Wash. Admin. Code § 296-56-99002
appendix a
standard signals for longshore crane signals
| [if IE 9]><video style="display: none;"><![endif][if IE 9]></video><![endif] | |
| hoist the load | lower the load |
| [if IE 9]><video style="display: none;"><![endif][if IE 9]></video><![endif] | |
| hoist the load slowly | lower the load slowly |
| [if IE 9]><video style="display: none;"><![endif][if IE 9]></video><![endif] | |
| use main hook | use whip hook |
| [if IE 9]><video style="display: none;"><![endif][if IE 9]></video><![endif] | |
| raise the boom | lower the boom |
[Statutory Authority: RCW 49.17.040 and 49.17.050. WSR 86-03-064 (Order 86-02), § 296-56-99002, filed 1/17/86; Order 74-14, Appendix C (codified as WAC 296-56-99002), filed 4/22/74; Rules (part), filed 9/24/65; Rules (part), filed 3/23/60.]