Design plans for conversion vendor units and medical units are required for units that are sold, leased, or used in Washington state and must be approved when:
(1) Conversion vendor units that contain one or more of the following components:
- (a) Concentrated loads exceeding five hundred pounds (see WAC 296-150V-0930);
- (b) Fuel gas piping systems and equipment;
- (c) Solid fuel burning equipment;
- (d) Fire suppression systems;
- (e) Commercial hoods;
- (f) Electrical systems and equipment in excess of 30 amps/120 volts;
- (g) Electrical systems with more than five circuits;
- (h) Electrical systems incorporating photovoltaic energy, fuel cell energy, or other alternative energy systems;
- (i) Plumbing drainage systems conveying solid or bodily waste.
- (2) Medical units.
- (3) Modification of an approved design plan through addendums;
- (4) Addition of options to an approved design plan through addendums.
[Statutory Authority: Chapter 43.22 RCW. WSR 16-13-119, § 296-150V-0300, filed 6/21/16, effective 6/21/16; WSR 99-18-069, § 296-150V-0300, filed 8/31/99, effective 10/1/99.]