Wash. Admin. Code § 296-150F-0350

What must the test procedures and results for design plans include?

Effective Nov 25, 1996WSR 96-21-146RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480LABOR AND INDUSTRIES, DEPARTMENT OF
  1. (1) Tests to a design for a factory-built home or commercial structure must be witnessed by a professional engineer or architect licensed in Washington state.
  2. (2) Test reports must contain the following items:

    1. (a) A description of the methods or standards that applied to the test;
    2. (b) Drawings and a description of the item tested;
    3. (c) A description of the test setup;
    4. (d) The procedure used to verify the correct load;
    5. (e) The procedure used to measure each condition;
    6. (f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested; and
    7. (g) Analysis, comments, and conclusion.
  3. (3) The written test procedures, results and conclusions must reference the applicable design plan.

[Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. WSR 96-21-146, § 296-150F-0350, filed 10/23/96, effective 11/25/96.]

Log InSign Up