(a) The division shall prepare an invitation for bids for prequalified design-builders, which must provide at a minimum:
- (1) The procedures to be followed for submitting bids and the procedures for making awards;
- (2) The proposed general terms and conditions for the design-build contract;
- (3) The description of the drawings, specifications or other information to be submitted with the bid, with guidance as to the form and level of completeness of the drawings, specifications or submittals that will be acceptable;
- (4) A proposed time schedule commencement and completion of the design-build contract;
- (5) Budget limits for the design-build contract, if any;
- (6) Requirements or restrictions for the subletting of specific portions of the design-build contract, if any; and
- (7) Requirements for performance bonds, payment bonds, insurance, professional liability insurance and workers' compensation coverage.