Wash. Admin. Code § 296-818-30010
(1) You must install adequate ventilation systems in blast cleaning enclosures that are able to do all of the following:
(f) Discharge exhaust so contaminated air does not do either of the following:
(3) You must make sure make-up air systems do not interfere with the effectiveness of the exhaust system, and are designed to do both of the following:
(4) You must do both of the following before opening the blast cleaning enclosure:
(5) You must follow the requirements in Table-2, Blast Cleaning Enclosures.
Table-2: Blast Cleaning Enclosures
| If you have | Then make sure |
| Air inlets and access openings | They are either baffled or arranged so the combination of inward airflow and baffles minimizes both of the following: |
| - The escape of abrasive or dust particles into adjacent work areas. | |
| - Visible spurts of dust | |
| Small access openings where dust might escape | Slit resistant baffles are installed in multiple sets at all small access openings, and do both of the following: |
| - Regularly inspect them | |
| - Replace them when needed | |
| An observation window in enclosures where hard, deep cutting abrasives are used | The window is made of safety glass protected by screening |
| Notes: | |
| • Hard, deep cutting abrasives may shatter normal glass. | |
| • If the safety glass shatters, the protective screening will help contain the glass and protect employees from cuts and lacerations. | |
| Small operator access doors | They are flanged and tight when closed, and open from both inside and outside the enclosure. |
| Note: | |
| If you have a small operator access door and a large work access door, the large work access door may open or close from the outside only. |
| References: | For more information on: |
| 1. Air velocities, refer to the following: | |
| a. The latest edition of Recommended Industrial Ventilation Guidelines (ACGIH); | |
| b. NIOSH 1976 Industrial Ventilation; | |
| 2. Exit routes, go to the Safety and health core rules, WAC 296-800-310. |
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, and 49.17.060. WSR 17-18-075, § 296-818-30010, filed 9/5/17, effective 10/6/17; WSR 06-12-074, § 296-818-30010, filed 6/6/06, effective 9/1/06.]