Wash. Admin. Code § 173-455-120
(1) General requirements.
(a) The fees in this section apply to:
(d) An applicant must submit initial fees with the associated permit application, notice, or request. An application, notice or request is incomplete until initial fees have been paid.
(j) Fees assessed under this section apply without regard to whether ecology approves or denies the underlying permit application, notice, or request.
Permit fees.
Minor new source review.
(2) Fees for review of a permit application for a new source or for the modification of an existing source with an emissions increase. (WAC 173-400-110(3).)
(a) Table 1 lists the 2023 fees for review of an application for a new source or for the modification of an existing source with an emissions increase.
Table 1: 2023 Fees for review of a permit application for a new source or for the modification of an existing source with an emissions increase (WAC 173-400-110(3))
| Action | Initial Fee | Hourly Rate |
| Basic Project | $1,904.00 for up to 16 hours of review | $119.00 per hour starting at 17 hours |
| Complex Project | $12,614.00 for up to 106 hours of review | $119.00 per hour starting at 107 hours |
(b) A project is considered complex if the emissions associated with the application include at least one pollutant for which emissions increases are greater than the levels in Table 2.
Table 2: Emission Threshold Table
(WAC 173-400-030)
| Pollutant | Annual Emission Rate |
| Carbon monoxide | 100 tons per year |
| Nitrogen oxides | 40 tons per year |
| Sulfur dioxide | 40 tons per year |
| Particulate matter (PM) | 25 tons per year of PM emissions |
| 15 tons per year of PM10 emissions | |
| 10 tons per year of PM2.5 emissions | |
| Volatile organic compounds | 40 tons per year |
| Fluorides | 3 tons per year |
| Lead | 0.6 tons per year |
| Sulfuric acid mist | 7 tons per year |
| Hydrogen sulfide (H2S) | 10 tons per year |
| Total reduced sulfur (including H2S) | 10 tons per year |
| Reduced sulfur compounds (including H2S) | 10 tons per year |
(c) Ecology may also determine that a project is complex based on consideration of factors that include, but are not limited to:
(3) Fees for review of a requested change to an existing order of approval. (WAC 173-400-111 (7) and (8).)
(b) "Administrative or simple change" means:
(c) Complex changes:
(ii) Examples of complex changes include, but are not limited to:
(d) Table 3 lists the 2023 fees for review of a requested change to an existing order of approval.
Table 3: 2023 Fees for review of a requested change to an existing order of approval (WAC 173-400-111 (7) and (8))
| Action | Initial Fee | Hourly Rate |
| Correcting a mistake by ecology in a permit | No fee | No fee |
| Administrative or simple change | $357.00 for up to 3 hours of review | $119.00 per hour starting at 4 hours |
| Complex change | $1,190.00 for up to 10 hours of review | $119.00 per hour starting at 11 hours |
| Permit extension request(WAC 173-400-111(7)) | $119.00 | Not applicable |
(4) Fees for review of an application for coverage under a general order of approval (WAC 173-400-560).
(a) Category A consists of the following general order of approval, including any subsequent updating or replacement:
(b) Category B includes a general order of approval developed on or after January 1, 2011. Category B covers, but is not limited to, the following general order of approval, including any subsequent updating or replacement:
(c) Table 4 lists the 2023 fees for Category A and B reviews of applications for coverage under a general order of approval.
Table 4: 2023 Fees for review of an application for coverage under a general order of approval (WAC 173-400-560)
| Type of source seeking coverage under a general order of approval | SEPA review complete | SEPA review required |
| Portable and stationary concrete batch plants(No. 08-AQG-002) | $625.00 | $981.00 |
| Perchloroethylene dry cleaners using less than 2,100 gallons per year (No. 06-AQG-003) | $625.00 | $981.00 |
| Stationary and portable rock crushers(No. 11AQ-GO-001) | $625.00 | $981.00 |
| Small water heaters and steam generating boilers (No. 08-AQ-G003) | $625.00 | $981.00 |
| Automobile body repair and refinishing shops(No. 08-AQG-001) | $625.00 | $981.00 |
| Portable and stationary asphalt plants(No. 10AQ-GO-01) | $1,093.00 | $1,450.00 |
| Dairy manure anaerobic digesters(No. 12AQ-GO-01) | $1,093.00 | $1,450.00 |
| Any other source seeking coverage under a general order of approval | $1,093.00 | $1,450.00 |
(5) Fees for review of a relocation notice for a portable source in ecology's jurisdiction under WAC 173-400-036.
(a) Table 5 lists the 2023 fees for review of a relocation notice for a portable source.
Table 5: 2023 Fees for review of a relocation notice for a portable source (WAC 173-400-036)
| Action | SEPA Review Complete | SEPA Review Required |
| Portable source has approval order issued by a clean air agency | $187.00 | $543.00 |
| Portable source has approval order issued by ecology | No fee | $365.00 |
(6) Fees for review of a request to establish a voluntary emission limit (WAC 173-400-091).
(a) This fee applies to a regulatory order issued under WAC 173-400-091 that places a limit on emissions.
(b) Table 6 lists the 2023 fees to establish a voluntary emission limit.
Table 6: 2023 Fees for review of a request to establish a voluntary emission limit (WAC 173-400-091)
| Action | Initial Fee | Hourly Rate |
| Review of request to establish a voluntary emission limit(WAC 173-400-091) | $714.00 for up to 6 hours of review | $119.00 per hour starting at 7 hours |
(7) Fees for review of a request to replace or substantially alter control technology without an increase in emissions (RCW 70A.15.2220).
(a) Table 7 lists the 2023 fees for review of a request to replace or substantially alter control technology without an increase in emissions.
Table 7: 2023 Fees for review of a request to replace or substantially alter control technology without an increase in emissions (RCW 70A.15.2220)
| Action | Initial Fee | Hourly Rate |
| Review notice of construction application | No initial fee | $119.00 per hour |
| Review RACT analysis and determination for affected emission unit | No initial fee | $119.00 per hour |
(b) Ecology will post a new fee schedule for the fees in this section starting in 2024 in accordance with WAC 173-455-031.
Major new source review preapplication and permit fees.
(8) Fees for review of a prevention of significant deterioration (PSD) determination (WAC 173-400-720, 173-400-730, and 173-400-750).
(a) Table 8 lists the 2023 fees for the review of a request for prevention of significant deterioration (PSD) determination.
Table 8: 2023 Fees for review of a request for prevention of significant deterioration (PSD) determination
| Action | Initial Fee | Hourly Rate |
| Written PSD applicability determination (WAC 173-400-720) | $4,760.00 for up to 40 hours of review | $119.00 per hour starting at 41 hours |
| Preapplication assistance beyond the application assistance meeting ecology provides | $714.00 for up to 6 hours of review | $119.00 per hour starting at 7 hours |
| PSD permit application - New(WAC 173-400-720 and 173-400-730) | $18,802.00 for up to 158 hours of review | $119.00 per hour starting at 159 hours |
| PSD permit application - Limited to greenhouse gases | $9,401.00 for up to 79 hours of review | $119.00 per hour starting at 80 hours |
| PSD permit revision - Administrative (as defined in WAC 173-400-750(3)) | $2,380.00 for up to 20 hours of review | $119.00 per hour starting at 21 hours |
| PSD permit revisions - Revision not administrative or major modification | $4,760.00 for up to 40 hours of review | $119.00 per hour starting at 41 hours |
| PSD permit revision - Major modification (WAC 173-400-720) | $18,802.00 for up to 158 hours of review | $119.00 per hour starting at 159 hours |
| Permit extension request(WAC 173-400-730(5)) | $625.00 | No hourly fee |
(9) Fees for nonattainment area major new source review.
(a) Table 9 lists the 2023 fees for nonattainment area major new source review.
Table 9: 2023 Fees for nonattainment area major new source review
| Action | Initial Fee | Hourly Rate |
| Notice of construction application (WAC 173-400-830) | $18,802.00 for up to 158 hours of review | $119.00 per hour starting at 159 hours |
| Change in permit conditions - Major modifications for an order issued under WAC 173-400-830 | $18,802.00 for up to 158 hours of review | $119.00 per hour starting at 159 hours |
| Change in permit conditions under WAC 173-400-111(8) - Action not subject to mandatory public comment under WAC 173-400-171(3) | $2,380.00 for up to 20 hours of review | $119.00 per hour starting at 21 hours |
| Changes in permit conditions - All other changes | $9,401.00 for up to 79 hours of review | $119.00 per hour starting at 80 hours |
| Permit extension request(WAC 173-400-111(7)) | $625.00 | No hourly fee |
(10) Fees for review of plant-wide applicability limits (WAC 173-400-720).
(a) Table 10 lists the 2023 fees for review of requests to establish plant-wide applicability limits.
Table 10: 2023 Fees for review of plant-wide applicability limits
(WAC 173-400-720)
| Action | Initial Fee | Hourly Rate |
| Plant-wide applicability limits - Establish new limits | $18,802.00 for up to 158 hours of review | $119.00 per hour starting at 159 hours |
| Plant-wide applicability limits - All other requests | $9,401.00 for up to 79 hours of review | $119.00 per hour starting at 80 hours |
(b) Ecology will post a new fee schedule for the fees in this section starting in 2024 in accordance with WAC 173-455-031.
Other fees.
(11) Table 11 lists the 2023 fees for all other permitting actions, including second and third tier reviews.
(b) The fee listed in Table 11 for third tier review (WAC 173-460-100) does not apply to a second tier petition that becomes a third tier petition under (a) of this subsection.
Table 11: Other fees for 2023
| Action | Initial Fee | Hourly Rate |
| Second tier review(WAC 173-460-090) | $9,996.00 for up to 84 hours of review | $119.00 per hour starting at 85 hours |
| Third tier review (WAC 173-460-100) | $9,996.00 for up to 84 hours of review | $119.00 per hour starting at 85 hours |
| Cost reimbursement agreement as provided in RCW 70A.15.1570 | No initial fee | $119.00 per hour |
| Review of a request for a variance under WAC 173-400-180 | No initial fee | $119.00 per hour |
| Review of a notification of intent to operate under WAC 173-400-035 | No initial fee | $119.00 per hour |
| Hourly rate for other permitting actions | No initial fee | $119.00 per hour |
(12) Fee reductions for small businesses. Ecology may reduce the permitting fees identified in subsections (2) through (6) of this section for a small business as provided in this subsection.
(a) Small business reduction.
(iii) For small businesses that ecology determines are eligible for a small business fee reduction under (a)(ii) of this subsection, ecology shall reduce the permitting fee to the greater of:
(b) Extreme hardship reduction.
(iii) Ecology may consider the following factors in determining whether an owner or operator has demonstrated special economic circumstances and extreme hardship, and in determining the amount of the fee reduction:
(c) Application for fee reduction.
(i) One of the following representatives of the small business must sign the application:
[Statutory Authority: RCW 70A.15.2210, 70A.15.2230, and 70A.15.6270. WSR 23-07-014 (Order 21-08), § 173-455-120, filed 3/3/23, effective 7/1/23. Statutory Authority: RCW 70.94.151, chapter 70.94 RCW, 2011 1st sp.s. c 50 § 302(2), and section 302(9), chapter 158, 2012 2nd sp.s. c 7. WSR 12-24-051 (Order 11-07), § 173-455-120, filed 11/30/12, effective 12/31/12. Statutory Authority: RCW 70.94.152 and 2011 c 5 § 301(28). WSR 11-12-077 (Order 10-04), § 173-455-120, filed 5/31/11, effective 7/1/11. Statutory Authority: RCW 70.94.181, [70.94.]152, [70.94.]331, [70.94.]650, [70.94.]745, [70.94.]892. WSR 07-11-018 (Order 06-14), § 173-455-120, filed 5/3/07, effective 6/3/07.]