- (1) Where there is an associated seismic or ADA requirement to the equipment or system being altered, the equipment shall also be brought into compliance with the applicable seismic and/or ADA requirements during the alteration.
- (2) Machine room, control room, machinery space, and control space illumination shall be required to meet the minimum illumination levels as required by the latest adopted code.
- (3) Where a new jack assembly or hydraulic pump unit is installed, a seismic (overspeed) valve shall be installed according to ASME A17.1/CSA B44, Section 8.4.11.
- (4) When new elevator equipment is installed in a machine or control room, receptacles shall comply with current adopted edition of NFPA 70 (see Art. 620.23).
- (5) When new equipment is installed in the elevator pit, illumination levels shall be required to meet the minimum illumination levels required by the current adopted edition of ASME A17.1/CSA B44. Receptacles in the pit area shall be of the GFCI type (see NFPA 70, Art. 620.24).
- (6) Where the main line disconnect is being replaced or relocated, and the machine room or hoistway is sprinklered, or in the process of being sprinklered, a shunt-trip device shall be installed.
[Statutory Authority: Chapter 70.87 RCW. WSR 21-18-096, § 296-96-02410, filed 8/31/21, effective 10/1/21; WSR 18-18-070, § 296-96-02410, filed 8/31/18, effective 10/1/18; WSR 13-24-066, § 296-96-02410, filed 11/27/13, effective 1/1/14; WSR 07-24-041, § 296-96-02410, filed 11/30/07, effective 1/1/08.]