- (1) An SEIS shall be prepared in the same way as a draft and final EIS (WAC 197-11-400 to 197-11-600), except that scoping is optional. The SEIS should not include analysis of actions, alternatives, or impacts that is in the previously prepared EIS.
- (2) The fact sheet and cover letter or memo for the SEIS shall indicate the EIS that is being supplemented.
- (3) Unless the SEPA lead agency wants to prepare the SEIS, an agency with jurisdiction which needs the SEIS for its action shall be responsible for SEIS preparation.
[Statutory Authority: RCW 43.21C.110. WSR 84-05-020 (Order DE 83-39), § 197-11-620, filed 2/10/84, effective 4/4/84.]