HARDIN COUNTY DRAINAGE DISTRICT 55, DIVISION 3, LATERAL 10, Appellee, v. UNION PACIFIC RAILROAD COMPANY, Appellant.
No. 11-1637
Supreme Court of Iowa
Feb. 1, 2013
826 N.W.2d 507
VII. Disposition.
On further review, we find the policy is not ambiguous and does not provide coverage as a matter of law. Additionally, we find there is no genuine issue of material fact as to the application of the reasonable expectations doctrine and conclude, as a matter of law, that it does not apply. Therefore, we vacate the decision of the court of appeals, reverse the judgment of the district court, and remand the case to the district court with instructions to enter judgment in favor of Grinnell Mutual on its motion for summary judgment.
COURT OF APPEALS DECISION VACATED; DISTRICT COURT JUDGMENT REVERSED AND CASE REMANDED WITH INSTRUCTIONS.
Michael A. Smith and Shean D. Fletchall of Craig, Smith & Cutler, LLP, Eldora, for appellee.
ZAGER, Justice.
In this appeal, we must determine under Iowa‘s laws relating to drainage districts, who is responsible for the costs to repair and improve old underground drainage tiles which run under a railroad roadbed. Hardin County Drainage District 55 (Hardin County) argues that the Union Pacific Railroad Company (Union Pacific) should be responsible for repair of a subterranean drainage tile found under its roadbed, as railroads are statutorily required to pay for the construction and maintenance of culverts and bridges occurring at natural waterways on the railroad‘s right-of-way. Union Pacific counters that underground drainage tiles are not “culverts” as defined by the relevant statute.
The district court agreed with the drainage district, finding the railroad breached its statutory duty to repair the drainage tile. For the reasons set forth below, we disagree, finding the drainage tile does not fit the statutory definition of a culvert obligating the railroad to pay for the necessary repairs. We therefore reverse the judgment of the district court and remand the case to the district court for dismissal.
I. Factual Background and Procedural History.
Due to ancient glacier activity, much of north central and northwest Iowa consists of land that simply does not drain well. Up until drainage systems were installed, the land was either very wet or consisted of swamps. In order to transform these lands into the productive farm land that exists today, farmers began tiling their fields to allow subsurface drainage. As
The railroad was built in Hardin County in 1910. Drainage District 55 was likely established between 1915 and 1920 in Hardin County. Drainage districts are divided into divisions and further broken down by laterals. The one in issue here is the Lateral 10 tile line, which became a part of Drainage District 55 in 1917. This lateral serves approximately forty-four landowners, and the tile in question services between 560 and 580 acres of farmland. This tile carries both surface and subsurface water from the west side of the railroad tracks to the east side.
In the spring of 2007, workers for Union Pacific noticed a void in the roadbed under its tracks. In compliance with federal railroad safety regulations, Union Pacific workers repaired the railroad bed by adding rock ballast to fill the void. The rock caused the already damaged drain tile to become plugged, thereby preventing drainage and causing flooding to farmland on the west side of the roadbed.
It is estimated that the clay underground drainage tile that is at issue in this case was installed around 1914, so it has been in use for nearly a century. It is also thought to have been originally installed by one of the adjacent landowners, not the railroad. It is likely there are hundreds of these underground drainage tiles that cross the Union Pacific railroad bed in Hardin County alone. There are no records as to the location of these drainage tiles. Additionally, this particular drainage tile was located 6.62 feet below the bottom of the ditch on the west side of the railroad bed. Union Pacific claims it had no knowledge of the existence of this drain tile, and it is not visible from an inspection of the area. There is a railroad culvert carrying surface water from the west side of the roadbed through to the east side located not far from the disputed drain tile.
On April 12, 2007, the drainage district provided Union Pacific with the statutory notice under
After completion of the repairs and improvements, Union Pacific refused to pay the drainage district. As a result, the drainage district filed a petition at law claiming the railroad breached its statutory duty to repair; was negligent in its failure to discover the drainage tile; was negligent in its ballast repair, which caused further damage to the drain tile and resulted in crop loss; and claimed further relief. The matter was tried to the court. A decree was entered by the court on July 18, 2011. In its order, the court awarded damages to the drainage district in the amount of $47,871 for the costs of the construction, $3055 for permit fees, $16,788 for surveying, engineering and construction observation, and $300.64 for administration and publication costs. Additionally, the district court entered judgment against Union Pacific on a negligence
II. Standard of Review.
The case was tried at law, and thus, the scope of review is for errors at law.
III. Statutory Framework.
Once a drainage improvement has been installed, it will eventually need to be repaired. Section 468.126 requires the board of supervisors to keep the improvement in repair in the following manner:
The board at any time on its own motion, without notice, may order done whatever is necessary to restore or maintain a drainage ... improvement in its original efficiency or capacity, and for that purpose may remove silt and debris, [or] repair any damaged structures....
The board is also allowed to consider replacing a tile line rather than repairing a tile line, if laying a new tile line would be “more economical.”
Drainage district improvements must necessarily cross railroad rights-of-way. Sections 468.109 to 468.112 address how
to construct such improvement according to said plans and specifications at the place designated, across its right-of-way, and to build and construct or rebuild and reconstruct the necessary culvert or bridge where any ditch, drain, or watercourse crosses its right of way, so as not to obstruct, impede, or interfere with the free flow of the water therein, within thirty days from the time of the service of such notice upon it.
If the culvert or bridge that is needed at the intersection is located at a natural waterway or a place provided by the railroad, then the cost of the bridge or culvert must be borne by the railroad without reimbursement from the drainage district.
Our analysis then centers on two issues. First, we must determine whether the tile in question is a culvert within the meaning of chapter 468. If we make the determination that it is a culvert, we must then determine whether this was a “natural waterway.” If the tile is both a culvert and is located on a natural waterway or a place chosen by the railroad, it is the responsibility of Union Pacific to pay for repairs to the tile. Alternatively, if we find that the tile is not a culvert, or that it does not occur at a natural waterway or a place chosen by the railroad, the drainage district is obligated to pay for repairs to the tile.
This issue was presented to us recently. See Chi. Cent. & Pac. R.R., 816 N.W.2d at 369-70. However, in Chicago Central, we declined to reach the issue because the plaintiff did not seek the appropriate remedy. Id. at 374 (holding that a mandamus action, not a claim for reimbursement, was the appropriate remedy for a railroad demanding that a drainage district repair an underground tile).
IV. Analysis.
A. Statutory Construction.
At its heart, this case involves statutory
We also examine statutory language holistically.
To ascertain the legislature‘s intent, we will assess the statute in its entirety, not just isolated words or phrases, and we will seek to interpret it so that no part of it is rendered redundant or irrelevant. We strive for a reasonable interpretation that best achieves the statute‘s purpose and avoids absurd results....
Legislative intent is ascertained not only from the language used but also from the statute‘s subject matter, the object sought to be accomplished, the purpose to be served, underlying policies, remedies provided, and the consequences of the various interpretations. State v. McCullah, 787 N.W.2d 90, 94-95 (Iowa 2010) (citations and internal quotation marks omitted).
B. Intent of the Legislature.
1. What the legislature intended to accomplish. We do not interpret words or phrases in a vacuum. In order to determine what the legislature intended to be considered a culvert, we must begin with an analysis of what the legislature intended to accomplish with its statutory scheme. Chapter 468 is designed to encourage the “drainage of surface waters from agricultural lands and all other lands.”
We are mindful of the entire statutory scheme the legislature imposed when determining the intent of the legislature. See McCullah, 787 N.W.2d at 94. Hardin County argues the railroad should repair any drainage structure that is located at or under its right-of-way. We do not believe this is what the legislature intended. It is reasonable to require a railroad to bear the initial expense of constructing or reconstructing structures such as culverts and bridges, to maintain the natural flow of water through its roadbed. It is equally reasonable to require the railroad to keep these culverts and bridges in proper repair to allow the natural flow of water.
Our prior caselaw supports this allocation of financial responsibility as well in a situation not governed by this statute. “If waters that do not belong there are brought upon that area, [and] it is not shown to have been through any act or fault of [the defendant railroad company], [the defendant railroad company] cannot be held responsible for it.” Hinkle v. Chi., R.I. & P. Ry., 208 Iowa 1366, 227 N.W. 419, 420 (1929).
2. Definition of a culvert. Chapter 468 provides several definitions to aid in statutory interpretation, but it does not include a definition of the word “culvert.”
In contrast to a very general dictionary definition, Union Pacific presented testimony from Mark McCune, the railroad‘s Director of Structures Design, as to the definition of a culvert recognized in the field of railroad engineering. He testified that a culvert‘s function is to “provide passage from one side of the railroad embankment to the other, normally for water.” Additionally, he testified that each end of a culvert opens to the air. In contrast, the drainage tile at issue here is part of a larger system of tiles that does not open to the air. Further, McCune testified that the American Railway Engineering and Maintenance-of-Way Association (AREMA) publishes a technical manual that indicates the technical definition of culvert in the railroad context excludes subsurface water. Specifically, it refers to a culvert as “being an enclosed channel substituted for an open waterway.”
Hydrologist Chris Vokt presented a very similar definition. After being asked about the technical definition of a culvert, he testified, “Culverts typically found under railroads and roads, open both ends.
While not dispositive, the legislature has defined culverts in another context. As used in the highway context, the Code defines a culvert to
include[] any structure not classified as a bridge which provides an opening under the roadway, except that this term does not include tile crossing the road, or intakes thereto, where tile is part of a tile line or system designed to aid subsurface drainage.
The legislature has also discussed the responsibility for railroad crossings in other contexts.
Because we reach the conclusion that the drainage tile is not a culvert, we need not reach the remaining issue of whether the drainage tile occurs at a natural waterway or in a place chosen by the railroad. The railroad is not responsible for the repairs to this drainage tile or the other related damages. Additionally, based on our decision, we need not reach the other issues raised by the parties on appeal.
V. Disposition.
For the reasons stated above, we hold the railroad is not statutorily obligated to pay for repairs or improvements to the subterranean drainage tile at issue. We reverse the judgment of the district court and remand for entry of an order dismissing this case with prejudice.
DISTRICT COURT JUDGMENT REVERSED AND CASE REMANDED FOR DISMISSAL.