(1) The licensee shall have and follow written operating procedures for:
- (a) Operation of the irradiator, including entering and leaving the radiation room;
- (b) Use of personnel dosimeters;
- (c) Surveying the shielding of panoramic or beam-type irradiators;
- (d) Monitoring pool water for contamination while the water is in the pool and before release of pool water to unrestricted areas;
- (e) Leak testing of sources;
- (f) Inspection and maintenance checks required under WAC 246-236-061;
- (g) Loading, unloading, and repositioning sources, if the operations will be performed by the licensee; and
- (h) Inspection of movable shielding required under WAC 246-236-023(8), if applicable.
(2) The licensee shall have and follow emergency or abnormal event procedures, appropriate for the irradiator type, for:
- (a) Sources stuck in the unshielded position;
- (b) Personnel overexposures;
- (c) A radiation alarm from the product exit portal monitor or pool monitor;
- (d) Detection of leaking sources, pool contamination, or alarm caused by contamination of pool water;
- (e) A low or high water level indicator, an abnormal water loss, or leakage from the source storage pool;
- (f) A prolonged loss of electrical power;
- (g) A fire alarm or explosion in the radiation room;
- (h) An alarm indicating unauthorized entry into the radiation room, area around pool, or another alarmed area;
- (i) Natural phenomena, including an earthquake, a tornado, flooding, or other phenomena as appropriate for the geographical location of the facility; and
- (j) The jamming of automatic conveyor systems.
(3) The licensee may revise operating and emergency procedures without approval of the department only if all of the following conditions are met:
- (a) The revisions do not reduce the safety of the facility;
- (b) The revisions are consistent with the outline or summary of procedures submitted with the license application;
- (c) The revisions have been reviewed and approved by the radiation safety officer; and
- (d) The users or operators are instructed and tested on the revised procedures before they are put into use.
[Statutory Authority: RCW 70.98.050, 70.98.110 and 58 F.R. 7728, 76 F.R. 56963, 77 F.R. 39906, 80 F.R. 54234. WSR 18-15-017, § 246-236-053, filed 7/9/18, effective 8/9/18.]