OHIO VALLEY ENVIRONMENTAL COALITION; Coal River Mountain Watch; Natural Resources Defense Council, Plaintiffs-Appellees, v. William BULEN, District Engineer, U.S. Army Corps of Engineers, Huntington District; Robert B. Flowers, Lieutenant General, Chief of Engineers and Commander of the U.S. Army Corps of Engineers, Defendants-Appellants, and West Virginia Coal Association; Kentucky Coal Association; Ohio Coal Association; Coal Operations and Associates, Incorporated; National Mining Association; Green Valley Coal Company, Intervenors-Defendants, Consol of Kentucky, Incorporated, Party in Interest. Ohio Valley Environmental Coalition; Coal River Mountain Watch; Natural Resources Defense Council, Plaintiffs-Appellees, v. West Virginia Coal Association; Kentucky Coal Association; Ohio Coal Association; Coal Operations and Associates, Incorporated; National Mining Association, Intervenors-Defendants-Appellants, and William Bulen, District Engineer, U.S. Army Corps of Engineers, Huntington District; Robert B. Flowers, Lieutenant General, Chief of Engineers and Commander of the U.S. Army Corps of Engineers, Defendants, Green Valley Coal Company, Intervenor-Defendant, Consol of Kentucky, Incorporated, Party in Interest. Ohio Valley Environmental Coalition; Coal River Mountain Watch; Natural Resources Defense Council, Plaintiffs-Appellees, v. Green Valley Coal Company, Intervenor-Defendant-Appellant, and William Bulen, District Engineer, U.S. Army Corps of Engineers, Huntington District; Robert B. Flowers, Lieutenant General, Chief of Engineers and Commander of the U.S. Army Corps of Engineers, Defendants, Consol of Kentucky, Incorporated, Party in Interest, West Virginia Coal Association; Kentucky Coal Association; Ohio Coal Association; Coal Operations and Associates, Incorporated; National Mining Association, Intervenors-Defendants.
Nos. 04-2129, 04-2137, 04-2402
United States Court of Appeals, Fourth Circuit
Argued: Sept. 19, 2005. Decided: Nov. 23, 2005.
429 F.3d 493
Before NIEMEYER and LUTTIG, Circuit Judges, and ROBERT J. CONRAD, Jr., United States District Judge for the Western District of North Carolina, sitting by designation.
Affirmed in part, vacated in part, and remanded by published opinion. Judge LUTTIG wrote the opinion, in which Judge NIEMEYER and Judge CONRAD joined.
OPINION
LUTTIG, Circuit Judge:
This case presents the question whether the United States Army Corps of Engineers (“the Corps“) exceeded its authority under the Clean Water Act (“CWA“) when it promulgated Nationwide Permit 21 (“NWP 21“), a general permit for the discharge of dredged or fill material into the waters of the United States that allows projects to proceed only after receiving individualized authorization from the Corps. We conclude that the Corps complied with the CWA when it promulgated NWP 21. The contrary judgment of the district court is therefore vacated.
I.
The Clean Water Act prohibits the discharge of any “pollutant” into the waters of the United States without a permit. See
the [Corps] may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the [Corps] determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall ... set forth the requirements and standards
which shall apply to any activity authorized by such general permit.
Pursuant to section 404(e), the Corps has promulgated a number of general permits, all but one of which authorize projects that comply with the permits’ terms to proceed without prior approval by the Corps. The exception, NWP 21—which authorizes discharges of dredged or fill material associated with surface coal mining and reclamation projects—requires that projects be individually authorized by the Corps. NWP 21 authorizes:
[d]ischarges of dredged or fill material into waters of the U.S. associated with surface coal mining and reclamation operations provided the coal mining activities are authorized by the DOI, Office of Surface Mining (OSM), or by states with approved programs under Title V of the Surface Mining Control and Reclamation Act of 1977 and provided the permittee notifies the District Engineer in accordance with the “Notification” General Condition. In addition, to be authorized by this NWP, the District Engineer must determine that the activity complies with the terms and conditions of the NWP and that the adverse environmental effects are minimal both individually and cumulatively and must notify the project sponsor of this determination in writing.
Issuance of Nationwide Permits, 67 Fed. Reg. 2020, 2081 (Jan. 15, 2002).
In this litigation, plaintiffs, a coalition of environmental groups, have raised various challenges to NWP 21. The district court did not reach most of those challenges, holding simply that NWP 21 is facially invalid under Chevron U.S.A. Inc. v. Natural Resources Defense Council, Inc., 467 U.S. 837, 104 S. Ct. 2778, 81 L. Ed. 2d 694 (1984), because it conflicts with the unambiguous meaning of section 404(e). J.A. 1070. The district court accordingly suspended existing authorizations under NWP 21 and enjoined the Corps from issuing further NWP 21 authorizations in the Southern District of West Virginia. Id. at 1079, 104 S. Ct. 2778. This appeal followed.
II.
The district court concluded that NWP 21 conflicts with the unambiguous meaning of section 404(e) for essentially four reasons. First, it concluded that NWP 21 “defines a procedure instead of permitting a category of activities.” J.A. 1070. Second, it concluded that section 404(e) “unambiguously requires determination of minimal impact before, not after, the issuance of a nationwide permit,” and that, in violation of this requirement, “NWP 21 provides for a post hoc, case-by-case evaluation of environmental impact.” Id. Third, it concluded that section 404(e) unambiguously requires that general permits authorize discharges to proceed without further involvement from the Corps, and NWP 21 violates this requirement because it authorizes projects to proceed only after receiving individualized approval from the Corps. Id. Finally, it concluded that NWP 21 violates the statutory requirement that the Corps provide notice and opportunity for public hearing before issuing a permit. Id. None of these conclusions withstands scrutiny.
At the outset, we note that, while our review of the district court‘s construction of section 404 is de novo, our review of the Corps’ construction of section 404 is governed by the Supreme Court‘s decision in Chevron. Under Chevron, if the requirements of section 404 are unambiguous, “that is the end of the matter; for the court, as well as the agency, must give effect to the unambiguously expressed intent of Congress.” Chevron, 467 U.S. at
A.
The district court first concluded that NWP 21 fails to comply with section 404(e) because it “defines a procedure instead of permitting a category of activities.” J.A. 1070. We disagree. NWP 21 plainly authorizes a “category of activities.” The category of activities authorized by NWP 21 consists of those discharges of dredged or fill material that (1) are associated with surface coal mining and reclamation operations, so long as those operations are authorized by the Department of Interior or by states with approved programs under the Surface Mining Control and Reclamation Act of 1977, (2) are preceded by notice to the Corps, and (3) are approved by the Corps after the Corps concludes that the activity complies with the terms of NWP 21 and that its adverse environmental effects are minimal both individually and cumulatively. See 67 Fed. Reg. at 2081.
The district court erroneously reasoned that NWP 21 does not authorize a “category of activities” because it is defined by procedural requirements “rather than objective requirements or standards.” J.A. 1072 (“NWP 21 imposes no limit on the number of linear feet of a stream, for example, that might be impacted by a valley fill or surface impoundment. It does not limit the total acreage of a watershed that might be impacted.“). As an initial matter, we note that, by virtue of its incorporation of the requirements of the Surface Mining Control and Reclamation Act (“SMCRA“), NWP 21 does contain substantive requirements.1 More importantly, nothing in section 404(e) or in logic prohibits, much less unambiguously prohibits, the use of procedural, in addition to substantive, parameters to define a “category.” The district court therefore erred when it concluded that NWP 21 does not define a “category of activities.”2
B.
The district court next concluded that NWP 21 violates the unambiguous terms of section 404(e) because it allows the Corps to defer the statutorily-required minimal-environmental-impact determinations until after issuance of the nationwide permit. J.A. 1070 (“The statute unambiguously requires determination of minimal impact before, not after, the issuance of a nationwide permit.“).3 Section 404(e) al-
It is clear from the record before us that the Corps did make the required minimal-impact determinations before it issued NWP 21. See id. at 512 (stating that the Corps “determined that NWP 21 ... will authorize only those activities with minimal adverse effects on the aquatic environment, individually or cumulatively“). The Decision Document for NWP 21 and the supplement to that document, set forth at pages 469-512 of the Joint Appendix, contain the Corps’ pre-issuance analysis of the anticipated environmental impact of the activities authorized by NWP 21. Id. at 462 (“This document contains a general assessment of the foreseeable effects of the individual activities authorized by this NWP, the anticipated cumulative effects of those activities, and the potential future losses of waters of the United States that are estimated to occur until the expiration date of the NWP.“). The Corps’ impact analysis took account of a variety of factors, including public commentators’ opinions, id. at 464-65 (stating that the Corps “uses substantive public comments on proposed NWPs to assess the expected impacts” and considering several suggestions made by public commentators); NWP 21‘s incorporation of SMCRA‘s requirements, id. at 470 (stating that the review required under SMCRA will ensure that the permit will not authorize activities that affect historic properties), 476 (stating that the review required under SMCRA will ensure that the permit will not authorize activities that will jeopardize any endangered species); the nature of the coal-mining activities authorized by NWP 21, id. at 475 (“The activities authorized by this NWP are unlikely to adversely affect salinity gradients, since the NWP authorizes surface coal mining activities that are typically located in inland areas.“), 482 (“The nature and scope of the work authorized by the NWP will most likely restrict the extent of the beneficial and detrimental effects to the area immediately surrounding the surface coal mining and reclamation activity.“); the applicability of a variety of General Conditions to NWP 21, id. at 483 (“No toxic discharges will be authorized by this NWP. General Condition 18 specifically states that the material must be free from toxic pollutants in toxic amounts.“), 484 (“General Condition 19 requires permittees to avoid and minimize discharges of dredged or fill material into waters of the United States to the maximum extent practicable on the project site.“); and data about usage of previous versions of NWP 21, id. at 481 (estimating, based on usage of previous versions of NWP 21, that, over the five-year duration of this issuance of NWP 21, “approximately 1,625 activities could be authorized ...
The district court held that the Corps did not satisfy section 404(e) because it did not provide an ex ante guarantee that the activities authorized by NWP 21 would have only a minimal impact. The district court reasoned that, under section 404(e), “[t]he issuance of a nationwide permit ... functions as a guarantee ab initio that every instance of the permitted activity will meet the minimal impact standard,” and that, by permitting the Corps to engage in “post hoc, case-by-case evaluation of environmental impact,” NWP 21 “runs afoul of the statutory requirement of initial certainty.” Id. at 1070.
The district court erred. It is simply not the case that issuance of a general permit functions as a guarantee ab initio that every instance of the permitted activity will have only a minimal impact. Neither the phrase “guarantee ab initio” nor the phrase “initial certainty” appears in section 404(e). And neither that section nor any other provision of the CWA specifies how the Corps must make the minimal-impact determinations, the degree of certainty that must undergird them, or the extent to which the Corps may rely on post-issuance procedures in making them.
For two reasons, we do not believe that an interpretation of section 404(e) that would require initial certainty is tenable. First, section 404(e)(2) gives the Corps authority to revoke or modify a general permit if, after issuing the permit, it “determines that the activities authorized by such general permit have an adverse impact on the environment.”
Given section 404(e)(2)‘s recognition of the possibility that activities authorized by a general permit could result in a more-than-minimal impact, as well as the impossibility of making an ex ante guarantee that the authorized activities could never result in a more-than-minimal impact, we cannot agree with the district court‘s conclusion that section 404(e) allows the Corps to issue general permits only for those activities that “will invariably have only minimal effects on the environment.” J.A. 1070.
Nor can we agree with the district court‘s implicit conclusion that the Corps may not rely on the availability of post-issuance procedures, such as NWP 21‘s requirement of post-issuance individualized authorization, when it makes its pre-issuance minimal-impact determinations. See id. at 1072-73. The statute is silent on the question whether the Corps may make its pre-issuance minimal impact determinations by relying in part on the fact that its post-issuance procedures will ensure that the authorized projects will have only minimal impacts. We must therefore defer to the Corps’ conclusion that it may do so if that conclusion is permissible in light of the statutory language and is reasonable. It is both. Again, nothing in the statute specifies how the Corps must make the minimal-impact determinations. And, given the inevitable ex ante uncertainty the Corps confronts when issuing a nationwide permit, its reliance on post-issuance procedures is a reasonable, if not the only possible, way for it to cement its determination that the projects it has authorized will have only minimal environmental impacts.5
Apparently, the district court believed that such was the case here. See J.A. 1073 (“The ‘category’ of activities authorized by NWP 21 ... is nothing more than the collection of activities that the Corps determines, during reviews that take place long after the issuance of NWP 21, will have minimal effects.“). It is true that the Corps acknowledged in its decision document that the PCN and prior-authorization requirements would operate to ensure that NWP 21‘s adverse effects on the environment would be minimal. See, e.g., id. at 466 (noting that NWP 21 requires “case-by-case review of all activities, to ensure that the NWP authorizes only those surface coal mining activities that have minimal adverse effects on the aquatic environment“), 478-79 (stating that, with respect to “special aquatic sites,” including sanctuaries and refuges, wetlands, mud flats, vegetated shallows, coral reefs, and riffle and pool complexes, minimal impact will be ensured through individualized review pursuant to the PCN requirement), 480 (“All activities authorized by this NWP require notification to the [Corps], which will allow review of each activity to ensure that adverse effects to economically important fish and shellfish are minimal.“).
However, we are satisfied, based on our review of the Corps’ decision document, that the Corps did actually make, in advance, the minimal-impact determinations required by the statute. It made those determinations after undertaking a good-faith, comprehensive, pre-issuance review of the anticipated environmental effects of the activities authorized by NWP 21, and its partial reliance on post-issuance procedures to ensure minimal impacts did not make those determinations any less valid. As explained above, section 404(e) does not unambiguously forbid the Corps from making the minimal-environmental-impact determinations by relying in part on the availability of post-issuance procedures, and such reliance is a reasonable way for the Corps to ensure that the projects it authorizes under general permits will have only minimal impacts. We therefore conclude that the Corps’ minimal-impact determinations, made prior to the issuance of NWP 21, complied with section 404(e).6
C.
The district court‘s third basis for invalidating NWP 21 was its conclusion that section 404 unambiguously prohibits the Corps from creating a general permit that authorizes activities to proceed only after receiving individualized approval from the Corps. See J.A. 1070. The district court based its conclusion on the structure of section 404—which contains separate provisions for individual permits (section 404(a)) and general permits (section 404(e))—and on its belief that “Congress intended for a potential discharger whose project fits into one of [the categories of activities authorized by a general permit] to begin discharging with no further involvement from the Corps, no uncertainty, and no red tape.” Id. at 1070, 1073-76. The district court thus held that NWP 21, which allows projects to proceed only after receiving post-issuance individualized authorization from the Corps, violates section 404.
Contrary to the district court‘s conclusion, nothing in section 404 prohibits the Corps from issuing a general permit that contains a requirement of post-issuance individualized consideration or authorization by the Corps. Neither section 404(e) nor any other provision of the CWA defines the term “general permit,” so there is no explicit textual basis for such a conclusion. Moreover, the structure of the statute is not, as the district court believed, dispositive on this score. One cannot conclude that, simply because section 404 has separate provisions for individual and general permits, it unambiguously (or even arguably) forbids the creation of a general permit that includes a requirement of individualized consideration or approval. And even if section 404(e) was intended to create a streamlined process for authorizing insignificant discharges, NWP 21 is not inconsistent with that intent. The process for obtaining authorization under a general permit—even one requiring individualized review by the Corps—is significantly more expeditious than the process for obtaining an individual permit under section 404(a). See 67 Fed. Reg. at 2024 (stating that “[t]he average time to verify a NWP activity is 19 days” and that “the NWP process is faster than the standard permit process” because “[a]n individual activity authorized by an NWP does not require a public notice or the same level of review required for a standard permit activity“).
Given that section 404 does not speak to this issue, the question is whether the Corps’ interpretation—that general permits may contain requirements of individualized review or approval—is a reasonable one. We conclude that it is. As explained above, the Corps’ post-issuance, case-by-case policing of the activities authorized by general permits is a reasonable, if not the only possible, means of ensuring that general permits are used to authorize only activities with minimal environmental effects. The Corps’ construction is therefore entitled to Chevron deference.
D.
The district court‘s final basis for invalidating NWP 21 was its conclusion that NWP 21 impermissibly allows the Corps to issue individual authorizations without providing notice and an opportunity for public hearing. See J.A. 1073-74. This, the district court reasoned, is inconsistent with the fact that section 404(a) requires the Corps to provide notice and
The fatal flaw in the district court‘s analysis is that the Corps did provide notice and opportunity for public hearing before making the determination that the category of activities authorized by NWP 21 would have only minimal adverse effects on the environment. See Proposal to Reissue and Modify Nationwide Permits, 66 Fed. Reg. 42,070, 42,076 (Aug. 9, 2001). Moreover, when the Corps made its minimal-impact determinations, it expressly addressed several of the concerns raised by public commentators. See J.A. 464-65. To the extent that the district court‘s conclusion was based on the belief that section 404 requires notice and a hearing before the Corps authorizes an individual project under a general permit, it erred. There is no statutory requirement that notice and opportunity for public hearing be provided before individual projects can proceed under a general permit, and one cannot infer such a requirement from the fact that individual permits can issue only after notice and opportunity for public hearing. Section 404(e)‘s only requirement is that there be notice and opportunity for public hearing before the general permit itself issues, and that requirement was clearly satisfied here.7
III.
One issue remains for our consideration in this appeal. Appellants argue that the district court abused its discretion in refusing to join holders of NWP 21 authorizations as necessary parties to this case under the Federal Rules of Civil Procedure. Rule 19(a) provides that a person shall be joined if, among other things, “the person claims an interest relating to the subject of the action and is so situated that the disposition of the action in the persons‘s absence may as a practical matter impair or impede the persons‘s ability to protect that interest.”
The district court held that joinder was not required because the parties are capable of representing the interests of the authorization holders. J.A. 1068. A litigant may serve as a proxy for an absent party if the interests of the two are identi-
CONCLUSION
In sum, we conclude that the Corps complied with section 404(e) when it issued NWP 21. The Corps identified a category of activities, it determined that those activities would have a minimal environmental impact both separately and cumulatively, and it provided notice and opportunity for public hearing before issuing the permit. The Corps’ issuance of NWP 21 thus fell within its authority under section 404(e). The contrary judgment of the district court and the injunction against NWP 21 authorizations are vacated, and the case is remanded for further proceedings not inconsistent with this opinion.
AFFIRMED IN PART, VACATED IN PART, AND REMANDED