- (1) General. Tank systems that are abandoned with or without product shall be closed within 60 days of non-compliance with s. ATCP 93.545 or in-use tank system requirements.
(2) Exceptions. Abandoned tank systems that are less than 30 years old or of double-wall construction may be returned to service if they all of the following conditions:
- (a) Apply for permits to operate in accordance with s. ATCP 93.145.
(b)
- 1. The integrity of a fiberglass tank shall be assessed and certified by the manufacturer or a qualified professional engineer. The assessment shall include an internal inspection and certification that the tank is suitable for continued service.
2. The integrity assessment of a steel tank shall be performed in accordance with API 1631.
- a. Tanks that have an overall average tank metal thickness or an average tank thickness of a designated thin wall area of less than 75 percent or any through-wall perforations shall be immediately closed per s. ATCP 93.560.
- b. Tanks that have an overall average tank metal thickness or an average tank thickness of a designated thin wall area of 75 percent to 85 percent shall have an impressed current system installed per s. ATCP 93.520 or be immediately closed per s. ATCP 93.560.
- c. The certification and report of the assessment shall be submitted to the department for approval prior to adding product to the tank.
- 3. Cathodically protected tanks shall meet the requirements of s. ATCP 93.520.
- 4. Precision testing of the entire tank system without product shall be performed per s. ATCP 93.515 (4) by a certified tank system tightness tester.
- 5. A complete underground tank system functionality verification shall be conducted per s. ATCP 93.510 (2). Form TR-WM-139 documenting the verification shall be submitted to the department.
- 6. The tank system shall fully comply with this chapter before being placed back into service, except double-wall construction is not newly required for tank systems installed before February 1, 2009.
- 7. The tank system shall pass a department storage tank system inspection conducted in accordance with this chapter.
History
History: CR 17-092: cr. Register October 2019 No. 766, eff. 11-1-19; (1) (title) created under s. 13.92 (4) (b) 2., Stats., and correction in (2) (intro.), (b) 1., 7. made under s. 35.17, Stats., Register October 2019 No. 766.