Wash. Admin. Code § 246-359-340
All nailing must be completed according to Table 340.
| Table 340Nailing Schedule | |
| connection | nailing1 |
| 1. Joist to sill or girder, toenail | 3-8d |
| 2. Bridging to joist, toenail each end | 2-8d |
| 3. 1" x 6" subfloor or less to each joist, face nail | 2-8d |
| 4. Wider than 1" x 6" subfloor to each joist, face nail | 3-8d |
| 5. 2" subfloor to joist or girder, blind and face nail | 2-16d |
| 6. Sole plate to joist or blocking, typical face nailSole plate to joist or blocking, at braced wall panels | 16d at 16" o.c.3-16d per 16" |
| 7. Top plate to stud, end nail | 2-16d |
| 8. Stud to sole plate | 4-8d, toenail or 2-16d, end nail |
| 9. Double studs, face nail | 16d at 24" o.c. |
| 10. Doubled top plates, typical face nailDoubled top plates, lap splice | 16d at 16" o.c.8-16d |
| 11. Blocking between joists or rafters to top plate, toenail | 3-8d |
| 12. Rim joist to top plate, toenail | 8d at 6" o.c. |
| 13. Top plates, laps, and intersections, face nail | 2-16d |
| 14. Continuous header, two pieces | 16d at 16" o.c. along each edge |
| 15. Ceiling joists to plate, toenail | 3-8d |
| 16. Continuous header to stud, toenail | 4-8d |
| 17. Ceiling joists, laps over partitions, face nail | 3-16d |
| 18. Ceiling joists to parallel rafters, face nail | 3-16d |
| 19. Rafter to plate, toenail | 3-8d |
| 20. 1" brace to each stud and plate, face nail | 2-8d |
| 21. 1" x 8" sheathing or less to each bearing, face nail | 2-8d |
| 22. Wider than 1" x 8" sheathing to each bearing, face nail | 3-8d |
| 23. Built-up corner studs | 16d at 24" o.c. |
| 24. Built-up girder and beams | 20d at 32" o.c. at top and bottom and staggered 2-20d at ends and at each splice |
| 25. 2" planks | 2-16d at each bearing |
1 Common or boxed nails must be used.
[Statutory Authority: RCW 70.114A.081. WSR 99-03-065, § 246-359-340, filed 1/18/99, effective 2/18/99.]