursuant to Governor's Executive Order No. B-29-15 (4-1-2015) (Register 2015, No. 38).

3. Repealer and new appendix filed 1-2-2025; operative 1-2-2025 pursuant to Government Code section 11343.4(b)(3) (Register 2025, No. 1).