The manufacturer applicant must provide the following information to the department:
- (1) The reason the applicant wants to manufacture explosives.
- (2) The manufacturing or processing location.
- (3) The kind of explosives manufactured, processed, or used.
- (4) The distance that the explosives manufacturing building is located, or intended to be located, from other buildings, magazines, inhabited buildings, railroads, highways, and public utility transmission systems.
(5) A site plan. The site plan must:
(a) Include the distance each manufacturing building is located from:
- (i) Other buildings on the premises where people are employed;
- (ii) Other occupied buildings on adjoining property;
- (iii) Buildings where customers are served;
- (iv) Public highways;
- (v) Utility transmission systems.
(b) Demonstrate compliance with:
- (i) Applicable requirements of the Washington State Explosives Act;
- (ii) The separation distance requirements of this chapter.
- (c) Identify and describe all natural or artificial barricades used to influence minimum required separation distances;
- (d) Identify the nature and kind of work being performed in each building;
- (e) Specify the maximum amount and kind of explosives or blasting agents to be permitted in each building or magazine at any one time.
- (6) Information required by WAC 296-52-61010, License applicants must provide this information.
- (7) Other pertinent information required by the department.
[Statutory Authority: RCW 49.17.010, 49.17.040, 49.17.050, and 49.17.060. WSR 17-16-132, § 296-52-65010, filed 8/1/17, effective 9/1/17; WSR 05-08-110, § 296-52-65010, filed 4/5/05, effective 6/1/05. Statutory Authority: RCW 49.17.010, [49.17].040, and [49.17].050. WSR 02-03-125, § 296-52-65010, filed 1/23/02, effective 3/1/02.]