- (1) Tests to a design for a factory-built temporary worker housing structure must be witnessed by a professional engineer or architect licensed in Washington state.
(2) Test reports must contain the following items:
- (a) A description of the methods or standards that applied to the test;
- (b) Drawings and a description of the item tested;
- (c) A description of the test set-up;
- (d) The procedure used to verify the correct load;
- (e) The procedure used to measure each condition;
- (f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested; and
- (g) Analysis, comments, and conclusion.
- (3) The written test procedures, results and conclusions must reference the applicable design plan.
[Statutory Authority: RCW 43.22.480. WSR 99-12-079, § 296-150T-0350, filed 5/28/99, effective 6/28/99.]