Wash. Admin. Code § 296-860-20020
Important:
You have two years from October 01, 2002, (the effective date of this rule), to comply with the construction requirements of this section, unless the department determines during an inspection that your walkways create a serious safety hazard. If you are not sure a serious safety hazard exists in your workplace, you can request a free consultation from the department by calling your local L&I office.
Construction of walkways
(2) You must construct rail yard walkways that can be maintained in a safe condition:
(3) You must use any of the following materials when constructing your walkway:
(a) Crushed material that does not exceed 1 1/2 inches in size. For this rule, "1 1/2 inches in size" means one of the following (percentages refer to weight measurement and sieve size standard in the industry):
| Percentage of materialpassing througha sieve opening | Sieve opening size | ||||
| 100 | 1 1/2 inch square | ||||
| 90 | - | 100 | 1 inch square | ||
| 40 | - | 80 | 3/4 inch square | ||
| 15 | - | 60 | 1/2 inch square | ||
| 0 | - | 30 | 3/8 inch square | ||
| 0 | - | 10 | #4 | ||
| 0 | - | 5 | #8 | ||
| 0 | - | 0.5 | #200 |
(5) You must construct walkways with a grade or slope in any direction with not more than one inch of elevation for each eight inches of horizontal length, unless it is geographically impractical.
Maintenance of walkways
(10) You must obtain a department variance before permanently removing any bridge or trestle walkway from use after October 1, 2002 (the effective date of this rule).
| Note: | The requirements for filing a variance are located in the safety and health core rules and chapter 296-900 WAC, Administrative rules. |
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, 49.17.060. WSR 15-24-102, § 296-860-20020, filed 12/1/15, effective 1/5/16; WSR 07-03-163, § 296-860-20020, filed 1/24/07, effective 4/1/07. Statutory Authority: RCW 49.17.010, [49.17].040, and [49.17].050. WSR 02-17-106, § 296-860-20020, filed 8/21/02, effective 10/1/02.]