MARYLAND DEPARTMENT OF THE ENVIRONMENT, еt al. v. ANACOSTIA RIVERKEEPER, et al.
No. 2199, Sept. Term, 2013.
Court of Special Appeals of Maryland.
April 2, 2015.
112 A.3d 979
153
Jennifer C. Chavez (Khushi K. Desai, Earthjustice, on the brief), all of Washington, DC, for Appellee.
NAZARIAN, LEAHY, FRIEDMAN, JJ.
NAZARIAN, J.
TABLE OF CONTENTS
- I. BACKGROUND ....................................157
- A. Statutory Background............................159
- 1. The Clean Water Act and federal permit requirements..............................159
- 2. The role of the States and Maryland‘s permit requirements...........................162
- B. The Permit.....................................164
- C. The Proceedings.................................166
- A. Statutory Background............................159
- II. DISCUSSION ......................................169
- A. Standard of Review..............................170
- B. The Permit Is Subject To § 1342, Not § 1311 .......171
- C. The Permit Does Not Comply With State Law Regarding The Permitting Process.............................176
- 1. The Permit does not give meaningful opportunity for notice and comment, and eludes judicial review.............................177
- a. The Environment Article requires that the public have an opportunity for notice and comment.........................177
- b. Specific shortcomings of the Permit.........178
- i. The public can‘t comment about decisions that have yet to be made.................... 178
- ii. The Permit is not specific enough..........................180
- iii. The Permit overrelies on incorporation by reference.........181
- iv. The Permit contains no meaningful deadlines or ways to measure compliance..............183
- 2. The agency decision to issue the Permit was unsupported by substantial evidence with respect to TMDLs and the twenty percent requirement........................185
- a. The twenty percent requirement...........185
- b. The TMDL requirement...................188
- 1. The Permit does not give meaningful opportunity for notice and comment, and eludes judicial review.............................177
This case arises out of protracted litigation over the terms of the stormwater management permit (the “Permit“) that the Maryland Department of the Environment (“the Department“) issued to Montgomery County (the “County“) in 2010. The County аnd Department appeal the decision of the Circuit Court for Montgomery County remanding the Permit to the Department “for further proceedings to allow the agency to comply with Maryland law, the Clean Water Act, and federal regulations consistent with” the court‘s interpretation of the governing law and regulations. We agree that the Permit must be revised, and so we affirm the circuit court‘s decision to remand. Importantly, though, we hold that the Department and the County had the law right: the Permit falls short not for failing to hold the County to State water quality standards, as the challengers urge,1 but because it did not
I. BACKGROUND
Stormwater is what the word suggests: water from rain—or other storm events that, as it (over)flows into streams and rivers, picks up and carries large quantities of pollutants that evade Mother Nature‘s filtration process. The pollutants can include anything from road detritus—trash, road salts, grease, and other materials from cars—to pesticides, to natural materials, such as fecal bacteria from animal waste.
The County collects stormwater through a municipal separate storm sewеr system (the County‘s is big enough to qualify as an “MS4,” a term we will define later) that covers a nearly-500-square-mile area. After it falls from the sky, stormwater flows, in higher volumes and at higher speeds, through natural outfalls or through the County‘s sewer pipes and wastewater treatment facilities, then into the Middle Potomac and Patuxent River basins. Everyone agrees that this is bad for the rivers: in its comments during the Permit application process, the Department recognized that interested parties saw stormwater as “the ‘... biggest form of pollution affecting the Anacostia River ...’ carrying trash and accumulated pollutants and causing flooding in low-lying areas of various watersheds throughout the County.... It becomes fairly easy for all organizations, individuals, and government agencies to agree that urban stormwater is a problem that must be addressed.” And just as everything else in life flows downhill, the pollution (and corresponding degradation of water quality) flows downstream into the waters of the District of Columbia and Prince George‘s County, and eventually into the Chesapeake Bay.
The Clean Water Act (the “Act“), along with its Maryland counterpart and overlapping layers of regulations,2 regulates and seeks to limit water pollution from stormwater runoff into municipal sewer systems that discharge into rivers. This case involves a successful challenge to the terms of the stormwater permit the Department issued to the County in 2010. We begin by discussing the statutory requirements, then walk through the process the County went through with the Department to obtain the Permit, then summarize the proceedings that culminated in this appeal.
A. Statutory Background.
1. The Clean Water Act and federal permit requirements.
The Act was passed in 1972 to “restore and maintain the chemical, physical, and biological integrity of the Nation‘s waters,”
As initially drafted,
At its inception, the Act directed its efforts primarily at the most obvious “point source” pollution. The term “point source” was defined within the Act in a technical way that aimed to capture a broad universe of potential pollution sources:
The term “point source” means any discernible, confined and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, or vessel or other floating craft, from which pollutants are or may be discharged.
Permits for discharges from municipal storm sewers ... (iii) shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques and system, design and engineering methods, and such other provisions as the Administrator or the State determines appropriate for the control of such pollutants.
The Act also raises standards for permits where the “effluent limitations [imposed by
The “maximum extent practicable” language in
2. The role of the States and Maryland‘s permit requirements.
The Act recognizes the “responsibilities and rights” of the various states to respond to System requirements,
- (1) To improve, conserve, and manage the quality of the waters of this State;
- (2) To protect, maintain, and improve the quality of water for public supplies, propagation of wildlife, fish, and aquatic life, and domestic, agricultural, industrial, recreational, and other legitimate beneficial uses;
- (3) To provide that no waste is discharged into any waters of this State without first receiving necessary treatment
or other corrective action to protect the legitimate beneficial uses of the waters of this State; - (4) Through innovative and alternative methods of waste and wastewater treatment, to provide and promote preven-tion, abatement, and control of new or existing water pollution; and
- (5) To promote and encourage the use of reclaimed water in order to conserve water supplies, facilitate the indirect recharge of groundwater, and develop an alternative to discharging wastewater effluent to surface waters, thus pursuing the goal of the Clean Water Act to end the discharge of pollutants and meet the nutrient reduction goals of the Chesapeake Bay Agreement.
(a) Subject to the provisions of this section, the Department may issue a discharge permit if the Department finds that the discharge meets:
(1) All applicable State and federal water quality standards and effluent limitations; and
(2) All other requirements of this subtitle.
*
*
*
(d) The Department shall give public notice of each application for a discharge permit as required by Title 1, Subtitle 6 of this article, and by making available to the public appropriate documents, permit applications, supporting material, plans, and other relevant information.
The statute also allows the Department to “adopt rules and regulations that set, for the waters of this State, water quality standards and effluent standards“:
(a) These standards shall be designed to protect:
(1) The public health, safety, and welfare;
(2) Present and future use of the waters of this State for public water supply;
(3) The propagation of aquatic life and wildlife;
(4) Recreational use of the waters of this State; and
(5) Agricultural, industrial, and other legitimate uses of the waters of this State.
(b) The rules and regulations adopted under this section shall include at least the following:
(1) Water quality standards that specify the maximum permissible short term and long term concentrations of pollutants in the water, the minimum permissible concentrations of dissolved oxygen and other desirable matter in the water, and the temperature range for the water.
(2) Effluent standards that specify the maximum loading or concentrations and the physical, thermal, chemical, biological, and radioactive properties of wastes that may be discharged into the waters of this State.
*
*
*
(c) Effluent standards set under this section shall be at least as stringent as
those specified by the National Pollutant Discharge Elimination System.
This background establishes the simple premise that federal and state laws and regulations limit a county or other governmental entity from letting stormwater runoff go unchecked into our waters, and give that entity the flexibility to devise maximally practicable measures to deal with the problem. Turning that seemingly straightforward anti-pollution premise into real-life permits, however, is a challenging task.
B. The Permit.
In 1996, the Department issued the County its first municipal separate storm sewerage system (“MS4“) permit, for a five-year term. The permit reissued in 2001 and at least once after.6 In 2009, after the renewal application process for the
most recent permit was underway, the Department recognized the need for strict monitoring of stormwater discharge. In its response to comments to the proposed permit, the Department stated that the new Permit would require the County to intensify its efforts, that it would
force [the County] to make major strides toward controlling urban runoff better than ever before. New conditions such as ... requiring an additional twenty percent of the County‘s impervious area to be restored are major additions. Additionally, a firm commitment for TMDL implementation according to the plan that the County is required to develop within one year of permit issuance is the strongest evidence yet of what MDE believes will move these programs forward toward the ultimate goal of meeting water quality standards.
This response came after public comment on a “tentative determination to issue permit” that the Department had issued in September 2008. The appellees filed timely comments on December 1, 2008, and complained (among other arguments) that the draft permit did not include enforceable language or deadlines, did not link in a meaningful way to water quality standards or TMDLs, did not allow for meaningful public participation or review of the County Stormwater Management Program, and lacked adequate monitoring and reporting requirements. After receiving additional comments from other interested parties, the Depаrtment issued a notice of final determination to issue the Permit (the “Notice“) on March 4, 2009 without substantial changes, and it issued the Permit itself on February 16, 2010, for a five-year period that expired on February 15, 2015.7
C. The Proceedings.
This case began not with the current appeal, but an earlier one. After the Department filed the Notice, Anacostia requested a contested case hearing on March 18, 2009. (At the time,
Round Two took a slightly different path because in 2009, the General Assembly changed the procedures for challenging a permit.
The Department responded that the Permit contained all that it needed in requiring the County “to install best management practices” to restore twenty percent of impervious surfaces and meet certain wasteload allocations. It also argued that the policies and provisions of the Manual and the Maryland Stormwater Management Act of 2007 were properly referenced in the Permit.
The trial judge expressed frustration with the Department‘s position at the Hearing, both as to the vagueness of the
After reviewing the permit and the administrative record, the Court is unable to understand why [the Department] adopted the terms in the permit, or how those terms meet the requirements of the law. The permit does not state with clarity what the permittees will do, how they are to do it, what standards apply, or how one will measure compliance or noncompliance. The permit lacks ascertainable metrics for meeting water quality standards that can either be met or not met.
The Court finds that it is not sufficient for the permit to require that permittees engage in best management practices and file annual reports on their activities. Manuals and policies that exist outside of the permit change frequently, and do not inform the public or the Court of what the permit specifically requires. While it is allowable for the permit to require best management practices, specific requirements for meeting water quality standards must be stated in the permit.
The Court finds that the permit‘s requirement to restore 20% of impervious surface is simply too general to show how the permittees will meet water quality standards. It does not explain what the permittee is to do or how its performance is to be measured.
Federal regulations require that the permit include a monitoring program for representative data collection for the term of the permit, including a program to monitor and control pollutants in storm water discharges from sites that are contributing a substantial pollutant loading.
40 C.F.R. § 122.26(d) . The permit requires monitoring in one tributary, and requires the permittees to submit an annual report to MDE regarding all activities under the permit.
The Court finds that these requirements are not sufficient to meet the applicable requirements for monitoring.
This timely appeal followed.
II. DISCUSSION
This appeal presents one overarching question with numerous sub-questions that make it more complex: is the Permit legal? To answer the broader question, we analyze the Permit‘s near-twenty-year history against the statutory and regulatory lattice. And perhaps counterintuitively, we find that the Department‘s expertise (which on review of agency decisions so often gives us reason to defer to an agency) and intimacy with the process and available technology may well be the Permit‘s undoing. There may be rational reasons for requiring the County to prepare plans after approval and incorporate outside materials into the Permit by reference. But those reasons are difficult to discern for anyone who did not live deeply in the weeds of negotiating and preparing it, and because many of the Permit‘s terms are structured as obligations to develop plans, they are insulated from effective review.
We hold first that Congress, by adding
A. Standard of Review.
Our review of an agency decision is highly deferential. We look through the decision of the circuit court and use the same standard of review that the circuit court did. Kim v. Maryland State Bd. of Physicians, 423 Md. 523, 32 A.3d 30 (2011) (citing People‘s Counsel for Baltimore County v. Surina, 400 Md. 662, 681, 929 A.2d 899 (2007)). In a case like this, we review the agency decision at two levels: first, to determine whether the record contains substantial evidence to support the agency decision and second, to determine whether the decision is legally correct. Najafi v. Motor Vehicle Admin., 418 Md. 164, 173, 12 A.3d 1255 (2011) (citation omitted).
For reasons we will explain in Part II.B, wе start with the second step—whether the Department was legally correct in its decision to issue the Permit. We are “under no constraints in reversing an administrative decision which is premised solely on an erroneous conclusion of law.” People‘s Counsel for Baltimore Cnty. v. Maryland Marine Mfg. Co., 316 Md. 491, 497, 560 A.2d 32 (1989); see also HNS Dev., LLC v. People‘s Counsel for Baltimore Cnty., 425 Md. 436, 449, 42 A.3d 12 (2012). A reviewing court should respect “the expertise of an agency in its own field,” Board of Phys. Quality Assur. v. Banks, 354 Md. 59, 69, 729 A.2d 376 (1999) (citations omitted), and the Department correctly points out that an agency‘s authority “may include a broad power to promulgate legislative-type rules or regulations” to assist in implementing applicable statutes. Christ v. Dep‘t of Natural Res., 335 Md. 427, 445, 644 A.2d 34 (1994). Agencies “are created in order to perform activities which the Legislature deems desirable and necessary to further the public health, safety, welfare, and morals,” and “[t]he powers vested in the courts, by statute or inherence, to review administrative decisions does not carry with it the right to substitute its fact-finding process for that of an agency.” Northwest Land Corp. v. Maryland Dep‘t of Env., 104 Md.App. 471, 488, 656 A.2d 804 (1995) (quoting Sec‘y of Health & Mental Hygiene v. Crowder, 43 Md.App. 276, 281, 405 A.2d 279 (1979)).
As to the substantial evidence component of our review, Najafi directs a generous level of deference:
In applying the substantial evidence test, a reviewing court decides “whether a reasoning mind reasonably could have reached the factual conclusion the agency reached.” A reviewing court should defer to the agency‘s fact-finding and drawing of inferences if they are supported by the reсord. A reviewing court “must review the agency‘s decision in the light most favorable to it; ... the agency‘s decision is prima facie correct and presumed valid, and ... it is the agency‘s province to resolve conflicting evidence” and to draw inferences from that evidence.
Id. at 173, 12 A.3d 1255 (quoting Maryland Aviation Admin. v. Noland, 386 Md. 556, 571-72, 873 A.2d 1145 (2005)). And where an agency is acting within its discretion,
B. The Permit Is Subject To § 1342, Not § 1311.
At the threshold, the parties dispute which of the various federal and state laws drive the requirements the Permit must fulfill. The Department argues that the Act does not require an MS4 to comply with the water quality standards articulated in
When first passed in 1972, the Act regulated big municipal stormwater systems. With the benefit of hindsight, it appears that that approach was not practical for MS4s. We agree with the Department that the 1987 amendments, and
But although
Notice outlining an “Interim Permitting Approach for Water Quality-Based Effluent Limitations in Storm Water Permits,”
The interim permitting approach uses best management practices (BMPs) in first-round storm water permits, and expanded or better-tailored BMPs in subsequent permits, where necessary, to provide for the attainment of water quality standards. In cases where adequate information exists to develop more specific conditions or limitations to meet water quality standards, these conditions or limitations are to be incorporated into storm water permits, as necessary and appropriate. This interim permitting approach is not intended to affect those storm water permits that already include appropriately derived numeric water quality-based effluent limitations.
Id. (emphasis added).
Several years later, the United Statеs Court of Appeals for the Ninth Circuit held in Browner that Congress intended
lacked any such requirement, and Congress instead imposed the MEP requirement in
As such, the Ninth Circuit held, Congress intended in
es); Tualatin Riverkeepers v. Oregon Dep‘t of Env‘tal Quality, 235 Or.App. 132, 230 P.3d 559, 564 n. 10 (2010) (citing Defenders of Wildlife with approval and noting the lesser MEP standard in
It falls to the Department, then, to translate these concepts into real-life permits. Over a decade ago, the EPA issued a memorandum (included here in the Department‘s record extract) designed to harmonize the BMP concept and the “maximum extent practicable” language. See November 22, 2002, Memorandum from Robert H. Wayland, III, Director, Office of Wetlands, Oceans and Watersheds, EPA, to Water Division Directors, Regions 1-10. This memorandum counseled in favor of “an iterative approach to control pollutants in storm water discharges,” and recognized that “storm water discharges are due to storm events that are highly variable in frequency and duration and are not easily characterized,” therefore making it difficult to establish hard, numeric limits. In turn, it viewed BMPs as “an appropriate form of effluent limits” to control pollutants, see
EPA expects that the NPDES permitting authority will review the information provided by the TMDL, see
40 C.F.R. § 122.44(d)(l)(vii)(B) , and determine whether the effluent limit is appropriately expressed using a BMP approach (including an iterative BMP approach) or a numeric limit. Where BMPs are used, EPA recommends that the permit provide a mechanism to require use of expanded or better-tailored BMPs when monitoring demonstrates they
are necessary to implement the WLA and protect water quality.
This guidance frames the issue here. Although our analysis relieves the Department and the County of their obligations to comply with
C. The Permit Does Not Comply With State Law Regarding The Permitting Process.
Even under the standards imposed by
participation and meaningful review of the Permit‘s compliance with the law.
1. The Permit does not give meaningful opportunity for notice and comment, and eludes judicial review.
a. The Environment Article requires that the public have an opportunity for notice and cоmment.
Section 9-324 of the Environmental Article requires explicitly that “[t]he Department shall give public notice of each application for a discharge permit as required by Title 1, Subtitle 6.” Subtitle 6, in turn, requires that the public have a full opportunity to participate in the permitting process.
- The name and address of the applicant;
- A description of the location and the nature of the activity for which the permit has been sought;
- A reference to the applicable statutes or regulations governing the application process;
- The time and place of any scheduled informational meeting or public hearing, or a description of where this information can be found;
- A description of where further information about the permit application can be found; and
- Any other information that the Department determines is necessary.
- The objections were not reasonably ascertainable during the comment period; or
- Grounds for the objections arose after the comment period.
Transparency is essential to effectuating the goals of the Act. “Public participation
b. Specific shortcomings of the Permit.
i. The public can‘t comment about decisions that have yet to be made.
To be sure, the process leading up to the Permit ostensibly allowed for several “public participation” opportunities. But the Permit deferred the process of defining important substantive provisions (TMDL implementation plans, SWMP plans; etc.) until well after approval. This creates an obvious flaw: the public can‘t comment on a program that doesn‘t yet exist, and by the time the program did exist, the time for comment on it had passed.10
Under the terms of the Permit, the Department effectively can approve new requirements and management projects without public comment because the County was not required to develop impervious surface restoration plans and TMDL implementation plans until after the Permit was approved. The Permit itself does not include the substantive contents of each program, nor does it require that the programs even be made available to the public for review after the fact. Part E of the Permit, for example, states broad requirements that the County must satisfy in developing, implementing, and maintaining its programs. But that approach is inconsistent with the emphasis on public participation in the Act, which requires permits to include effluent limitations so that citizens can enforce their terms, requirements, and restrictions.
In order to be measurable, a permit must articulate what the County must do, how much of each task the County must do, where the County needs to perform those tasks, and by when the County must complete them.11 For each Permit requirement, the “what” is usually the BMP or activity required, the “how much” is the performance standard the County is expected to meet, the “when” is the specific time (or frequency) the BMP or activity should be complete, and the “where” is the location where the activity must be performed. Unless discernible requirements are contained in the permit itself, the public will have no way to know its terms or to
ii. The Permit is not specific enough.
The Permit eludes notice and comment because there is not enough in it for the public fairly to comment on it. The Act requires that a state permit specify the “type, intervals, and frequency sufficient to yield data which are representative of the monitored activity.”
The Department argues that prior iterations of the Permit required broader monitoring, and it may be that the Permit could satisfy its monitoring obligations by building on and incorporating monitoring work done previously. But if that is what the Department intended, the terms of the Permit need to reflect that so that the Permit‘s overall compliance with the Act‘s monitoring obligations can be understood and tested.
The Permit is similarly quiet about the County‘s reporting requirements. In the absence of specifics, the Department points to the BMPs in the Manual, which “are designed to be flexible so that regulatory agencies may adapt them to the highly variable nature of stormwater discharges.” (Emphasis in original.) That may be so, but the Department must demonstrate in the Permit which of these BMPs it is choosing—otherwise, we are left with a Permit that is simply a now fifteen-year-old (and very long) Manual.13 We understand the need for flexibility, but someone seeking to understand the Permit‘s terms,
iii. The Permit overrelies on incorporation by reference.
The Permit‘s generality is compounded by the way it incorporates outside sources by reference. There is nothing wrong per se with that approach, but the result here is that someone outside the negotiations can‘t tell where to look to understand the Permit or how to challenge its terms. This is particularly true with regard to the Manual, a 589-page list of “best management practices.” Chapter 1 of the Manual states that “[o]ver the last 14 years, tens of thousands of [BMPs] have been constructed in an attempt to meet program mandates.” After the County selects appropriate BMPs, the Manual is meant to help in the process of actually implementing the practices, by
provid[ing] design guidance on the most effective planning techniques, and nonstructural and structural BMPs for de-
velopment sites, and to improve the quality of BMPs that are constructed in the [s]tate, specifically with regard to performance, longevity, safety, ease of maintenance, community acceptance and environmental benefit.
Chapter 3 of the Manual identifies five groups of structural water quality Stormwater BMPs: (1) ponds, (2) wetlands, (3) infiltration practices, (4) filtering systems, and (5) open channels. The chapter goes on to discuss “sets of BMP performance criteria” for each BMP listed above. Of course, if the County opts to implement a new BMP, it must submit monitoring data to demonstrate that it meets these performance criteria. The Manual might provide some understanding, for example, of why the County would choose “ponds” for a given location, and why that strategy may or may not be successful in reducing pollution to the maximum extent practicable. But in the context of this Permit, there is no way of knowing which BMPs the County will select.14 And that leaves no way to know what the County will be required to do until after the County does it, and no way to apply even an appropriately deferential level of review to the Department‘s substantive directions to the County.
We see compelling similarities to the permit in Waterkeeper Alliance, Inc. v. EPA, 399 F.3d 486 (2d Cir.2005), in which the United States Court of Appeals for the Second Circuit held that NPDES permits for concentrated animal feeding operations (“CAFOs“) lacked “any meaningful review of the nutrient management plans” developed by the applicants, and also “fail[ed] to require that the terms of the nutrient management plans be included in the NPDES permits.” Id. at 498. The court held that regulation of the CAFO nutrient plans
(which strike us as analogous to the MS4 regulatory program here) had to be incorporated into a facility‘s NPDES permit because a permit that omitted specific waste application rates did “nothing to ensure that each Large CAFO has, in fact, developed a nutrient management plan
There is no doubt that under the CAFO Rule, the only restrictions actually imposed on land application discharges are those restrictions imposed by the various terms of the nutrient management plan, including the waste application rates developed by the Large CAFOs pursuant to their nutrient management plans. Indeed, the requirement to develop a nutrient management plan constitutes a restriction on land application discharges only to the extent that the nutrient management plan actually imposes restrictions on land application discharges.
Id. at 502 (emphasis added).
Like the nutritional plans discussed in Waterkeeper Alliance, the Management Plans the Permit requires the County to develop represent the only restrictions on stormwater pollutants flоwing into and from this MS4. For that reason, it is not enough for the Permit simply to require the County to develop plans consistent with the Manual and leave it at that. The Permit must at least allow the County and the public to understand how the County plans to restrict stormwater discharges and, subject to the appropriately deferential standard, to challenge the Department‘s ultimate directions.
iv. The Permit contains no meaningful deadlines or ways to measure compliance.
The Permit purports to require, within a year of its effective date, implementation plans that include “the actions and deadlines by which those actions must be taken to meet the required pollutant load reduction benchmarks and [wasteload allocations] within the specified time frame.” Determining the means to the ends, including TMDLs and SWMPs, has been left to the County, which gets one year out of the five-year lifespan of the Permit simply to devise implementation plans.
In layman‘s terms, the Permit seems to say that the County has a deadline of a year to set its deadlines. But as a practical matter, that open-ended, goal-oriented statement articulates no specific method within the Permit (like setting out those benchmarks, for example) for achieving those goals or measuring progress. Put another way, the County seemingly сould be in compliance if, within a year of the Permit‘s issuance, it laid out a plan with deadlines of twenty years from now. The Permit imposes no timeframe for executing the plans, and there are not clear requirements for what the aspirational plans must include.
Without measurable commitments, anything could be deemed “in compliance” with the Permit. And without deadlines for compliance and implementation, the County could plan while postponing implementation, an outcome that effectively would circumvent the NPDES permitting program. This is not to say that the Permit must list and measure minute details or water quality standards, only that it must contain some discernible and meaningful milestones of planning, implementation, or achievement that can be understood and measured and, to our earlier point, that the public can review and comment upon.
The description of “Management Programs” in the Permit is also insufficient to allow meaningful evaluation of any monitoring. These programs appear to be an important aspect of the Permit, but are not incorporated as enforceable conditions. The Permit connects no specific or measurable BMPs to the various management programs. It requires no justification for why a given BMP or strategy was selected, and how that program or strategy will reduce discharges to the maximum extent
This lack of meaningful deadlines was illustrated well at oral argument, when we asked counsel for Montgomery County
whether the County had actually approved a plan that the Department then approved. Counsel first responded that yes, a plan “would have been” submitted. When pressed, counsel responded with continued hedging: “I will say that they would have approved it.” The fact that counsel for the County couldn‘t even tell us the status of the Permit‘s progress highlights the toothlessness of the Permit‘s terms and the difficulty for anyone to know (or ask) whether the County is complying with them.
2. The agency decision to issue the Permit was unsupported by substantial evidence with respect to TMDLs and the twenty percent requirement.
Once the County reworks the Permit in a way that allows for meaningful notice and comment, it still must address the absence of objective metrics for what the parties agree are two of its most important elements: the twenty percent requirement and setting TMDLs.15
a. The twenty percent requirement.
Thе Department argues that the Permit appropriately “requires the County to install controls on twenty percent of impervious surfaces and to regularly review and refine its [BMPs] to achieve steady and measured reductions in pollutants.” But we see nothing in the Permit that explains how we or anyone can define the universe of impervious surfaces. Only one of the three sources the Department cites sends us to the Permit itself; the pages cited to govern “Watershed Restoration” (Part III.G), “Assessment of Controls” (Part
III.H), “Program Funding,” (Part III.I), and “TMDLs” (Part III.J). None of these gives any guidance as to exactly what constitutes “impervious surfaces.” The Department claims that the twenty percent requirement is “specific, measurable, and enforceable,” and it purports to lay out how the twenty percent is calculated, based on using the acreage designations from the prior permit‘s designation of ten percent of impervious surfaces in the County (in turn citing not even to the outdated permit, but to the “Annual Report for 2006 NPDES Municipal Separate Storm Sewer System Permit” that is included in the record extract):
The permit requires the County to implement controls on 20 percent of its previously uncontrolled impervious areas. Because the prior permit requirеd the County to install best management practices on 10 percent of its impervious areas, the County already has in place a mechanism for calculating the total acreage of land that does not have stormwater controls. That acreage comes to 21,458 acres—which excludes the 10 percent
already controlled under the prior permit—and 20 percent of that amount comes to 4,292.
It cannot be that the universe of impervious surfaces has remained constant since 2006; by 2009, when this permitting process began, this information was already three years old. So the Department‘s calculation is grounded in outdated calculations and, therefore, unsupported by substantial evidence.16
Anacostia is also correct that the Permit does not actually impose restoration of twenty per cent of all impervious surfaces within the County, but only mandates restoration of twenty percent of “impervious surface area that is not restored to the MEP [maximum extent practicable.]” As with so many other parts of the Permit, this definition requires
another subjective calculation—where someone will need to determine what has not been restored to the maximum extent practicable—that is completely unreviewable.
The Department also contends broadly that the standards it applies for BMPs must be flexible “so that regulatory agencies may adapt them to the highly variable nature of stormwater discharges.” We don‘t disagree with this proposition, and we are keenly aware that the Department has the expertise (far beyond the ken of this or any court) to determine these standards. But even those flexible standards have to be expressed in a way that gives meaning to the Permit, and that allows non-expert reviewing bodies to do their jobs.
The Department claims that the Permit articulates sufficiently specific BMPs for impervious surfaces by incorporating the Manual and other documents, and it argues that the BMPs in the Manual “have measurable outcome[s];” it points in particular to “general performance standards for stormwater management in Maryland” that appear in two pages of the Manual. The Manual is one of the three “scientific texts developed by the Department” that it claims encapsulates twenty-seven years of research. The others are a “BMP Assessment” (a March 21, 2009 report whose full title is “Developing Nitrogen, Phosphorus and Sediment Reduction Efficiencies for Tributary Strategies, BMP Assessment: Final Report, 3/31/2009“), and a manual entitled “Accounting for Stormwater Wasteload Allocations and Impervious Acres Treated” (with the ambiguous date of “June (Draft) 2011” (emphasis added), which we will short-form as the “2011 Manual“). The Department says that it standardized best management practices in the Manual, and has technical guidelines “in place” based on the BMP Assessment and the 2011 Manual. But the Department‘s arguments are indecipherable. The “general performance standards” to which it cites don‘t appear, to us at least, to articulate useful or enforceable numbers, and a broad citation to three manuals (dated four, six, and fifteen years ago) leave the contours of the twenty percent requirement unclear.
b. The TMDL requirement.
Anacostia argues that the Permit lacks the necessary clarity for attaining TMDL requirements, and that its provisions are not supported by facts or explanations. We agree. Part III.J requires the County
The Permit incorporates, by reference, pollutant-loading limits (called Waste Load Allocations, or “WLAs“) in approved TMDLs. It does not require the County to demonstrate that its TMDL implementation plans will meet the required pollution reductions or defend them against challenge, and it doesn‘t specify any interim or final deadlines for meeting those reductions. The County is left to set its own deadlines, without any outside limits. In the event that “WLAs are not being met according to the benchmarks and deadlines contained in the County‘s TMDL implementation plans, an iterative approach shall be used where additional or alternative Stormwater controls are proposed and implemented in order to achieve WLAs.” It is hard to know what this means (and it is the language that was the source of palpable frustration on the part of the trial judge), but we know that there are no specific guidelines for implementing these “adaptive management activities,” and no elaboration on what they might entail.
Perhaps inadvertently, the Department identified the problem best at oral argument: when the Court criticized the TMDL plan because it can‘t be challenged by the public, counsel answered that TMDLs are “on the MDE website,” and that “there‘s a separate TMDL process.” But that advice leads to a thicket: a search of the term “TMDL” on the MDE website yielded 771 results, the first of which purports to explain “TMDL Implementation in Maryland” from a 2006 issue of an “e-MDE” publication. See http://mde.maryland.gov/programs/ResearchCenter/ReportsandPublications/Pages/ResearchCenter/publications/general/emde/vollno9/tmdl.aspx (last viewed February 19, 2015). And although there may be a “TMDL process,” that process leaves anyone seeking to know what TMDLs are at issue in this Permit completely in the dark.
*
*
*
It may be that the actions and standards that the Department and County have in mind under this Permit satisfies the requirements that the Act imposes on both, and we agree with the Department about what the law generally requires. But there is no way for the public or for us to know from the Permit itself whether they do or not, and we agree with the circuit court that the Permit must be revised accordingly. We recognize the Department‘s expertise in this area, and we know that it is not our role to dictate precisely how the Department must balance the complex realities of managing pollution in a large stormwater system against the important public policies of transparency, public participation, and meaningful judicial review. It seems, though, that the more details are framed as future obligations to plan or propose plans, the harder it will be for the public to participate
JUDGMENT OF THE CIRCUIT COURT FOR MONTGOMERY COUNTY AFFIRMED AND CASE REMANDED TO THE MARYLAND DEPARTMENT OF THE ENVIRONMENT FOR PROCEEDINGS NOT INCONSISTENT WITH THIS OPINION. COSTS TO BE PAID BY APPELLANTS.