Post-construction documents must include the following:
(1) A LOSS construction completion report prepared by the design engineer that:
- (a) Is on a form provided by the department;
- (b) States the LOSS was constructed in substantial accordance with the approved plans and specifications; and
- (c) Notes changes from the approved plans and specifications, if any.
- (2) LOSS record drawings, in electronic format acceptable to the department, that are scaled to clearly show all necessary information.
- (3) The final management plan that meets the requirements of WAC 246-272B-04100.
- (4) A final O&M manual for the installed LOSS that meets the requirements of WAC 246-272B-04200.
[Statutory Authority: RCW 70.118B.020 and 70.118B.040. WSR 19-10-014, § 246-272B-05400, filed 4/22/19, effective 5/23/19. Statutory Authority: RCW 70.118B.020. WSR 11-12-035, § 246-272B-05400, filed 5/25/11, effective 7/1/11.]