Wash. Admin. Code § 222-24-060
Not covered by the Surface Mine Reclamation Act of 1971 (chapter 78.44 RCW).
*(1) Location of pits. Except as approved by the department, rock quarries and gravel pits opened after January 1, 1975 shall be located above the 100-year flood level.
*(2) Location of spoil disposal areas. Except as approved by the department, spoil disposal areas shall be located:
(f) All spoils shall be located outside of Type A and Type B Wetlands and their wetland management zones. Spoils shall not be located within the boundaries of forested wetlands without written approval of the department and unless a less environmentally damaging location is unavailable. No spoil area greater than 0.5 acre in size shall be allowed within wetlands. (See WAC 222-24-015.)
*(3) Pit drainage. During construction and use of rock quarries, gravel pits, or borrow pits, runoff water shall be either diverted onto a stable portion of the forest floor or be passed through one or more settling basins as approved by the department.
*(4) Rehabilitation required. All rock quarries, gravel pits, spoil disposal areas and borrow pits used after January 1, 1975 shall be reclaimed within 2 years from the time the rock or gravel source is either exhausted or abandoned.
*(5) Rehabilitation standards. Where rehabilitation is required:
(d) Seed nonforested exposed erodible soils with grass, clover or other ground cover.
*(6) Major spoil disposal operations. Where a spoil disposal operation involves more than 1,000 cubic yards of spoils:
[Statutory Authority: Chapter 34.05 RCW, RCW 76.09.040, [76.09.]050, [76.09.]370, 76.13.120(9). WSR 01-12-042, § 222-24-060, filed 5/30/01, effective 7/1/01. Statutory Authority: RCW 76.09.040, 76.09.050 and chapter 34.05 RCW. WSR 92-15-011, § 222-24-060, filed 7/2/92, effective 8/2/92. Statutory Authority: RCW 76.09.040. WSR 87-23-036 (Order 535), § 222-24-060, filed 11/16/87, effective 1/1/88; Order 263, § 222-24-060, filed 6/16/76.]