Grand Canyon Trust; Center for Biological Diversity; Sierra Club; and Havasupai Tribe, Plaintiffs, v. Heather Provencio, Forest Supervisor, Kaibab National Forest; and United States Forest Service, U.S. Department of Agriculture, Defendants, and Energy Fuels Resources (USA), Inc.; and EFR Arizona Strip LLC, Intervenor-Defendants.
No. CV-13-8045-PCT-DGC
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF ARIZONA
May 22, 2020
ORDER
This case arises from the proposed reopening of the Canyon Mine, a 17-acre uranium mine located six miles south of the Grand Canyon in the Kaibab National Forest. The Havasupai Tribe and three environmental groups - Grand Canyon Trust, Center for Biological Diversity, and Sierra Club - brought this suit for declaratory and injunctive relief against the United States Forest Service and the Supervisor of the Kaibab National Forest (collectively, the “Forest Service“). Doc. 1. The Canyon Mine‘s owners and operators, Energy Fuels Resources (USA), Inc. and EFR Arizona Strip, LLC (together, “Energy Fuels“), intervened as Defendants. Docs. 30, 31, 35.
I. Background.
The history of the Canyon Mine spans more than 30 years. In October 1984, Energy Fuels submitted to the Forest Service a proposed Plan of Operations for the mine. AR Doc. 2 at 193-221.1 The Forest Service completed a Final Environmental Impact Statement (“FEIS“) pursuant to the National Environmental Policy Act (“NEPA“). AR Doc. 3. In September 1986, the Forest Service issued a Record of Decision (“ROD“) approving construction and operation of the Canyon Mine under a modified version of the Plan (the “1986 Plan“). AR Doc. 6. Several administrative appeals followed, and the Forest Service affirmed the ROD. AR Doc. 188 at 3972. The Ninth Circuit rejected a challenge to the ROD in August 1991. See Havasupai Tribe v. United States, 943 F.2d 32 (9th Cir. 1991).
Shortly thereafter, Energy Fuels began constructing the mine. It built surface structures and sank the first 50 feet of a 1,500-foot shaft, but placed the mine on standby status in 1992 because of low prices in the uranium market. AR Doc. 525 at 10487. For the next 20 years, the mine was inactive but maintained under the interim management portions of the 1986 Plan. AR Doc. 481 at 10314.
In January 2012, the Secretary of the DOI, acting under authority of the Federal Land Policy and Management Act (“FLPMA“), withdrew for 20 years some one million acres of public land from mineral location and entry under the
In August 2011, Energy Fuels notified the Forest Service that it intended to resume mining under the 1986 Plan. AR Doc. 439. In response, the Forest Service decided to prepare a mineral report to determine whether the Canyon Mine had “valid existing rights,” and therefore was not affected by the Withdrawal (the “VER Determination“). See
The
In addition to the VER Determination, the Forest Service performed a “Mine Review” before the mine reopened. AR Doc. 533. The review was conducted by a 13-person interdisciplinary team with expertise in minerals and geology, surface and groundwater, air quality, transportation, tribal consultation, heritage resources, vegetation, the NEPA, and socioeconomic issues. Id. at 10597. Among other matters, the team evaluated the sufficiency of the 1986 Plan and the original FEIS and ROD; historical and religious issues related to local tribes; the effect of resumed operations on the quality of air, surface water, and groundwater; and the effect of resumed operations on wildlife and any threatened, endangered, or sensitive species. Id. at 10592-637. The Mine Review was finished on June 25, 2012, and concluded that operations could resume at the Canyon Mine under the 1986 Plan. Id. at 10594.
Plaintiffs filed this lawsuit in March 2013, seeking declaratory and injunctive relief under the
On April 7, 2015, the Court granted summary judgment to Defendants on all claims. Doc. 166. On claims one through three, the Court held that the VER Determination was not a “major federal action” requiring a new environmental impact study under the NEPA or an “undertaking” requiring a full § 106 consultation under the NHPA, and that the Forest
The Ninth Circuit initially affirmed on all grounds. See Havasupai Tribe v. Provencio, 876 F.3d 1242 (9th Cir. 2017). One year later, however, the Ninth Circuit withdrew its original decision and entered an amended order that affirmed the rulings on claims one through three, but held that claim four fell within the FLPMA‘s zone of interests. The Ninth Circuit remanded claim four for consideration on the merits. Havasupai Tribe v. Provencio, 906 F.3d 1155, 1166-67 (9th Cir. 2018).
The parties now move for summary judgment on claim four. Docs. 226, 233, 234. Plaintiffs argue that the VER Determination is invalid because the Forest Service failed to consider all relevant costs in its profitability analysis of the Canyon Mine. Doc. 228 at 13-22. Defendants contend that Plaintiffs lack Article III standing and otherwise are entitled to no relief because the VER Determination was not legally required. Docs. 233-1 at 8-11, 234-1 at 12-20. Defendants further contend that claim four fails on the merits because the VER Determination included all relevant costs and must be upheld under the APA‘s deferential standard of review. Docs. 233-1 at 11-20, 234-1.
II. Article III Standing.
The Court previously held that the Forest Service‘s VER Determination was not required by law - that mining could have resumed at the Canyon Mine on the basis of the 1986 Plan. Doc. 166 at 6-11. Based on this holding, the Forest Service now contends that Plaintiffs lack Article III standing to bring claim four. Doc. 234-1 at 12-20. It argues that because authorization to operate the mine derives solely from the 1986 Plan approval, and not from the VER Determination, Plaintiffs’ alleged injuries are traceable to the 1986 Plan approval alone. Id. at 19. As a result, claim four fails two requirements of Article III
The Court previously held that claim four satisfied these standing requirements. Doc. 166 at 13-16. On appeal, the Ninth Circuit also was “satisfied that plaintiffs have suffered injuries in fact that are fairly traceable to the Service‘s actions and that could be redressed by a favorable judicial determination.” Havasupai Tribe, 906 F.3d at 1162 n.3. Plaintiffs argue that this Ninth Circuit conclusion is “both law of the case and binding precedent.” Doc. 238 at 7 (quoting Nordstrom v. Ryan, 856 F.3d 1265, 1270 (9th Cir. 2017)). The Court agrees.
The Ninth Circuit specifically found that Plaintiffs satisfy the elements of Article III standing on claim four. See Havasupai Tribe, 906 F.3d at 1162 n.3. This ruling was not dictum, as the Forest Service contends (Doc. 234-1 at 19), but a holding essential to the court‘s judgment. “The federal courts are under an independent obligation to examine their own jurisdiction, and standing is perhaps the most important of the jurisdictional doctrines.” FW/PBS, Inc. v. City of Dallas, 493 U.S. 215, 231 (1990) (quotation marks, brackets, and citations omitted).
Nor would the Ninth Circuit have reached the issue it addressed on appeal - whether claim four satisfied the zone-of-interests test - without first confirming that Plaintiffs have Article III standing to bring the claim. See Nordstrom, 856 F.3d at 1270 (“In Nordstrom I, we necessarily decided that Nordstrom had standing to bring his Sixth Amendment claim“); see also Steel Co. v. Citizens for a Better Env‘t, 523 U.S. 83, 93-102 (1998) (Article III standing must be determined before addressing whether a cause of action exists); Lexmark Int‘l, Inc. v. Static Control Components, Inc., 572 U.S. 118, 127-28 (2014) (noting that “prudential standing” is a misnomer and holding that the zone-of-interests requirement is not jurisdictional, but concerns whether a cause of action exists). The Ninth Circuit‘s decision “is both the law of the case and binding precedent that [the Court] must follow.” Nordstrom, 856 F.3d at 1270; see California v. U.S. Dep‘t of Health & Human Servs., 941 F.3d 410, 421 (9th Cir. 2019). The Court will deny the Forest Service‘s motion on the issue of standing.
III. Defendants’ Arguments Based on Plaintiffs’ Requested Relief.
Plaintiffs ask the Court to set aside the VER Determination and enjoin all activity at the Canyon Mine until a new VER Determination can be completed. Doc. 228 at 22; see Doc. 115 at 28-29. Energy Fuels argues that because the VER Determination was not legally required and has no effect on the 1986 Plan or continued operations at the mine, Plaintiffs are entitled to no relief. Doc. 233-1 at 8-11. The Court concludes that Plaintiffs, if successful, could have the VER Determination set aside, but could not obtain an injunction of activity at the Canyon Mine. The Court will address the injunction issue first.
A. Enjoining Activity at the Canyon Mine.
By its own terms, the Withdrawal did not extinguish mining rights that already existed. The Court previously held that the Withdrawal required a validity determination only for mines which required a new plan of operations. Doc. 166 at 8-9 (citing AR Doc. 481 at 10310; 77 Fed. Reg. 2563, 2012 WL 122658 (Jan. 18, 2012)); see
Given this holding, which was not disturbed on appeal, the Court concludes that Plaintiffs would have no legal basis to enjoin mine operations if the VER Determination was set aside. Cf. In re Ctr. for Biological Diversity, 162 IBLA 268, 281 (2004) (“[U]ntil the [DOI] undertakes a mining or mill site claim contest . . . and renders a final determination of invalidity, it is well established that the claimant will be permitted to engage in mining and processing operations.“) (citations omitted); In re Sw. Res. Council, 96 IBLA 105, 118-24 (1987) (explaining that “[t]he holder of a valid mining claim has the right, from the time of location, to extract, process and market the locatable mineral
B. Setting Aside the VER Determination.
Energy Fuels argues that the Court need not reach the merits of claim four because the VER Determination was not legally required and setting it aside would have no effect on the mining project. Doc. 233-1 at 10-11. But federal agencies often have discretion on whether to take a particular action. Fed. Election Comm‘n v. Akins, 524 U.S. 11, 25 (1998). When they do, those adversely affected by the action generally may sue to have it set aside. Id.; see Abbott Labs. v. Gardner, 387 U.S. 136, 140 (1967) (discussing presumption of reviewability of agency action); Citizens to Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 410 (1971) (same). If a reviewing court finds that the agency abused its discretion or committed legal error, the court “will set aside the agency‘s action and remand the case - even though the agency . . . might later, in the exercise of its lawful discretion, reach the same result for a different reason.” Fed. Election Comm‘n, 524 U.S. at 25 (citing SEC v. Chenery Corp., 318 U.S. 80 (1943)).4
VER determinations also enable the Forest Service and the DOI to make “a decision on whether or not to contest the [mining] claim.” Forest Service Manual § 2819.1 (AR 7312); see Grand Canyon Tr., 98 F. Supp. 3d at 1052;
The VER Determination is subject to judicial review.5
IV. APA Standard of Review.
“The APA‘s standard of review is ‘highly deferential, presuming the agency action to be valid and affirming the agency action if a reasonable basis exists for its decision.” Cal. Pac. Bank v. Fed. Deposit Ins. Corp., 885 F.3d 560, 570 (9th Cir. 2018) (quoting Indep. Acceptance Co. v. California, 204 F.3d 1247, 1251 (9th Cir. 2000)). A court may set aside a final agency action only where the plaintiffs show that the action is “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.”
V. The Profitability Test and the VER Determination.
In determining that valuable mineral rights existed at the Canyon Mine, and that Energy Fuels therefore had valid existing rights under the 1872 Mining Law, the Forest service applied the “prudent man” and “marketability” tests recognized in United States v. Coleman, 390 U.S. 599, 602 (1968). It concluded that uranium at the mine could, under present economic conditions, “be mined, removed, transported, milled and marketed at a profit.” AR Doc. 525 at 10483, 10486, 10506.
Plaintiffs contend that this determination is invalid because the Forest Service failed to consider costs of environmental monitoring, wildlife conservation, future environmental
A. The Prudent Man and Marketability Tests.
Congress has delegated to the Secretary of the Interior “the responsibility of determining the validity of mining claims.” Rawls v. Sec‘y of Interior, 460 F.2d 1200, 1200-01 (9th Cir. 1972). For more than 100 years, the Secretary has applied a “prudent man” test to assess claim validity. See Castle v. Womble, 19 L.D. 455, 457 (1894). Under this test, a mineral deposit is “valuable” as required by the Mining Law if it is “of such a character that ‘a person of ordinary prudence would be justified in the further expenditure of his labor and means, with a reasonable prospect of success, in developing a valuable mine.‘” Coleman, 390 U.S. at 602 (quoting Castle, 19 L.D. at 457). The Supreme Court “has approved the prudent-man formulation and interpretation on numerous occasions.” Id. (citing Chrisman v. Miller, 197 U.S. 313, 322 (1905); Cameron v. United States, 252 U.S. 450, 459 (1920); Best v. Humboldt Placer Mining Co., 371 U.S. 334, 335-36 (1963)); see also Watt v. W. Nuclear, Inc., 462 U.S. 36, 58 n.18 (1983).
In Coleman, the Supreme Court addressed another test developed by the Secretary known as “the marketability test.” Coleman, 390 U.S. at 600. That test requires a mine claimant to show “that the mineral can be ‘extracted, removed and marketed at a profit.‘” Id. The Court upheld “the marketability test [as] an admirable effort to identify with greater precision and objectivity the factors relevant to a determination that a mineral deposit is ‘valuable.‘” Id. at 602. The Supreme Court found that “the prudent-man test and the marketability test are not distinct standards, but are complementary in that the latter is a refinement of the former.” Id. at 603.
B. The VER Determination.
Consistent with this law, the VER Determination considered whether, “under present economic conditions, the uranium deposit [at the Canyon Mine] could be mined,
The relevant dates for determining the validity of the mining claims were July 21, 2009, the date when the Withdrawal was first proposed by the Secretary, and April 18, 2012, the date of the VER Determination. AR Doc. 525 at 10487; see 65 Fed. Reg. 41,724, 41,725-26 (July 6, 2000) (DOI policy explaining applicable “marketability dates“). The actual mineral examination was conducted over several months in late 2011 and early 2012. AR Doc. 525 at 10483, 10486.
The Forest Service examiners made multiple trips to the Canyon Mine and also visited Energy Fuels’ offices in Fredonia, Arizona, its Arizona One Mine north of the Grand Canyon, and its White Mesa Mill in Blanding, Utah. Id. at 10486. Their field work included verifying the mine boundaries, documenting development activities, and examining and testing drill core samples. Id. at 10487, 10495-97. The examiners analyzed geological reports and maps to obtain information about mineralization of the area, including the many uranium-bearing breccia pipes on the Colorado Plateau. Id. at 10487-95. They reviewed Forest Service case files and Energy Fuels’ records and data for the Canyon Mine and the Arizona One Mine. Id. at 10487-89. They evaluated the methods and results of Energy Fuels’ mining and milling operations. Id. at 10498-99. They also performed an economic analysis based, among other things, on the tonnage and grade of the uranium ore to be mined, Energy Fuels’ capital and operating costs, commodity pricing, and a cash flow feasibility analysis. Id. at 10499-10505.
After completing their mineral review, the examiners made the following findings:
- The Colorado Plateau hosts many uranium-bearing breccia pipes, and numerous studies have documented their importance as a source of uranium resources for the country. More than 17 million pounds of uranium have been produced from breccia pipe deposits on the Colorado Plateau over the last 50 years. Id. at 10491.
- Drilling [at the Canyon Mine] over the years has confirmed the presence of a breccia pipe containing more than 84,000 tons of uranium ore grading at
0.97% “U3O8,” which equates to more than 1.6 million pounds of uranium. Id. at 10486.7 - Chemical examinations of core samples confirm the presence of uranium and certain other associated metals at the Canyon Mine. Energy Fuels’ exploration drilling blocked out three different ore bodies which confirmed that the Canyon Mine uranium deposit can be classified as a proven reserve. Id. at 10496-97 (citing Appendix E).
- The proposed mining method at that Canyon Mine is a combination of modified block-caving and shrink-stopping. The underground workings are to include the main shaft, an escape shaft and air-flow path, cross-cut levels, and a series of “corkscrew” workings to follow the ore. The underground workings would be very similar to those used at the Arizona One Mine. Id. at 10498.
- Energy Fuels’ White Mesa Mill is the sole conventional uranium mill operating in North America. Uranium ore extracted from the Canyon Mine is transported to the mill in trucks. Each truck contains about 25 tons of material. Haulage distance to the mill is about 330 miles, one-way. The mill uses conventional uranium processing methods (ore screening and grinding, leaching, solvent extraction, and drying). The resulting “yellowcake” is stored in 55-gallon drums as a final product for sale that ultimately will be used as fuel for nuclear power plants. The milling process recovers 95% of available uranium. Id. at 10498-99, 10501.
- Energy Fuels developed ore tonnage and grade estimates from the results of 45 surface holes totaling 61,400 feet with an average depth of about 1,364 feet. Two different resource calculations were made for the Canyon Mine deposit. Energy Fuels’ numbers were reasonable and acceptable for the examiners to evaluate the Canyon Mine claims. Based on experience gained from mining older breccia pipe deposits, the ore tonnage estimates likely will be much higher once untested portions of the Canyon Pipe are drilled. Id. at 10498-99.
- Capital and operating cost estimates for the Canyon Mine are expected to be similar to the costs for the Arizona One Mine. A review of Energy Fuels’ cost estimates found them to be reasonable and at an adequate level to spot
check specific operating costs. Labor and transportation costs were spot checked and independently verified. Id. at 10500. - The Plan approved in 1986 included the sinking of a 1,500-foot vertical shaft with development levels between 900 and 1,500 feet. Mine production would be approximately 200 tons per day. The estimated annual production is 35,287 tons of ore and 623,940 pounds of U3O8. The development program is expected to last three years to completion, and the minimal mine life is five years. Id. at 10500-01.
- Energy Fuels planned to move its surface infrastructure and workforce from the Arizona One Mine to the Canyon Mine. Much of the surface development at the Canyon Mine is complete, and includes the main headframe, hoist house, warehouse and shop, sediment ponds, and power lines. These costs are considered “sunk” costs because they were previously completed for mine development and are fixed assets on the claims. Most of the capital expenses are future underground development costs. Id. at 10497, 10500-01 (citing Appendices B and D).
- The total capital cost is $19,109,161. This amount includes a nearly $1.7 million contingency fund and $450,000 in reclamation costs. Id. at 10500-01.8
- Estimated operating costs for each ton of ore at the Canyon Mine are $110.42 for mining, $66.00 for haulage, $141.04 for milling, and $36.56 in indirect costs. The total operating cost is $354.02 per ton of ore, and the per-pound cost of U3O8 is $17.36. Id. at 10501-02 (see Tables 4 & 5).
- Based on the feasibility analysis performed using the APEX program, Energy Fuels would earn a profit of $29,350,736 based on a uranium (U3O8) price of $56.00 per pound (net present values were $22,250,758 at a 10% discount rate, $19,336,119 at a 15% discount rate, and $16,755,429 at a 20% discount rate). Id. at 10504-05 (see Table 6).
- At a uranium price of $56.00 per pound, the Canyon Mine would have a 78% rate of return and a one-year payback period. Using a more conservative uranium price of $42.00 per pound, the mine would still be
profitable with a 36% rate of return. The minimum rate of return for the mining industry is about 12%. Id. at 10505.9 - We conclude that a discovery of a valuable mineral deposit existed at the time of the segregated withdrawal on July 21, 2009 . . . as required under the 1872 Mining law (30 USC 21-54). Furthermore, the company has shown that on July 21, 2009 and under present economic conditions, the uranium deposit on the claims could be mined, removed, transported, milled and marketed at a profit. We conclude that the test for discovery of a valuable mineral . . . has been met . . . . The [Canyon Mine has] valid existing rights that were established prior to the mineral withdrawal.
Id. at 10506.
VI. Plaintiffs’ APA Challenge to the VER Determination.
Plaintiffs contend that the VER Determination is invalid under the APA because: (1) Energy Fuels did not estimate, and the Forest Service did not consider, environmental costs for monitoring radiation, surface water, and groundwater, costs for wildlife conservation, and costs of future environmental mitigation measures; and (2) the Forest Service did not include “sunk costs” in its estimate of the mine‘s value. Doc. 228 at 13-22. Before addressing these arguments, a few broader points deserve mention.
The examiners “performed several independent discounted cash flow analyses” using APEX software, which is “well-accepted as a reliable evaluation tool by the mining industry for a variety of commodities and mine designs.” AR Doc. 525 at 10504. Data needed to run the cash flow analyses included the mine‘s capital and operating costs,
The ultimate objective of the Forest Service‘s evaluation was to determine whether the Canyon Mine would be profitable. In addressing this question, the mineral examiners took a conservative approach - they erred on the side of understating the mine‘s potential profitability.
For example, a key component was the price Energy Fuels could receive for uranium. In estimating this price, the examiners used the BLM Handbook method, which looked at spot prices for uranium during the month of the valuation date and the preceding 36 months. Id. at 10502. When applied to the June 2009 valuation date, this method produced an average uranium price of $70.79 per pound. Id. When applied to January 2012 (while the VER Determination was underway), it produced an average price of $49.69 per pound. Id. After identifying these average spot prices, the examiners noted that uranium producers typically have long-term contracts for uranium delivery with prices “higher than the spot price” and that “include provisions for cost inflation, fuel surcharges and other factors.” Id. Energy Fuels’ long-term contracts between January 2009 and January 2012, which accounted for about half of its sales from the Arizona One Mine, varied between $61 and $57 per pound. Its short-term prices were $52 per pound. Id. at 10502-03. The examiners took an average of this range - $56 per pound - and used it for their estimated price in the analysis.10 Thus, the examiners intentionally selected a lower price estimate than the $70.79 per pound that was available under BLM guidance for the 2009 marketability date, noting that “[i]t should be remembered that this is the lower price of the two time periods to consider, since the earlier time frame of July 21, 2009 and 36 months prior to that, would yield significantly higher prices using the BLM guidance policy.” Id. at 10503.
Using conservative estimates of the mine‘s ore production capacity and uranium prices, and adding in a contingency of $1,700,000 for unexpected costs, the APEX program estimated that the Canyon Mine would earn a profit of $29,350,736. Id. at 10504-05. This would be a 78% rate of return - six times the industry minimum. Id. The examiners then performed a “sensitivity analysis” by lowering the assumed uranium price by 25% below the lowest estimate produced by the BLM method (to $42 per pound), and found the mine still would be profitable and earn returns three times more than the industry minimum rate. Id. at 10505. Given this analysis, the mine was “of such a character that ‘a person of ordinary prudence would be justified in the further expenditure of his labor and means, with a reasonable prospect of success, in developing a valuable mine.‘” Coleman, 390 U.S. at 602 (citation omitted).
One additional point should be noted. The law “does not require a guaranteed profit to constitute a discovery” under the Mining Law. United States v. Mannix, 50 IBLA 110, 117-18 (1980). It requires only “a reasonable prospect of success in developing a valuable mine.” Id. at 112; see also Coleman, 390 U.S. at 602 (requiring only a “reasonable prospect of success“); Ideal Basic Indus., Inc. v. Morton, 542 F.2d 1364, 1369 (9th Cir. 1976) (requiring “reasonable prospect of success“). The conservative approach taken by the mineral examiners confirms that the Canyon Mine has a reasonable prospect of success.
Against this backdrop, the Court will address the deficiencies alleged by Plaintiffs.
A. Environmental Costs.
1. Environmental Monitoring.
Plaintiffs note that the 1986 Plan requires Energy Fuels to monitor radiation around the mine, surface water in nearby streams, and groundwater beneath the mine, including a year‘s worth of pre-operation samples to establish baseline radioactivity and radon values. Doc. 228 at 14-15. According to the FEIS, the monitoring includes radiation measurements at 12 locations, radon measurements at the mine site and the nearby town of Tusayan, surface water samples at five locations, and soil samples at six locations. AR Doc. 3 at 527-28. Groundwater will be sampled quarterly. Id. at 530. The FEIS estimated the total cost of these monitoring efforts at $112,000. Id. at 538 ($70,000 for radiation monitoring of air, soil, and water, and $42,000 for groundwater sampling).
Plaintiffs claim that these monitoring costs were not considered by the Forest Service in the VER Determination. Id. Energy Fuels contends that the costs were included. As support, Energy Fuels cites the declaration of Harold R. Roberts, asserting that environmental monitoring costs were included in the “Mining & Site G&A” category included in Energy Fuels’ cost spreadsheet. Doc 233-2, ¶ 8. But the Roberts declaration is not in the administrative record and will not be considered by the Court. See Camp v. Pitts, 411 U.S. 138, 142 (1973) (“the focal point for judicial review should be the administrative record already in existence, not some new record made initially in the reviewing court“); San Luis & Delta-Mendota Water Auth. v. Locke, 776 F.3d 971, 992 (9th Cir. 2014).
Plaintiffs also cite evidence outside the record, but assert that Exhibits 2-5 to their motion for summary judgment are provided only to support their standing argument. Doc. 238 at 12. The Court will not consider those exhibits on the merits. Plaintiffs’ Exhibit 1 purports to be a re-creation of Excel spreadsheets that the Forest Service used during the VER Determination, but the Court cannot conclude that the spreadsheets are
Looking only to the record evidence, the Court cannot resolve the dispute between the parties on whether the environmental monitoring costs were included in the VER Determination. Energy Fuels asserts that they are included in the “Mining & Site G&A” entry in the spreadsheets, but Plaintiffs note that this entry appears to include only “Sublevel development,” “Utilities,” and “Production.” Doc. 228 at 15-16. The Court cannot determine what is included in “Production.” Plaintiffs note that the production number is based on a per-ton estimate developed from Energy Fuels’ Arizona One Mine, and assert that the environmental monitoring costs could not possibly be the same at the mine. Id. at 17. But as already noted, the Arizona One Mine is a breccia pipe uranium mine located 6.5 miles from the north rim of the Grand Canyon. See Doc. 228-1 at 34. It presumably raises environmental issues very similar to those arising at the Canyon Mine, 6 miles from the other side of the Grand Canyon.
The spreadsheets in the record also include entries for “Permitting & Engineering” and “Reclamation,” as well as labor costs for “Radon Security” and “Engineer/ Environmental” (AR Docs. 673, 680), but these categories are not described in any detail. Thus, although it is possible that at least some environmental monitoring costs were included in the financial numbers used by the Forest Service, the Court cannot make that determination from the administrative record as a matter of undisputed fact. For purposes of the APA analysis below, the Court therefore will assume these costs were not included.
Energy Fuels further argues that the baseline environmental monitoring work identified by Plaintiffs was completed before the VER Determination in April 2012. Doc. 233-1 at 15. The ROD also asserts that it was completed. AR Doc. 6 at 928 (“Baseline measurements of radiation values in soil, air and water have been taken.“). If
Plaintiffs acknowledge that the groundwater monitoring well (which is included in their discussion of environmental monitoring costs) was installed before the VER Determination. Docs. 228 at 9, 15; 238 at 15. This cost, therefore, is a sunk cost. Whether sunk costs should have been included in the VER Determination is addressed below.
2. Wildlife Conservation Measures.
The ROD requires Energy Fuels to replace 32 acres of elk foraging habitat and a watering source that would be displaced by the mine. AR Doc. 6 at 925. The elk habitat would be replaced by mechanically thinning trees and brush in a 32-acre area comparable to the mine site. AR Doc. 3 at 532; see also AR Doc. 628 at 11874 (specifying “mechanical thinning of conifers” as the means of restoration). The watering source would be replaced by constructing one earthen tank in a suitable location. Id. The FEIS estimated the cost of these measures at $14,420. AR Doc. 3 at 538 ($8,250 for the construction of the new water tank and $6,170 for creation of the new 32-acre foraging area).12
The Forest Service also received a recommendation from the U.S. Fish and Wildlife Service (“FWS“) regarding measures for protecting California condors. AR Doc. 507. The recommended measures mostly were informational, such as advising mine employees to avoid interactions with condors and to report condor sightings to the FWS, and ensuring that the site remains clean so as not to attract the birds. Id. at 10433-34. The FWS also recommended that evaporation ponds at the site be made inaccessible to condors. Id.
Defendants contend that the condor protection costs are included in the “Surface Facilities, rehab, impoundment, ore pad” category of costs in the VER Determination. AR Doc. 525 at 10500. Plaintiffs disagree, citing specific components of this category that do not appear to include condor protection. Doc. 228 at 17. The Court cannot conclude from the administrative record that these costs were included in the VER Determination.13
For purposes of the APA review, the Court will assume that the VER Determination did not include the elk habitat restoration or the condor net.
3. Future Mitigation Measures.
Plaintiffs assert that environmental monitoring may identify contamination at the mine that will require future environmental mitigation measures. Doc. 228 at 15. They argue that the Forest Service should have estimated these potential future mitigation costs, such as possible pumping and treatment of groundwater if it is contaminated by the mine, and included them in the VER Determination. Id. Energy Fuels counters that the Forest Service is not required to speculate about unknown future costs when evaluating a mine’s profitability. Doc. 233-1 at 18 (citing United States v. Dwyer, 175 IBLA 100, 118 (2008) (affirming the ALJ’s finding that the “proposed measures for reducing costs and increasing profits amount to speculation“)). The Court agrees with Defendants.
Thus, whether groundwater will ever become contaminated from the mine, and whether Energy Fuels will ever incur costs for remediation of the groundwater, are simply unknown. Predicting the cost for such a future possibility would require much speculation. The profitability of the mine should be based on “present economic conditions” – what is known today – rather than speculation. See United States v. Garcia, 161 IBLA 235, 257 (2004) (“As the Board has stated many times, ‘the prudent man test is objective, and subjective considerations have no place in the calculus of prudence.“); United States v. Clouser, 144 IBLA 110, 130 (1998) (“[W]e agree with [the ALJ] that . . . speculative cost reductions do not alter the Government’s profitability determination“); In re Pac. Coast Molybdenum Co., 75 IBLA 16, 29 1983) (“a mining claimant must show that, as a present fact, considering historic price and cost factors and assuming that they will continue, there is a reasonable likelihood of success that a paying mine can be developed.“) (emphasis added); United States v. Highsmith, 137 IBLA 262, 278 (1977) (“No evidence has been offered by contestees as to the impact of [the] dump on marketability of the resources on the claims, . . . and we decline to speculate on this matter[.]“)); see also Doc. 228 at 13 (Plaintiffs’ acknowledgement that “[t]he rule is one of ‘present marketability,’ a limitation
4. Harmless Error.
Even if the Court assumes that the VER Determination omitted environmental monitoring, elk habitat restoration, and a net to protect condors, it cannot conclude that these relatively modest expenses would make the Canyon Mine unprofitable. Plaintiffs themselves do not assert that the mine would be unprofitable if these costs were considered. They claim only that “[t]he profitability forecast would have dropped substantially[.]” Doc. 228 at 10. But a drop in profits is not enough to defeat valid existing rights if the mine remains profitable.
In light of the relatively minor costs asserted by Plaintiffs, the Court directed the parties to address the harmless error rule during oral argument. Doc. 244. That subject consumed a majority of the hearing. After considering the parties’ arguments and the cases cited during the hearing, the Court concludes that any error in omitting these environmental costs was harmless in the overall profitability analysis.
Section 706 of the APA instructs that “the court shall review the whole record or those parts of it cited by a party, and due account shall be taken of the rule of prejudicial error.”
Plaintiffs bear the burden of showing that their alleged errors were harmful. Shinseki, 556 U.S. at 409 (“the burden of showing that an error is harmful normally falls upon the party attacking the agency’s determination“) (quotation marks and citation omitted); Organized Vill. of Kake v. U.S. Dep‘t of Agric., 795 F.3d 956, 969 (9th Cir. 2015)
a. Procedural Error.
In attempting to avoid the effect of the harmless error rule, Plaintiffs emphasize Ninth Circuit cases which state that an agency error is harmless where it “clearly had no bearing on the procedure used or the substance of [the] decision reached.” Cal. Wilderness Coal., 631 F.3d at 1091-92 (emphasis added); see Nw. Res. Info. Ctr., Inc. v. Nw. Power & Conservation Council, 730 F.3d 1008, 1020 (9th Cir. 2013) (same). Plaintiffs argue that the failure to address the environmental costs they have identified is a procedural error sufficient to overcome the harmless error rule, regardless of the amount of costs omitted or their effect on the mine’s profitability. The Court is not convinced.
Plaintiffs’ Ninth Circuit cases focus on procedural errors in administrative rulemaking, an area of law where procedure matters greatly. The Ninth Circuit has instructed that the harmless error rule should be applied to congressionally-mandated rulemaking procedures only rarely. See Cal. Wilderness Coal., 631 F.3d at 1020-21 (courts “must exercise great caution in applying the harmless error rule in the administrative rulemaking context” because “[h]armless error is more readily abused there than in the civil or criminal context“); see also Nw. Res. Info. Ctr., 730 F.3d at 1020 (“As noted above, this court has defined ‘harmless error’ in the administrative-rulemaking context as an error that ‘clearly had no bearing on the procedure used or the substance of [the] decision reached.’“) (emphasis added).
This case does not involve administrative rulemaking. Plaintiffs challenge the Forest Service’s evaluation of a factual issue – whether the Canyon Mine is likely sufficiently profitable to constitute a “valuable” mineral discovery under the Mining Law. No specific procedures are prescribed for such a determination. See 65 Fed. Reg. 41,724
Plaintiffs cite Independence Mining Co. v. Babbitt, 105 F.3d 502, 506-07 (9th Cir. 1997), but that case does not impose specific procedures on validity determinations. It states only that “a mineral examiner must . . . estimate the . . . cost of extracting, processing and marketing the minerals, including the costs of complying with any environmental and reclamation laws.” Plaintiffs’ other cases make similarly general statements. See Clouser v. Espy, 42 F.3d 1522, 1530 (9th Cir. 1994) (observing that measures to “reduce incidental environmental damage” will increase operating costs and thereby affect claim validity); United States v. E. K. Lehmann & Assoc., 161 IBLA 40, 104 n.25 (Mar. 16, 2004) (“It is well-established that the costs of compliance with . . . environmental laws . . . are properly considered in determining whether . . . the mineral deposit is presently marketable at a profit.“). These cases reinforce the requirement that an agency must estimate all costs of operation when determining whether a mine will be profitable, but they do not establish the kind of procedure at issue in the agency rulemaking cases.
b. Substantive Error.
The second prong of the Ninth Circuit’s harmless error doctrine in APA cases asks whether the error affected “the substance of [the] decision reached.” Cal. Wilderness Coal., 631 F.3d at 1091-92. As the Supreme Court has explained:
Often the circumstances of the case will make clear to the appellate judge that the ruling, if erroneous, was harmful and nothing further need be said. But, if not, then the party seeking reversal normally must explain why the erroneous ruling caused harm. If, for example, the party seeking an affirmance makes a strong argument that the evidence on the point was overwhelming regardless, it normally makes sense to ask the party seeking reversal to provide an explanation, say, by marshaling the facts and evidence showing the contrary.
In this case, the Forest Service found that the Canyon Mine would be very profitable, making more than $29 million in profits, a rate of return more than six times the industry minimum. These substantial profits were predicted using conservative estimates of the amount of ore that would be mined and the prices at which it would be sold. And they included a $1.7 million contingency for unknown expenses and $450,000 for reclamation of the mine site after mining is finished.15 Given this factual context, it “makes sense to ask the party seeking reversal to provide an explanation [of why the errors were harmful], say, by marshaling the facts and evidence showing the contrary.” Id.
As noted above, the FEIS estimates the costs of environmental monitoring at $112,000 and of wildlife habitat restoration at $14,420, for a total of $126,420. If the Court takes judicial notice of the inflation rate between 1986 (the year of the FEIS) and 2012 (the year of the VER Determination), the approximate cost of these measures in 2012 would be $261,000. See U.S. Dep’t of Labor, Inflation and Consumer Spending, Inflation Calculator, https://data.bls.gov/cgi-bin/cpicalc.pl?cost1=126420&year1=198601&year2=201201 (last visited May 21, 2020). The FEIS cautions that these cost estimates are based on data from contractors, trade journals, and similar sources, are used for comparison of the various alternatives evaluated in the FEIS, and that “actual costs could vary significantly from these estimates.” AR Doc. 3 at 538 n.1. But even if the costs were to increase four-fold, to approximately $1 million, they would not come close to making the Canyon Mine unprofitable.
The Court can find no administrative record estimate of the cost for a net to cover the evaporation ponds to protect condors. But Plaintiffs have provided no basis for suspecting that a net would cost anywhere near enough to eliminate $29 million in profits, even when the other environmental costs are considered.
In short, Plaintiffs have not carried their burden of showing that their alleged errors were harmful. See Tongass Conservation Soc‘y v. U.S. Forest Serv., 455 F. App‘x 774, 777 (9th Cir. 2011) (“[E]ven if we were to find some merit to some aspect of TCS’s arguments concerning the cumulative impact of future projects, we would still deny TCS relief on the ground that the error was harmless.“); Ludwig, 681 F.3d at 1054 (determining
B. Sunk Costs.
The Forest Service did not include certain past costs in its evaluation of the Canyon Mine’s profitability. These were costs for work done or facilities installed at the mine before the VER Determination, including construction of the mine’s head frame, hoist house, warehouse, shop, sediment ponds, and power lines. AR Doc. 525 at 10497, 10500 (see Appendices B and D). The Forest Service excluded these costs and the cost of the groundwater monitoring well because they “are considered ‘sunk’ costs.” Id. at 10500. This decision was consistent with guidance from the BLM Handbook:
Sunk costs are the unrecoverable past capital costs of certain types of equipment that the claimant already owned or the costs of improvements already made before the marketability date. Do not include as expenses in the operation’s cash flow those capital costs that were sunk before the date of marketability.
AR Doc. 374 at 7438 (footnotes omitted).
Exclusion of sunk costs complied with decisions from the Interior Board of Land Appeals (“Board“), an entity within the DOI charged with reviewing mine valuation determinations. In Mannix, the Board held that sunk costs should not be included in the calculation of mining profits:
The Government argues that all earlier expenses in development of the property must be considered, e.g., the cost of constructing cabins, sheds, and an access road and the purchase of rail and ore cars, and that such expenses must be recouped before it can be said that the mine is a profitable venture. We think the Government errs in its argument and analysis. . . . [I]f the mineral material may be now mined, removed, and marketed at a present profit over and above the costs of such operations, we would hold that the requirements of discovery have been met.
Other Board decisions follow Mannix. See United States v. Coppel, 81 IBLA 109, 129 (1984) (“As this Board has noted, while consideration of the likelihood of recovery of capitalization costs yet to be expended is a necessary element of determining the existence of present discovery, where the expenditures have already been made prior to either the contest or a withdrawal of the land, such factors are not properly considered in determining present marketability.“) (citing Mannix, 50 IBLA at 119); United States v. Collord, 128 IBLA 266, 288 n.24 (1994) (“Not included [in the prudent-man and marketability tests] are development and capital costs that have already been spent before the date on which a valuable mineral deposit must be shown to exist.“) (citing Mannix); Clouser, 144 IBLA at 131 (“To the extent that there are existing tracks and lighting, the costs attributable to them need not be considered.“) (citing Mannix).
Plaintiffs claim that the Forest Service erred when it applied this law. They argue that the Board’s law on sunk costs “is unsound and contrary to binding Supreme Court precedent.” Doc. 228 at 19. The Court disagrees for three reasons: Plaintiffs’ argument does not apply the correct standard of review; their position is not supported by Supreme Court or federal court cases; and, even if Plaintiffs are correct, they have not shown that the error is harmful.
1. Plaintiffs Do Not Apply the Correct Standard of Review.
The question posed by Plaintiffs’ claim is not whether the Board decisions and BLM Handbook are incorrect, as Plaintiffs suggest, but whether the Forest Service’s reliance on these DOI sources in the VER Determination was arbitrary and capricious. “[A]gencies are entitled to rely on the expertise of another agency without forgoing deferential review.” Bellion Spirits, LLC v. United States, 393 F. Supp. 3d 5, 13 (D.D.C. 2019) (citing City of Boston Delegation v. FERC, 897 F.3d 241, 255 (D.C. Cir. 2018) (“Agencies can be expected to ‘respect the views of such other agencies as to those problems’ for which those ‘other agencies are more directly responsible and more competent.’“)). Courts have described Plaintiffs’ burden under this deferential standard of review as “heavy.” See Defs. of Wildlife v. U.S. Dep‘t of Navy, 895 F. Supp. 2d 1285, 1318 (S.D. Ga. 2012) (“Plaintiffs, as the challenging party, ‘bear a heavy burden to prove that the agency was arbitrary and capricious in relying upon the [National Marine Fish Services] determination of a matter firmly within that agency’s area of expertise.’“) (quoting Sierra Club v. U.S. Army Corps of Eng‘rs, 295 F.3d 1209, 1222 (11th Cir. 2002) (internal brackets omitted)).
Thus, the Court must focus on the reasonableness of the Forest Service’s reliance on the Board cases and BLM Handbook, not on the validity of the cases themselves. See WildEarth Guardians v. U.S. Forest Serv., 828 F. Supp. 2d 1223, 1238 (D. Colo. 2011) (“[T]he Forest Service conducted its own analysis but relied on the expertise of the [DOI’s Mine Safety and Health Administration] regarding whether such a [flaring] system would be approved for use in the mine. Again, although WildEarth clearly disagrees with the MSHA’s assessment, it does not demonstrate that the Forest Service’s reliance on MSHA’s statements of its position as to whether such a system would be approved for use was arbitrary, capricious, or unsupported by the record.“); City of Tacoma, Wash. v. F.E.R.C., 460 F.3d 53, 75 (D.C. Cir. 2006) (“[W]hen we are reviewing the decision of an action agency to rely on a [biological opinion prepared by other agencies], the focus of our review is quite different than when we are reviewing a [biological opinion] directly. In the former case, the critical question is whether the action agency’s reliance was arbitrary and capricious, not whether the [biological opinion] itself is somehow flawed.“) (citing Aluminum Co. of Am. v. Adm‘r, Bonneville Power Admin., 175 F.3d 1156, 1160 (9th Cir. 1999); Pyramid Lake Paiute Tribe v. U.S. Dep‘t of Navy, 898 F.2d 1410, 1415 (9th Cir. 1990); Stop H-3 Ass‘n v. Dole, 740 F.2d 1442, 1460 (9th Cir. 1984)).
A Ninth Circuit case illustrates the proper method of review. In Pyramid Lake, an Indian tribe challenged a biological opinion adopted by the Department of the Navy but issued by the FWS, which was not a party to the action. The Ninth Circuit refused to consider whether the FWS had violated the Endangered Species Act, stating:
The Tribe argues at length that the FWS’s biological opinions which contain the “no jeopardy” findings are based on faulty analysis. . . . The Tribe’s argument misses the mark, however, because the FWS is not a party to this
action. The FWS’s actions, or lack thereof, in preparing its opinions are relevant on appeal only to the extent that they demonstrate whether the Navy’s reliance on the reports is “arbitrary and capricious.”
Id. at 1415; see Aluminum Co. of Am., 175 F.3d at 1160 (“The [plaintiffs] advance arguments targeted at both NMFS’s actions in preparing the 1995 BiOp and the BPA‘s decision to adopt NMFS‘s ‘jeopardy’ finding and RPA. The former claims, at least as they challenge the analysis of NMFS, which is not a party to this action, are beyond the scope of our review[.]“); see also Stop H-3 Ass‘n, 740 F.2d at 1460 (“Remand is not required . . . because we are able to determine from the record that as a matter of law FHWA’s decision to rely on FWS’s biological opinion was not ‘arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.’ . . . On its face, this does not seem to be a ‘clear error of judgment.’“) (internal citations omitted).
Plaintiffs provide no basis for concluding that the Forest Service acted arbitrarily or capriciously when it chose to follow existing Board cases and the BLM Handbook on the treatment of sunk costs. They do not contend that the Board cases or Handbook were misapplied, nor that any federal court has found them incorrect. The Forest Service is entitled to rely on the expertise of DOI in making the mine profitability determination, and the Court cannot conclude that it acted improperly when it followed DOI guidance on sunk costs. Plaintiffs have not carried their heavy burden on this issue.
2. Plaintiffs’ Position Is Not Supported by Federal Case Law.
Plaintiffs argue that the Board’s treatment of sunk costs is contrary to Supreme Court precedent. Plaintiffs first cite Cameron v. United States, which held that a valuable mineral discovery is one that “would justify a person of ordinary prudence in the further expenditure of his time and means in an effort to develop a paying mine.” 252 U.S. at 459. Plaintiffs also cite Coleman, which held that a mineral deposit is valuable if “‘a person of ordinary prudence would be justified in the further expenditure of his labor and means, with a reasonable prospect of success, in developing a valuable mine.’” 390 U.S. at 602 (citation omitted). Plaintiffs further cite the Ninth Circuit’s decision in Ideal Basic, which
None of these cases addresses the costs to be considered in the profitability calculation, and they certainly do not address the specific question presented here – whether past development costs must be included. Plaintiffs argue that these cases imply a requirement that all past costs be considered, but the cases do not say so, and the Court therefore cannot conclude that they clearly conflict with the Board’s decisions as Plaintiffs claim. As the Board noted in Mannix, “[t]here is no case law of which we have knowledge, nor has the government adduced any, that compels consideration of the above mentioned development costs in determining if an ongoing operation is presently profitable.” 50 IBLA at 119.
Plaintiffs suggest that the “valuable mineral deposit” requirement of the 1872 Mining Law necessarily focuses on the value of the minerals themselves, not on the profitability of the specific operation that will mine them. From this premise, Plaintiffs assert that all costs related to the ore extraction, future and past, must be considered in deciding whether the claim has value. Although there is some logic to this argument, the language from the cases seems to focus on the claim’s value as of the date of valuation.
As noted above, the valuation of a mine is made on a “marketability” date. See Coleman, 390 U.S. at 602; 65 Fed. Reg. 41,724, 2000 WL 87795741 (July 6, 2000). For mining claims on withdrawn lands, marketability is addressed “both as of the date of the withdrawal and the date of the mineral examination.” 65 Fed. Reg. at 41,725. Language from the Supreme Court suggests that the comparison of costs and revenue to determine profitability looks forward from the marketability date: a mineral deposit is “valuable” if
Plaintiffs suggest that United States v. Armstrong, 184 IBLA 180 (2013), is inconsistent with the Board’s holding in Mannix. Doc. 228 at 21. But Armstrong makes no mention of Mannix and does not hold that sunk costs should be considered in evaluating profitability. The claimant in Armstrong argued that certain portable equipment he owned was a sunk cost that should be excluded from the profitability analysis. 184 IBLA at 219. The government’s expert testified that “anything that has been used and done on the property and cannot be transferred, is a sunk cost, while things that have value and can be applied to a different property or sold are an investment of the operator.” Id. The Board agreed that “this is the standard approach to economic valuations in [mine] operations” and that “the portable equipment owned by [the claimant] is not a sunk cost.” Id.18
The BLM Handbook likewise distinguishes between portable equipment and the type of unrecoverable surface development at the Canyon Mine. AR 7438 (“Purchase of new equipment or planned replacement of equipment or facilities after the date of marketability, consumable stores, repairs, and daily operating expenses are not sunk costs.“). The rationale for including the opportunity cost of useable assets such as portable equipment does not apply to fixed assets such as a groundwater well, which cannot be sold or used at another location. See Doc. 228 at 22. Armstrong did not reject the principle that properly recognized sunk costs should be excluded from a future profitability determination. 184 IBLA at 219.19
3. Any “Sunk Costs” Error Was Harmless.
In any event, Plaintiffs do not show that the value of the sunk costs at the Canyon Mine would, if considered, render the mine unprofitable. They do not suggest that such costs are close to the more than $29 million in profits predicted by the VER Determination. Thus, even if the Court somehow could conclude that the Forest Service’s treatment of sunk costs was error, Plaintiffs have not met their burden of showing that it was harmful error.20
C. Merits Conclusion.
As explained above, the Court cannot find that the VER Determination included all environmental monitoring and wildlife conservation costs. But even if those costs were not considered, Plaintiffs have not met their burden of showing that the omission was harmful given the Canyon Mine’s more than $29 million in conservatively estimated
As already noted, the Court must treat an agency’s decision “with deference, particularly ‘when the agency is making predictions, within its special expertise[.]” Ctr. for Biological Diversity v. U.S. Forest Serv., 409 F. Supp. 3d 742, 752 (D. Ariz. 2019) (quoting Forest Guardians v. U.S. Forest Serv., 329 F.3d 1089, 1099 (9th Cir. 2003)). The agency’s decision “need only be a reasonable, not the best or most reasonable, decision.” River Runners for Wilderness v. Martin, 593 F.3d at 1067 (citation omitted); see Forest Guardians, 329 F.3d at 1099 (“An agency’s actions need not be perfect; we may only set aside decisions that have no basis in fact[.]“). In this case, “[t]he [Forest] Service ‘articulated a rational connection between the facts found and the choice made.” Forest Guardians, 329 F.3d at 1099 (quoting Pyramid Lake, 898 F.2d at 1414); see Motor Vehicle Mfrs. Ass‘n, 463 U.S. at 43; Cal. Pac. Bank, 885 F.3d at 570; Indep. Acceptance Co., 204 F.3d at 1251. The Court will grant summary judgment to Defendants on claim four.
VII. Energy Fuels’ Motion to Seal.
Energy Fuels moves to seal Plaintiffs’ unredacted summary judgment motion and reply brief because they mention Energy Fuels’ confidential cost information that is exempt from public disclosure under the Freedom of Information Act and applicable Forest Service regulations and guidance for mineral examiners. Doc. 232; see Docs. 226, 238. Plaintiffs’ have lodged the proposed unredacted sealed versions of the documents with the Court and have filed redacted public versions on the docket. See Docs. 226, 228, 237, 238; LRCiv 5.6(b)-(c).
Sealing Plaintiffs’ motion and reply will have no effect on the public’s ability to understand the issues addressed in this order because lightly redacted copies have been filed in the public docket. The Court finds compelling reasons to seal and will grant Energy Fuels’ motion. See Kamakana v. City & Cty. of Honolulu, 447 F.3d 1172, 1179 (9th Cir. 2006).
- Plaintiffs’ motion for summary judgment on claim four (Doc. 226) is denied.
- Energy Fuels’ motion for summary judgment (Doc. 233) is granted with respect to Plaintiffs’ request to enjoin activities at the Canyon Mine and on the merits of claim four, and denied with respect to the argument that Plaintiffs are entitled to no relief because the VER Determination was not legally required. Energy Fuels’ motion to strike (Doc. 233-1 at 21) is denied as moot.
- The Forest Service’s motion for summary judgment (Doc. 234) is granted on the merits of claim four and denied on the issue of standing.
- Energy Fuels’ motion to seal (Doc. 232) is granted. The Clerk of Court shall accept for filing under seal the documents lodged on the Court’s docket as Docs. 228 and 238.
- The Clerk is directed enter judgment and terminate this action.
Dated this 22nd day of May, 2020.
David G. Campbell
Senior United States District Judge